My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
INSTALL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 9:33:30 AM
Creation date
5/31/2022 1:10:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2022
RECORD_ID
PR0518288
PE
2351
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEAK DETECTION <br /> 1 ECHNU1., UV1E5LLC <br /> Exclusive Providers for MDleak® and PHDleak® Technologies <br /> 1400 East Paseo Pavon • Tucson,AZ 85718 • Phone 855-255-5325 • FAX: 520.990.8965 <br /> Sales@LeakDetect.net • www.LeakDetect.net <br /> New Construction Pretest Review Checklist for <br /> Contractors <br /> 1. General: <br /> a. Contractor must be onsite to make any repairs to the UST System identified by <br /> LDT <br /> b. Any specialty equipment required shall be supplied by contractor <br /> i. Example; confined space entry equipment <br /> 2. Tank Sumps: <br /> a. Primary vent piping should be pressurized to test pressure <br /> b. Secondary vent piping should be pressurized to test pressure <br /> c. Secondary boots must be completed and include test ports reachable by LDT <br /> technicians <br /> d. Tertiary boots must be completed and include test ports reachable by LDT <br /> technicians <br /> 3. Dispenser/s, UDC/s, Transition Sumps, and/or Piping Terminations: <br /> a. Primary product piping should be pressurized to test pressure at a test fitting <br /> located at the piping termination end or shear valve. <br /> b. Vapor return, and/or return piping should be pressurized to test pressure at a <br /> test fitting located at the piping termination end or shear valve <br /> c. Shear valves must be disconnected from dispensers and caped with steel caps <br /> d. Secondary boots must be completed and include test ports reachable by LDT <br /> technicians <br /> i. Secondary piping including VR should be pressurized to test pressure <br /> e. Tertiary boots must be completed and include test ports reachable by LDT <br /> technicians <br /> For questions please contact: David Rabb <br /> VP of Business Development <br /> Office 855-255 LEAK(5325) <br /> David.Rabb@LeakDetect.net <br /> www.LeakDetectionTechnologies.com <br /> www.LeakDetect.net <br /> Author David Rabb <br /> 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.