Laserfiche WebLink
LEST REDUCER FITTING(IYP.)139 ,34 4'COAXIAL-UPP"REMOTE FILL PRODUCT PIPING(TYP.) <br /> PRIMARY COUPLING ,3] ]5 4'BONDED 125 116 4"OVER 3"FRP VAPOR <br /> FlTTING RECOVERY PIPING(TOP.) <br /> 4"FEMALE TERMINATION ERRING(IYP.J 138 <br /> SUMP SENSOR(SEE NOTE#3) J1 ]5 4"BONDED ERRING <br /> 3'EZ-FIT%FEMALE GLUE PIPE FOR <br /> 3"OVER 2'SUMP CROSSOVER)1p 204 Q <br /> FRP PIPING W/GROMMETED px Sf FIBERGLASS PIPING ffl J <br /> END CAP TO CONTAIN VACUUM 116F� 1' S0 3'x12'FLEXIBLE CONNECTOR W/EZ-FIT 4 V <br /> TUBING ONLY(IYP.)(--% � MALE x FIT FIT FLANGE(SEE NOTE K,0) & Z W Q <br /> 3"BONGED FITTING(TYP.)]J 206 2"EZ-FIT X EZ-FIT ADAPTER(TYP,) J F LL <br /> 3'EZ-FIT CLAMP W/200 201 2"EZ-FIT 90 DEGREE ELBOW(TYP.) J U Z <br /> VITON SEAL(WE.) �� W 4'.4'x3"EXTRACTOR <br /> 22 <br /> e/ CROSS FITTING F Y Q N O <br /> 2"EZ-FIT CLAMP W/200 2 U N <br /> VITON SEAL(ttP.) 9J SUMP FLAME ARRESTOR <br /> 2'x12"FLEXIBLE EG <br /> (s <br /> 12 / 49CONNECTOR W/ a Z O <br /> B \ \ / B EZ-FIT MALE x Ex -ate. Z N () <br /> TS- TS- FLANGE d <br /> 54'DOUBLE WALL POLYSIDE q 3'FRP BONDED & 0 0 <br /> FIBERGLASS CONTAINMENT SUMP 73 ED CFYP.) 0 & Z <br /> 110 116 3'OVER 2"FRP Q <br /> "'VVVdd VENT PIPING(ttP.) a z <br /> 1"FRP BONDED CONDUIT J1 `\ 72 3'FRP BONDED FITTING(TYP.) ° <br /> PENETRATION FITTING(TYP.) <br /> 3/4"X 15'FLEXIBLE CONNECTOR 45 G ADDITIVE PIPE <br /> TS- CONNECTION <br /> SECONDARY COUPLING(TYR)140 203 3'EZ-FIT X MALE HEX ADAPTER(TYP.) <br /> 4'COAXIAL'UPP"REMOTE FILL VAPOR PIPING(TYP.)134 201 "EZ-FIELBOW'(tt(TP.) <br /> ' DEGREE <br /> Fill Sump and Hydrostatic Reservoir Plan View a Tank#5 Only NOT USED NOT USED <br /> T5-2 SCALE 1"=,'-0" TS- scALE NONE T5-2 SCALE:NONE <br /> MAINTAIN 5'MIN,6'MAX.CIFARANCE <br /> BETWEEN TOP OF CAP AND GRADE 3]ACCESS MANHOLE <br /> (SEE NOTE#4) �8„ 10'ABSOLUTE MIN. <br /> 4"PRODUCT I.O.TAC. DISTANCE TO TOP EDGE <br /> RECESSED FLUSH W/CONC.12 MIN.ttP. OF SUMP NECK N <br /> ( ) 2'CROWN 5 E QW p <br /> NOTE 6 (0 5 GD <br /> d W a< <br /> ° =w3 <br /> BRINE SUMP RESERVOIR y <br /> &HYDROSTATIC SENSOR 2fi MANOMETER&HDPE TUBING TO TEST N <br /> 3 = <br /> MONROR CAP&TRAP B0 PORT FOR CONTINUITY TESTING o J <br /> - <br /> OR PER CARE VR-102 FIELD-CUT(LENGTH As NEEDED) F Q <br /> 4'FACE SEAL ADAPTER BO NIPPLE BY G.C. 0 GoW <br /> u(2)1-&(2)4"GNG CLAMPS COUPLER(BY G.C.) <br /> W/#6 BARE SOLID <br /> 63 SUMP FLAME ARRESTOR(NP.) <br /> 54'DW DIA.SOME 4 <br /> 64 MOUNT FOOT-STEP i0 RISER <br /> EXPLOSION PROOF ELECTRICAL <br /> SEAL-OFF,6'ABOVE HIGHEST 30 4"IS,IRON RISERS(SEE NOTE#9) <br /> PENETRATION(ttP.SEE NOTE#]J LQ <br /> 2) <br /> CONTRACTOR SUPPLIED R & <br /> MOUNT FOOT-STEP 64 CLAMPS FOR CONDUIT SUPPORT. <br /> RISER(IYP.2) ATTACH TO RISER WITH U-BOLT <br /> VACUUM TUBING ROUTED - CLAMP.(WP.®ALL CONOUIIS) <br /> TO DEVICES MONITORED - 3 J1 4'COAXIAL"UPP"REMOTE FILL <br /> IN FILL SUMP(IYP.) 1 134 VAPOR RETURN PIPING(FEE.) <br /> 1 4'COAXIAL"UPP"REMOTE <br /> SAID WELD TO MAIN 1 134 FILL PRODUCT PIPING(ttP.) <br /> GROUNDING WIRE. 1"30 1 <br /> ROOM TO GROUND ROD , TANK TOP(TYP.) <br /> JACK SCREW 80 1 <br /> 1 <br /> DROP TUBE W/OVERFILL PREVENTION 15 22 4'x4"x3'EXTRACTOR FITTING „gTEs o,T <br /> VALVE SET®959.CAPACITY.TERMINATE 31SUMP <br /> SENSOR (ttP.) <br /> DROP TUBE MIN.4",MAX.6"ABOVE <br /> STRIKER PLATE(TYP.SEE NOTE#5) NOTE:THE EQUIPMENT DEPICTED AND LISTED ABOVE IS <br /> 1/4"DRAIN/TEST BUSHING. IN ACCORDANCE WITH CARD EXECUTIVE ORDER VR-102 <br /> FACTORY INSTALLED FOR STAGE ENHANCED VAPOR RECOVERY(EVE) <br /> Fill Sump Installation Detail a Tank#5 Only �D1 NOT USED rF NOT USED L, � <br /> \TS-y SCALE:NONETS- SCALE NONE <br /> Sheet Notes t <br /> 1.-PIPE&ET TO PENETRATIONS: <br /> I <br /> ALL PENETRATIONS OF RHE TANK SUMPS BE SEALED WITH DOUBLE BULKHEAD FITTINGS SHALL BE INSTALLED PERPENDICULAR TO SUMP WALL TO ENSURE THE PROPER INSTALLATION OF ALL BULKHEAD FITTINGS AND RESULTANT WATER TIGHTNESS.ALL PIPING. <br /> OUNDS THAT PENETRATE lHSUMP 510E WALLS MUST HE SEALED IN SUMPS,SUMPS SHALL BE HTDROSTARCALLT TESTED WITH STANDING WATER FORA PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS ARE WATEMIGHi. I X11 <br /> 2.-PIPING TESTINGre MES s e 6 <br /> TESTING OF THE SECONDARY CONTAINMENT PIPING IS REQUIRED.THE CONTAINMENT IERMINATON MIND IN THE SUMP IS TO BE INSTALLED WITH THE VPLVE T1RNE0 DOWN.THE PIPING IS i0 BE CONTINUOUSLY MONITORED BY VACUUM,PRESSURE OR d 8 <br /> HYDROSTATIC.THEREFORE ME VALVE UNLESS BEING TESTED SHOULD REMAIN CLOSED. <br /> 3.-SUMP SSENSORS: <br /> TOSO LOWEST POINT IMOUNNTED SDMPTBOTTIDEOMFALLNTANK SUMP SEK WHERE NSORSR SHALLGBEENONNADISCRIIAINNT'ATNG AND POST IN <br /> SENSTVEMADE IND OW LOWEST PENETRATION FIRING WITHIN SUMP AREA MOUNT SENSOR FLUSH <br /> 4.-FlLL AND VAPOR CAP HEIGHT TO GRACE: acu x MALE ennncx Om.) ••S <br /> THIS DIMENSION IS CRITICAL AND MUST BE ADHERED 10.CONTRALTOR WILL BE REQUIRED TO REINSTALL AT OWN EXPENSE OR WILL BE BACK CHARGED FOR EXPENSE TO CORRECT INCONSISTENCIES. <br /> DROP TIRE CRITICAL DIMENSION: T/4's-wnr IVO vnlvE c xoxoEY 11I <br /> THIS DIMENSION IS CRITICAL AND MUST BE ADHERED To.CONTRACTOR WILL BE REQUIRED To REINSTALL AT OWN EXPENSE OR WILL BE BACK CHARGED FOR EXPENSE TO CORRECT INCONSISTENCIES. g <br /> MANHOLE CROWNS', RAE pIpIM'pyp) C <br /> AM MANHOLE OPENINGS ON THE TANK SLAB SHALL BE INSTALLED WITH A 2'X 18'RUN CROWN OF CONCRETE TO PREVENT WATER INTRUSION INTO ME MANHOLE. 1 g C <br /> ].-NEG.CONDUIT: ai <br /> AM U.G.CONDUIT TO TANK SUMPS SHALL BE ROBROY RIGID STEEL PJC COATED SCHEDULE 40(NO SUBSTITMIONS.CONDUIT MINIMUM BURY DEPTH IS 24"PER CODE.ALL JUNCTION BOXES SHALL mnxcs x 3/a'eul reFnucTre g Q$ <br /> LAOS 'IVr111 1 CONDUIT IN SUMPS SHALL INCLUDE A SEAL OFF ENTERING ANO LEAVING,SEAL OFFS SHALL BE INSTALLED 6 MIN.ABOVE HIGHEST PENETRATION IN SUMP. a/a mRxom F ex al <br /> 8.-FILLC&VAPOR RISER DROUNDINGELEC65 x/o�• a IeLT Q g <br /> ALL FILL AND VAPOR RISERS SHALL BE GROUNDED TO PREVENT STATIC DISCHARGE.SEE DETAIL E ON SHEET E-4 FOR RISER GROUNDING DETAIL 6/e'3-WAr xnLL—E eo ya�x,/4' cio <br /> 9.-STAINLESS STEEL FITTINGS: (NP) xevx3/ti x'T's ER #+ <br /> CONTRACTOR TO PROVIDE ALL MISCELLANEOUS NPT FITTINGS AND NIPPLES FOR CONNECTIONS TO TURBINE,SIPHON SYSTEM i x/a'IEB- E3 <br /> AND VAPOR RECGV SYSTEM,ALL STAINLESS STEEL FITTINGS SHALL BE MANUFACTURED BY'STANDARD PIPE PRODUCTS" xTO 5 <br /> OR EQUAL SPECIFICATIONS As FOLLOWS: 2 <br /> S.S.FITTINGS DIMENSIONS MATERIAL THREAD PRESSURE RATING z xPT xTry .5 <br /> (TEES,ELBOWS) ervx Tov Ovv) S <br /> CLASS 150/PN 20 ACME 816.3 ASTM A-182 ASME B.1 20.1 ASME 316.3 <br /> S.S.UNIONS <br /> CLASS 15C/PN 20 ASME B16.39 ASTM A-182 ASME B.1 20.1 ASME 315.3 <br /> E.E.PIPE i/4'SS.-NG l(s�rvc R io vn�11' y/4 THRuoEo Pwc <br /> CLASS 150/PN 20 ASTM A]33 ASTM A-312 ASME B.1 20.1 ASME G1H.J Tc TAxx TOM R <br /> CORROSION PROOF: �1Gasoline Side Sump Section Detail For Additive Automation p$ N <br /> ALL TURBINE PUMP HEADS To HAVE ADVANCED CORROSION PROOF PROTECTION WITH E-COATED FINISH. T§- SCALE:1°—11—0 p ., 12 <br />