Laserfiche WebLink
LEAK DETECTION <br /> 1 ECHNUI., UV1E5LLC <br /> Exclusive Providers for MDleak® and PHDleak® Technologies <br /> 1400 East Paseo Pavon • Tucson,AZ 85718 • Phone 855-255-5325 • FAX: 520.990.8965 <br /> Sales@LeakDetect.net • www.LeakDetect.net <br /> New Construction Final Review Checklist for Contractors <br /> 1. General: <br /> a. Notify appropriate/s governing regulatory agencies as required <br /> b. All final surface work above the buried fueling system must be complete and include: <br /> i. Asphalt <br /> ii. Concrete, brick, and/or other hard surfaces <br /> iii. Landscaping <br /> c. Contractor must be onsite to make any repairs to the UST System identified by LDT <br /> d. Any specialty equipment required shall be supplied by contractor <br /> i. Example; confined space entry equipment <br /> e. The entire fueling systems must be completed including electrical and communication wiring <br /> 2. Tanks: <br /> a. Complete all tank work trim installation to include backfill, capping and manway/s <br /> b. Remove all water ballast from tank/s <br /> 3. Tank Sumps: <br /> a. Primary vent piping should be pressurized to test pressure <br /> b. Secondary vent piping should be pressurized to test pressure <br /> c. Tank gauging equipment must be completed including electrical <br /> d. Turbine equipment must be completed including electrical <br /> e. Leak detection equipment must be completed including electrical <br /> f. All low voltage equipment must be completed <br /> g. Secondary boots must be completed and include test ports reachable by LDT technicians <br /> h. Tertiary boots must be completed and include test ports reachable by LDT technicians <br /> 4. Dispenser/s, UDC/s, Transition Sumps, and/or Piping Terminations: <br /> a. Primary product piping should be pressurized to test pressure at a test fitting located at the <br /> piping termination end or shear valve requiring a ball valve at the turbine <br /> b. Vapor return, and/or return piping should be pressurized to test pressure at a test fitting located <br /> at the piping termination end or shear valve <br /> c. Shear valves must be disconnected from dispensers and caped with steel caps <br /> d. Secondary boots must be completed and include test ports reachable by LDT technicians <br /> i. Secondary piping including VR should be pressurized to test pressure <br /> e. Tertiary boots must be completed and include test ports reachable by LDT technicians <br /> For questions please contact: David Rabb <br /> VP of Business Development <br /> Office 520.207.4878 <br /> Cell 520.906.5474 (USA) <br /> David.Rabb@LeakDetect.net <br /> www.LeakDetectionTechnologies.com <br /> www.LeakDetect.net <br /> Author David Rabb 10f 1 <br />