My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
INSTALL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 9:33:30 AM
Creation date
5/31/2022 1:10:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2022
RECORD_ID
PR0518288
PE
2351
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F Series Full-Body FRP Termination <br /> Entry Fittings for Single- or Doublewall <br /> FRP Sumps <br /> 0 UL 2447 Listed <br /> F Series Full-Body / <br /> Round Sump Wall <br /> Pipe type Part# Description EP1 00 Epoxy <br /> '-• • <br /> 3/4" galvanized F-07S-0-R 3/4"galvanized conduit,full-body with duel injection ports, EPDXY 2 <br /> conduit REQ'D <br /> 3/4" PVC coated F-07RS-0-R 3/4" PVC coated conduit,full-body with duel injection ports, EPDXY 2 <br /> conduit REQ'D <br /> 3/4" galvanized F-07S-0-DR 3/4"galvanized conduit, doublewall full-body, duel injection ports 2 <br /> conduit and tertiary boot seal, Round wall FRP, EPDXY REQ'D <br /> 3/4" PVC coated F-07RS-0-DR 3/4" PVC coated conduit,doublewall full-body, duel injection ports 2 <br /> conduit and tertiary boot seal, Round wall FRP, EPDXY REQ'D <br /> 1" galvanized F-10S-0-R 1"galvanized conduit,full-body with duel injection ports, EPDXY 2 <br /> conduit REQ'D <br /> 1" PVC coated F-10RS-0-R 1" PVC coated conduit,full-body with duel injection ports, EPDXY 2 <br /> conduit REQ'D <br /> 1" galvanized F-10S-0-DR 1"galvanized conduit,doublewall full-body, duel injection ports and 2 <br /> conduit tertiary boot seal, Round wall FRP, EPDXY REQ'D <br /> 1" PVC coated F-10RS-0-DR 1" PVC coated conduit, doublewall full-body, duel injection ports and 2 <br /> conduit tertiary boot seal, Round wall FRP, EPDXY REQ'D <br /> 3/4 brass ground- F-07-GR-R 3/4" brass grounding rod,full-body with brass conductor and 2 <br /> ing rod clamps, EPDXY REQ'D <br /> 3 x 2" FRP F-32S-T-R 3x2" FRP,full-body taper by slip; dual test ports and single injection 2 <br /> port, EPDXY REQ'D <br /> 4 x 3" FRP F-43S-T-R 4x3" FRP,full-body taper by slip; dual test ports and single injection 3 <br /> port, EPDXY REQ'D <br /> 6 x 4" FRP F-64S-T-R 6x4" FRP,full-body taper by slip; dual test ports and single injection 3 <br /> port, EPDXY REQ'D <br /> 3 x 2" FRP F-32A-T-R 3x2" FRP,adjustable full-body taper by slip;dual test ports and 3 <br /> single injection port, EPDXY REQ'D <br /> 4 x 3" FRP F-43A-T-R 4x3" FRP,adjustable full-body taper by slip;dual test ports and 3 <br /> single injection port, EPDXY REQ'D <br /> orders@sbravo.com 117 <br />
The URL can be used to link to this page
Your browser does not support the video tag.