Laserfiche WebLink
PERFORMANCE SPECIFICATION - CONT. <br /> SECTION IX CANOPIES-CONTINUED SECTION IX CANOPIES-CONTINUED SECTION X POST CONSTRUCTION TESTING REQUIREMENT <br /> x <br /> PART 2-EXECUTION PART 3-GENERAL-CONTINUED PROCEDURES FOR POST CONSTRUCTION TESTING s <br /> Z3 ACw: 3.2 IXECUTION 1.1 GCDPEOFWORK <br /> ?3.1 VERTICAL SUPPORTS SHALL BE ESIONED AND SPACED PER ENGINEERED(DESIGNED TO LOCAL 3.2.1 COORDINATE OFUVERV AND INSTALLATION WITH FUEL CONTRACTOR THROUGH LOCAL TwaDPARTVTEST6 ARE REQUIRED TO BE PERFORMED ON ANY POST CONSTRUCTION ACTNmES ASSOGATED WITH NEW <br /> DES)TRLCTURAL DRAWINGS SUPPLIED BY CANOPY MANUFACTURER REWSFORFASGA .MATRIALSSHALL SESTOREDATPOsmoNASINDCATDBr AnoN UPGRADE REACEMNT OR REPAIR OF OR TO THE UNDERGROUND STORAGE TANK(LISU SYSTEMS,IF THE e <br /> SIWLL ECARDNSTEEL CADMIUM PATEDOR GALVAIJIZED-SIDE AS REQUIRED. FUEL CONTRACTOR. WORK INVOLVES PRODUCT PIPING.TANK SUMPK ORPEN—SUMPS AND PANS OR <br /> SPILL CONTAINMENT <br /> 232 REFER TO PROJECT DRAWINGS FOR FASCIA MATERIAL AND INbi ON. 3.2.2 I <br /> G ANCHOR BOLTS AND REQUIRED TESTS AS THE NATIONAL 3RD PARTY TESTING <br /> DELIVERY TO FUEL CONTRACTOR 2 WEEKS PRIOR TO LOTION TESTING TO ENSURE THAT]ELEVEN MAINTAINS <br /> ZSS MATERIAL SHALL BE ONE OF THE FOLLOWING: AIMNGS AND IN ACCORDANCE WITH FUEL L <br /> CONTRACTOR'S SCHEDULF OFCON3TRI CTIONP R (AT o.RE.'F TTH4iiHE IIISTTA LAT,N CONTRACTOR PERFORMRTHE FEDUIRED TESTS ANO THE APPLIES <br /> I PRE FINISHEOMETAL FAsclA sysreM.EciD. 3.?3 wiTNRSD ON SITE BrA REcuwioRV Nnrr%iry THESE CASES mEIrvsTALAnory corvTrucroR Musi suamrt io Proro tt-0s to <br /> B FINISHED FASCw MATERIAL AO.E FUEL CONTIA—D AS PER APPROVED SHOP DRAHOR'oLTYPEo CONCRETE SHA119Eas PEa 1£LEVEN,I JC,WMPLwNc oEPARIMENrT"E ED rests As INTEL AS THE RESULT OFANY SUCH TEST DIRECTLY <br /> PRAMNG9VWN STYPE SIZE,AND PACEMNTOF ALL REINFORCED STEEL SHALL BEAOPR SHOP IT WILL NOT BE NECESSARY FOR TANKNOLOCT TO RETEST A COMPONENT WHICH WAS TESTED BY THE CONTRACTO,IF THAT <br /> PART 3-GENERAL 3.?d wc's INT-Tcnorva .II.REa IMME M'NlATELoFANv ORE'RTE ART' FFOKAN RE°ER osli coviEs of aEcuESS1oRINSFEcnoN FERPORIW THIN BHouR60 COMPLETION OF TATE ESTE OTHE AooREs ie ET oBe ow <br /> 1 FABRICATION DRAWING. PLAN FOR SIE TYPE AND PLACEMENT OFCANOP THE REQUIRED TESTS ARE DVIDDINTDTWO CATEGORIES,PEtuEL <br /> 311 PONSIBLE FOR PROVIDING ENGINEERED AND STAMPED OOP 3.2.5 PO IBLEFORBEINGPROPERLTLICENSEDINLOCAL THE TESTS PERFORMED DURING EACH PHASE ARE LISTED BELOW. QQ w N <br /> ASPITS <br /> NO MAY E REQUIRED.A COP OF THE PERMIT X Tex Z <br /> DRAWRNGSFOR OVERHEAD TRUCTEREAN0 FON0.4nON SYSTEMS. ON FILE IN THE OCALLNCONSTR CION OFFICE PRIOR TO COMMENDING WORK - ST PERFORM NEL IS INTRODUCED OR DELIVERED INTO THE LIST SYSTEM. U F �ztp U <br /> 3.1.2 DRAWINGSSHALL SHOW PROJECT LOCATION AND ADDRESS. MUST BE U Q� Q <br /> 313 ORIGINAL ENGINEER'S STAMP FOR APPROPRIATE STATE SHALL BEAFFl%FOTO EACH PACE OF 326 RESPONSIBLE FOR PROVIDING CONSTRUCTION OFFICE WITH THE FOLLOWING TESTS ARE RECOMMENDED TO BE PERFORMED BEFORE FUEL IS INTRODUCED INTO THE UST SYSTEM Z W� <br /> BEEINGLEANCE AS RDUIREDPER]£LEVEN,INC.INSURANCE SPECIFICATIONS AND S U <br /> DRAWINGS. WORK GONrw.cr FOR CONSTRUCTION.INSURANCE SHALL BE IN EFFECT FOR DURATIONS RETE-FUEL TEST ESTIMATEDTEST DURATION Z- >C3 <br /> 3.1.4 DRAWINGSSH4LL SPEGFlCALLV CALL OUT SOILS REPORT NUMBER AND DATE FOR WHICH W¢�¢ ZmZ W <br /> 32] RESPONSIBLE FOR PROTECTING ALL WORK OF OTHER STP BLIMPS MINIMUMd OURS >G W <br /> GNOPF LADY IN <br /> MAY BEREQUIRED. DI.PEN.ER SUMPSOONTNNMENT MINIMUM I OURS �Jf <br /> 3.1.5 DRAWANGSSHALLRSPECIFICALLV CALL OUT SIZE WEIGHT,TYPE AND NUMBER OF ALL <br /> CONTRACTORS <br /> ALR IN, LOUR J� W U <br /> sTRUCTURALMEMBERs 3.?3 LL BE RESPONSIBLE FORCONTACTINGANDOBTAININCAPP—LOF LU j Z <br /> W EQUIPMEM ON TOP OF <br /> 3.1.6 AL ENT CONCRETE WORK ALREADY IN PLACE.OF ANY HEA TANKGLOGT MAV USE ONE OF THE FOLLOWING TEST METODS.HVDR06TATIC,PRESSUREOR VACUUM. �� W;tn W <br /> DREQUIREDUOADINGS,WHICHEVER IS MR GA TRINGENT.MINIMUM DESI NLOAE SHALL BERTM 329 FUEL <br /> PRIG ESE PRESUEL resT3 MAY BE g3CHARGED ON 91TEa.LONG AS.THE WATER WAS NOT IN i ro LL <br /> =UCTURED TO BE'.WIG i6pl,LIVE 35N,UPLIFT 35p AND E.,IF APPLICATIONTO HIGH ATTITUDE <br /> ERAoIM1�LOaDING DEALLNSITYFOOTBASED ONAS.EMVD 55]-OFIRM DIISTAUMR,BE_R E CONDITION ISDIS_REDDURIIGM CONTACT WITH ANYFUEL EWATER USED TO LMT Q <br /> DESIGN SHALL BEADJL6 EDT TO COMPLY ACCORDNGLT.E EXCAVATION THE DESIGN ENGINEER SHALL BE OTFID IMMEDIATELY FOR SOL BEARINGVERIFICATICONTRACTOR PREPARATION FOR EL(BEFORE DELIVERY)TESTING U <br /> 3.1] DEFLECTION OF ALL STRUCTURAL MEMBERS SHALL BE LIMITED TO S-1 BG FOR L.L.ONLY. 3.2.16 LL BE PLACED AS PER]ELEVEN,INC.NEL PLANS AND AS PER S,PIPING AND GSPENSRS MUST BE ACCESSIBLE TO INCLUDE ASPHALTAND CONCRETE THATCAN BE DRIVEN <br /> 3.1.3 ATTACH DECK STRUCTURAL SUPPORTS PER ENGINEERED DRAWING.. APPLICABLE <br /> SITEPANS3� UPON <br /> 319 T 3.2.11 INO11UPPORT COLUMN66HALL BE CAPPEDAT TOP. CT PIFING,TMANK SUMPVSPILL BUCKET AND DISPENSER SUMP/LINER WORK MUST BE COMPLETE AND <br /> ETEULDH. 12 R G­ROD SSIBLE. <br /> LLED FOR THE SECONDARY <br /> RODUCT PIPING. <br /> ALVES MUST BE INS <br /> STRUCTURAL MEMIBERS SHALL BEAPPROVEDTBYY STRUCTUURALL ENGIOD NEER. ESTABLISHED CONNECTIONS TO 3.2.12 MATERIALS LIN ES ISLLMTH ALL SOFFITS BEING LEVEL <br /> AN.VERTICAL WALLS CORRECT <br /> OR ECTAD BE ALIGNED TRUE AND FIT AND ALL PINES BILL BE FIT,TRUE TO TEST-DISPENSERSSDO GTNEEDTAO BEIN PACEANDPRODUCT PIPING DOES OTNEEDTO BE PURGED. <br /> 3.1.16 RSNE ACCEPTABLETRAIGHTEDGE LINES.MATERIAL... LLBELEIINACCINTERSECTIONS= <br /> TP A LECONu TI-TO9E nsaENSSRS GwI1H CE"nN eNicHT BEFOREEHHEE SCHEa DTEsnuc WATERMUSTKBEUADDED io A W• <br /> STRENGTH TOAMINIMUM 3666 LBS.PER <br /> SpUARETNCH WITIH 2S oHTG fLER PouRINCOG�PR FAINUEO Sr OmRs.ALL METAL SHALL BE REE OF DEBRIS AS MAY BE REQUIRED FOR FINAL 'H ONF3NCHESABOVE ED UR TOPLLOw THE NIAreRLEVELTO6ABIUDE AND MARK THE LEVEL OF <br /> 3 nANALL "LL BE MADE Rs(IXCRixz BARs)AND PAINTINc(FINIswNc. R EN TE THE war BAD R PEaMLADNErvr EV MAMER�L NETRAnoN'L M" OR PA <br /> AB CONFORM TO THE REIQUIREIAEMS OF"THEB TANDARD SPEGFICATIONA.S.T.M.615 GRADEd 33'13 AND=TIN OE CONCRETE AROUNLBE R"`D CAIpP COWMN6reIGOVERING AN CH OR BBAIE PLAOLTS AS MAY BEPOST FUEL TEST-TEST PERFORMED AFTER FUELLS INTRODUCED OR DELIVERED INTO THE UST SYSTEM. <br /> 3.1.12 DRAWIGSSHA L EXPUGTLY SHOW LOCATION OF DOWN SPOUTS,INTERIOR PVC DRAINS 32 A REQUIRED. uRwL STEEL REE OF DEBRIS.PRIMES POST-FUEL TEST ESTIMATED TEST DURATION <br /> CATIONWS ROD oRAINNEEAS PND LEADRELATED <br /> RS sHALLL 6E DIRECTEDDOW,THE'NTPRIORFICPNOPCOLUMN ANG REEADY FORARNAL Pa INT ALLLESBy FUELEX CONTMcioL. ERsn E Iwmum 11puR PER <br /> DOWNHILL SIDE OF ISLANDGDEOF ND LEVELRABOVE <br /> FINISH GRADE OF CONCRETE SIDE PAD ON 3.3 RESPOGIBIUUESOFFUELCDNTRACTDR: FIMARTCIGHTNESS MINIMUM21rz HOURS <br /> TAN •A j <br /> Lu o <br /> SAAS INCLUDE IN DESIGN PROVISION DR OVERFLOW DEVICEAT OPPOSE CORNERS OF CANOPY. 331 SHALL BE DY DRSPONSIBLE FOR A MINIMUM E3ob1Y NOTIFICATION OF DATE WHEN SITE WILL BE KDEIECTOR COMPLETED DURING G <br /> 51.14 LCno"NOTSPEGFICALLT INDICATED SHALL BEACCOMPUSHED PER MINIMUM LATICES OF GASOLINE CANOPY TNALITFNK UG�E FEND CRTIFlCATION MINIMUM 2 IORDUFS <br /> REQPRi EMNTS oFTHE UNIFORMBDLgNGCODE LATEST EDITION. 3.32 DDAE SELLAE NFUEL CO TREQUARMTDR AANNDD"a IRY CONTRACTOiR'aaoETESHALLcorvanoN REQUIRED Br sTare OR LOCAL oaq"aNE <br /> 31.ts NERAL GES OR WITH FREEOFSHALL PERFORM SITE WoaKAS y <br /> sPECIFICATIoG,THE MOST STRIGNi ReouIaETIENis covEa"nID GENERAL MAr BE REQUIRNio coMPLr. 'DOESNOTINCLDE NEwauioMAnciANrc GAUGE wicl INSTALLATION cERnFIcnnory of NEWATG Is THE RESPOGIBwTv <br /> 3.1.16 SPECIFICATIONS SHALL REAPPROVED BT]£LEVEN,INC.. 3.3.3 OT INSTALL GASOLINE DISPENSERS PRIOR TO CANOPY ERECTION, THEINSTALLINGCONTRACTOR. <br /> GGNOniUCTIONREPREOEMATNE OR <br /> PON IN WRITING BETWEEN THE CANOPY CONTRACTOR AND FUEL ND ED TO PERFORM TESTING q5 ANDroR SELL BUCKETS AFTER FUEL Is <br /> ES&AAS EEDOR ONALLN OF(STP)SUM O <br /> COMRACTOR. INTRO DIDELIVERD INTO THE UST SYSTEM CANNOTBE PSCHAR ONSITE. <br /> 3 1] -4 WEEKS PRIOR TOGO MENCEMENTOFDRAVINGI"ALL BE RED TI APPL­l CONSTRUCTION NO <br /> SHARUITLL COMMENCE PRIORTO3.3.d NERALCONTRACTOR 6HALLEE RESPONSIBLE EOR THE INSTALLATION OF CANOPY FOOTINGS A6 <br /> APPROVAL OF RAWNGS BT]ELEVEN INC s CONSTRUCTION REPRESENTATIVE DESIGNED IN SHOP DRAWNGS PROVIDED By CAGPY MANUFACTURER,PONDING ALL STEEL,ETC., CUD <br /> SHALLL BEE POURED INA SUFFC NT MOUPOLTSNT OF TIMBE EVSOPOP RCDPY URINO TIME IS ALLOWED.NGS THAT IS OR WAS IN CONTACT WITH FUEL MUST BE PROPERLY DISCHARGED IN ACCORDANCE WITH APPUUBLE FE—L <br /> STATE ANDOR LOCAL REGULATIONS. <br /> 3.3.1 PONGELEFOR PAINTING OFALL METAL AND TRIM AS IN <br /> RELA DTO THE GASOLINE CANOPY AS PER]-ELEVEN STORE STANDARDS MANUAL. CONTRACTOR PREPARATION FOR POS DELIVERY)TESTIG ~O <br /> 3.3.6FUEL PONSIBLE FOR ALL WIRINGANDINSTALLATIONOFLIGHTS, - PA" W N C <br /> SIGNS SECURITY IN GASOLINE IGTALATION.G.C. -COMPARTMENTALIZED TANKS MUST HAVE FU EL LEVELS WITHIN iB OF EACH OTHER. <br /> SHALL CAULK SEAL ALL LIGHT FIXTURES TOOCANOPY DECK. ALL FUELING INCLUSIVE OF STAGE I AND STAGE II VAPOR RECOVERY AREAS THE FOLLOWING COGILONO MUST APPLY. TD v <br /> 3.3.7NGE.THSHop REQUIRED CT PIPING MUSTBETHOROUGHLYPURGEDOFAIRANDVAPORS. {� y <br /> NCHORBOUSI IN ACCORDANCEINoPySHOP DRAWINGS AS RELADRATED THERETO.AND PwCEMEM OF -LE DISP LASERS MUST BE SET AND OPERATIONAL TO INCLUDE ALL VAPOR VACUUM PUMPS AND OTHER STAGE II o N O U <br /> INCHEQDIPMENTNLLYNNCTIONSL.REPLACEFILTERAFTER PURGING. <br /> 3.4 WARRANTIES'.C.AGPYCONTRACTOROHALLWARRANTN,INWRITINGTCOMPLETEC.AGPYINSTALLATION FORAMINIMUM - NGIG HARDWARE MOOT BEIGTALLEDAG OPEfwnOUP o�qm&`o vSA�s'v^ <br /> PER 11`11 A RCLUgNG ACTOOFMMANG DDAGG MALWARANDAIEIAORTIO BE FREE OF DESIGN <br /> INbTALATION - 3,PIPING ANO gSPEGER3 MUST BEACOE391BLE TOINCLUDE A.PHALTNJOWGRETE-CAN BE RIVEN <br /> DEFECTS <br /> TE6TVALVESMUSTBEINSTAIIEDF RTHESECONDARYPRODJCTPIPIG. <br /> 3. RESPONSIBLE FOR CLEANUP AND REM OVAL FROM SITE ALL TRASH AND - 2 <br /> DRRis aEsuMi irvc omaWAo KR=N.TOINSTALLAnONOFCANDPY. �A miE F oesi;a <br /> a CON TFICATIONTOTESTING COMPANY RANKNOLOGV)_ xa <br /> IS RCOMNOEoiHAT mEcoNTRAcioR PRovloE rvonFlranoN TO TArvKGLOcr of THENEED io PERFORM TESTS ne.; s €Sao@_ <br /> PRIOR TO THEANTICIPAT NT EST DATE HOWEVER,TO ENSURE TE STS ARE CONIXICTED IN A TIM ELY MANNER A �Nmg�Sn 9 <br /> MINIMUM OF FIVE ME)DAY.IS REQUIRED.TANKGLOGT UNDERSTANDS—ACTUAL DAEMAT CHAGE BY PRONDIGmEM dol mBm O�§g&�s <br /> P <br /> N—TOR MUST KE TA GLDGT APPFISEO TFT EN.N.PAiEo3DL TTE FTH.TIME FLATUTHE TOESTNC AS HE <br /> NEEDED As <br /> PRODECTED DATER CHANGE. <br /> 3 <br /> x aR3f <br /> n 4x„ARre b� <br /> oti <br /> gSHEET: <br /> G17.0 <br /> FUELING-USA <br />