Laserfiche WebLink
GENERAL NOTES <br /> AREA LIGHT. 1. SEE MATERIALS EST(T2-1)FOR DESCRIPTION ON EQUIPMENT USED IN <br /> THIS CONSTRUCTION. 03 <br /> 2 ROUTING SHOWN ARE SCHEMATIC,HNAL LOCATIONS STALL BE SHOWN ON BE <br /> A s-BLOT DRAWINGS. O <br /> LIGHT POLE 3. ALL EQUIPMENT SHALL BE INSTALLED AS PER MANUFACTURER'S OR OWNERS Z QQ <br /> GUIDELINES,WHICHEVER IS MORE STRINGENT, Q J <br /> Z <br /> 4. FUNCTIONS OF THE CONTINUOUS MONITORING: Q W <br /> -MONITORING OF ALL ANNULAR SPACE. Z Z LA Q <br /> -MONDORING OF ALL PRODUCT PIPING AND BLL SUMPS. a OOII W <br /> -PROVIDE TPRESSURE ENE LEAK DETECTION(PLED)OF PRODUCT LINES. IL <br /> -PROVIDE CONTINUOUS <br /> CONTININ UOUS TANK LEVEL MONITORING. IL V Z <br /> WIRELESS CAMERA <br /> -MONITORING OF ALL DISPENSER SUMPS. W <br /> � JJ <br /> SPECIFIED BY THE CONTINUOUS MONITORING ONCE SHALL PROVIDE POSITIVE SHUTDOWN OF TURBINES Do N O <br /> COSTCO AND UGH THE <br /> AUTOMATICALLY E THE EVENT OFA LIQUID CLESURELEASE AND MEMNEY (p (J U f0 <br /> .ITCH A THE ESO SWITCH LOGIN.ON ME CONTROLLER ENCLOSURE AND REMOTE E90 - <br /> SWITCH PS INDICATED ON SITE PUN. Q 3 <br /> 5. ALL WIRES ENTERING CONTROL PANELS,MAIN PANELS,AND SUB PANELS SHALL BE a V 8 <br /> GO N6 AD S FOLLOWS TAPE <br /> REND L I AREA UGHi b U <br /> 41 L "A"PHASE=BUCK MT O <br /> MONITORING PHASE=RED o W U <br /> TURBINE UNLFAD D "C"PHASE=BLUE <br /> POWER 10 1 B oFG]46 O 38T NITORI NK 6. ALL CONDUCTORS SHALL BE CONTINUOUS(WITH NO SPLICES)STRANDED COPPER WITH <br /> TURBINE 10 1 OP-8.10.12 ]5'C THWN INSULATION,OIL AMC CAS RESISTANT. <br /> POWER ]. A SEAL OFF MUST BE INSTALLED PRIOR TO ENTERING AND LEAVING A F <br /> X BASE BY OTHERS HAND HOLE CLASSIFIED AREA CONDUITS FIRST EMERGENCE FROM BELOW GRADE MUST BE a 4 <br /> TP 4K RISER GROUNDINGS NLIJ.OE CONNECTED TO A SEAL-OFFTURBINE REGUU SGL-OFFALL TANKS) 1p 1 RJ NKoc <br /> SPARE B. ALL CONDUITS SHALL HAVE INSUUTED GROUNDING BUSHINGS INSTALLLD AND TIED TOGETHER W/#6 BARE COPPER <br /> TURBINE :]U <br /> P 1315'1 ® 3 NITORICOMMUNICATIONS PUNTER WIRE.BONG ALL INSUUTEO GROUNOINC BUSHINGS ANO GUTTER BO%BACK TO POWER CENTER GROUND.00 NOT <br /> POWER 10 1 P-19,21.23 APED RE INTRINSICALLY SAFE BARRIERS. <br /> POWER 9ALL INSTALIARONS SHALL BE PER N.E.C.,ARTICLE 514. <br /> PROCESSOR 10.PLL EQUIPMENT SHALL BE UL.APPROVED. <br /> 25,21,29URBINE 10 1 DED NK GLENOID CONTROL WIRING —III 11.ALL EQUIPMENT REQUIRING AOA HEIGHTS ARE TO BE TAKEN FROM A LEVEL FIAT SURFACE. VERIFY IN FIELD. <br /> P 14,1618 pNLEAUM - �6 DP-1,3,5 ® J8 II12.ALL ELECTRICAL WORK SHALL BE DESIGNED/INSTALLED 2020 CALIFORNIA <br /> gOWER DP-1,9,11TURBINE - TANK TURBNE IO 1NTORIFLOW M9 ERDTURBNE POWER, ELECTRICAL CODE.AND 201]NATIONAL ELECTRICAL <br /> POWERP-2g22,2> ANKEOMONITORING POWERTURBINE101fi TURBINESEMDP-2828POWER KEY NOTES <br /> CAF;DQTANKMONITORINGVENT SUMP TO 2 ❑WIRE TWO(2)NEW FEPETROVARIABLE SPEED 2LIP TURBINES.REOUSEEXISTING CONDUITSMONITORING POWERBTO MWI <br /> O 9 444 <br /> �n�>7 <br /> fOISTACK OVERFILL AIRMPANEL'A' AND ROUTE TO NEW CONTROLLER ENCLOSURE.PULL ALL NEW WIRING PER PLANS. J N9 2 ] ] 9 Z 2 m — Tank Pad Area Light 2❑RISTING MULVINNYGIS 2 pM TALLED IN THE EXISTING EDP ROOM,FIELD VERIFY LOCATION WITH CONSTRUCTION PM Wm111 SEE CONDUIT$5 98 05 J 98 05 ] I INSTAL ATION --- J <br /> IOTES 3 REMOTE ALARMS ON THE EXTEROR OF THE EONTROLLER ENCLOSURE SHALL TI AUDIBLE AMU NSUAL VEEDER-ROOT O Q Q <br /> 10 10 J9 19 ] VEEDER IQ00T ❑FROM <br /> 350R IS MOUNTED ON THE INTERIOR.VERIFY LOCATIONS WITH CONSTRUCTION PM OR MULVANNYG2 PM. =W 3 <br /> CANOPY 1 2 RUN ONDUIT UP EXTERIO 3 d- P ELS 3 49 SEE CIVIL PLANS FOR q VERIFY P.O.C.,EQUIPMENT AND FEES WITH MLITY COMPANY AND OWNER BEFORE INSTALLATIONS OF NEW 3 Y= <br /> ABOVE E4 E4 Q OF C LUMN INSIDE Q Q No <br /> INFORMATION ❑ELECTRICAL SERVICE, Q <br /> COLLI N WRAP(TYP.) - - I L O g <br /> CONTRACTOR TO INSTALL(2)-5"UNDERGROUND PVC CONDUIT 5 MOUNT EBB ON SUPPORT BRACE SEE ARCHITECTURAL—ZING FOR DETAIL. F <br /> ad o <br /> • 4 q PHONE J P C OC ©MOUNT E.S.O.ON CONTROLLER ENCLOSURE EXTERIOR LOCATE PER ARCHITECTURAL DRAWING. FU QpA�GO <br /> • I F 911 5 (SCHEDULE 80)OR AS REQUIRED BY POWER COMPANY. N QT a <br /> _ 10 , • 4 J PROPOSED J VERIFY TRANSFORMER LOCATION,ELEVATION AND APPURTENANT WITH UTILITY COMPANY. U <br /> ^mO9 TRANSFORMER LOCATION ❑ <br /> A J9 (2)3"C.(4)#4/O THWN C.U. B ALL TANK FILL AND VAPOR RETURN RISERS SHALL BE GROUNDED TO PREVENT STATIC DISCHARGE.REFER To <br /> 5• I D X © T 17 98 85 1 ]9 98 85 198 85 J J & SON <br /> 1#2/0 GROUND(PARALLEL) ❑ALL <br /> B AND C ON SHEET E5. <br /> 10 10 10 10 ]fi EM RGENCY 145 D 400 AMP,3-PH,4W METER/Ci, <br /> 9❑SR JTI BO 01 Ea%6 OORABCVERE ELECTRICAL SUND FORMS FARINGENT AT SIR iOWAROs RIEFCOMROLLER ENCNS LL BE LOSUREEA.HOMERUNPUGGGN PCOFF WITH ND R#69 FROM <br /> O S SWITCH WITCHOFFNECi,AND MANUAL TRANSFER NTER ISLAND AND LOOP 3/4'RIGID METAL CONDUIT.ABOVE GRADE TO ADJACENT COLUMNS, <br /> ISCON14 9 AD <br /> 1ALL ELLCTRICAL JUNCTION-ES IN TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE EXPLOSION1 5 CONTROLLER 10 PROOF WITH SEAL-OFF ENTERING AND LIVING.SGL-OFFS TO BE A MINIMUM OF 6"MUST THE HIGHEST <br /> QOE2OENCLOSURE PENETRATON FOR TESTING PURPOSES.ALL CONDUIT RUN ENTERING OR LIVING A TANK SUMP SHALL BE ROBROY <br /> Ifi ®mO PVCCOATED RIGID METAL CONDUIT NO EXCEPTIONS. <br /> 11 2,OF ANYHORIZONTALUNDERRGROUNDAL IS CONERES OUND RUN TO THETION POINTOFF EMERGENCETTOUTHEAREAS <br /> ABOVE ONLY) <br /> G GROUND RACEWAYTITO BE <br /> T <br /> ROBROY PVC COATED RIGID METALLIC CONDUIT(NO EXCEPTIONS).THE RIGID NONMETALLICCONDUIT INCLUDING RIGID <br /> NONMETALLIC CONDUIT FITTINGS ARE REQUIRED i0 BE LEGATED NET LESS THAN 2'BELOW GRACE.PULL BER <br /> LOCATION PRE PREFERRED IN PUNTERS. <br /> I12 NOT USED. <br /> '98 8590 85 1]9 a 98 BS 9 ] 98 85 <br /> 10 w 31J 10 13 INSTALL 1J°x'Al°%24"PLASTIC IN-GROUND PULLED%BY G.C.FOR CAMERA FEEDS. <br /> xrc a ®ROUTE ALL CONDUITS AT COLUMNS SO RANT THEY ARE ON THE SAME SIDE AS THE ACCESS PANEL. „gTEs5lgy 6 <br /> w a N ¢ LL rc EE- z W LL 0 COGHSO CAMERA CONTRACTOR TO INSTALL WIRELESS CAMERA AT TANK PAD AREA LIGHT. COSTCO CAMERA <br /> CONTINCTOR r0 LINK CAMERA i0 WAREHOUSE.CAMERA SHALL BE SOLELY DIRECTED TO THE TANK FILLS. <br /> w 3 4a w? 3 <br /> INSTALL TWO(2)1°CONDUITS FOR SUBMERSIBLE NEL PUMP POWER AS FOLLOWS:TWO(2)AT TURBINE SUMP q4 <br /> 16 (PREMIUM). ALL TURBINE POWER TO BE ROBROY PVC COATED RIGID METALLIC CONDUIT(NO EXCEPTIONS).ALL <br /> SIL-OFFS AND ELECTRICAL BOXES TO BE SET 6'MIN.ABOVE SUMP PENETRATIONS. ✓`t•!M cAL1� � <br /> LK-T1 EE� EHOUSE EED�PT ROOM yy,q e <br /> JING GGJIGG <br /> Bul DING SERVICE DATA t <br /> NOT TO SCALE�� SERVICE VOLTAGE:3 PH 120/20BV,4W LOAD DATA: s <br /> METHANE NOTE: Electrical Site Plan Dpi CONNECTED 110.0 FAA,ESTIMATED DEMAND 112.8 KNA LEGEND d e a <br /> ALL UNDERGROUND CONDUITS SHALL HAVE --- SCALE 1 10'-0" *EDP CONDUIT INSTALLATION NOTES SERVICE CRALLEL) C UNDERGROUND COMMUNICATION CONDUIT 4#4/0 THWN&1#2/0 <br /> LL GND.(PA , <br /> SEAL-OFFS AT BOTH ENDS OF EMERGENCE. INSTACONDUITS AS FOLLOWS: 11 COSTCO 3 <br /> METERING:PER P UNDERGROUND ELECTRICAL SERVICE CONDUIT �F <br /> UTILITY TYPE: WHOLESALE 999 <br /> GILBARCO DISPENSER WIRE COLOR REFERENCE `°'811"� ❑(1)2'C(PVC),(1)25 PAIR'DUTDOOR RATED" u61DERca0u61D LAKE DRIVE T UNDERGROUND TELEPHONE CONDUIT ; <br /> PHONE WIRE,(1)#12 END.FOR TELEPHONE 1554pUAH,WA j CC <br /> 1. BEACH#12:HOT TO A-2(CD MODULE)&VARISTOR SERVICE FROM CONTROLLER ENCLOSURE TO BILLING 90021 ATTN: - UNDERGROUND CONDUIT <br /> INFORMATION: Ci f <br /> WAREHOUSE EDP(CONTINUOUS).FILL BY OWNER Deanna Hu hes J{XI <br /> 2 GREEN#12 TO A-10(GROUND) eer qO I.S.DEPT. ( ) CAUTION 9 ® INDICATES CONDUIT NUMBER <br /> 3. WHITE#12 NEUTRAL TO A-13(Co MODDLE)&VARISTOR POTENTIAL UTILITY CONFLICT.CONTRACTOR SHALL FIELD VERIFY ALL EXISTING SEE CONDUIT SCHEDULE,E2-2 _ <br /> FUEL POSITION NUMBERING O(1) 2"C(PVC),25#PULL CORD FROM AND NEW UTILITIES PRIOR TO CONSTRUCTION.SEE LEE—NOTE THE EXPLOSION PROOF SEAL-OFF Cp $ <br /> a. VARIES#12:r0(UNLEADED#1-REO);(UNLEADED#2-RED/VIHITE) CONTROLLER ENCLOSURE TO WAREHOUSE EDP EXISTING WATER,STORM,AND SANITARY SEWER SERVICE SHOWN IS W CE <br /> 5. BLUE#12:TO(PREMIUM) NOTE:FUELING POSITIONS AT THE (CONTINUOUS)FILL BY OWNER I.S.DEPT. APPROXIMATE,BASED ON FIELD SURVEYS AND '­BUILT'RECORDS.THE # INDICATES FUEL POSITION NUMBERING # EQUIPMENT NUMBER.RET-2 <br /> DISPENSERS ARE NUMBERED AS FOLLOWS: GENERAL CONTRACTOR SHALL"POTHOLE"THE EXISTING UTILITIES TO VERIFY THE O (f)EQUIPMENT <br /> _ C R C <br /> 6. YELLOW#12:TO(DIESEL) 3O(1)1°C(PVC),SPARE WITH PULL CORP TO DIAMETER AND LOCATION(INCL.ELEVATIONS)PRIOR TO CONSTRUCTION.ANY ..r'Ww �\ �• Q <br /> FUELING POSITION#1 IS ALWAYS THE WAREHOUSE EDP(CONTINUOUS) DISCREPANCIES IN THE LOCATION OF THE EXISTING PIPE OR INCOMPATIBILITY OF31 <br /> ]. YELLOW#14:SPARE NOTE: OUTBOARD SIDE OF THE FIRST DISPENSER THE DESIGN SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE OWNERS <br /> 6. PURPLE#14 SPARE ALL WIRE TO BE THWN. ON THE ENTRANCE SIDE AND NON O()OUTDOOR CRATED FIBER12 TOPTIIC CABLE TO CHET REPRESENTATIVE,AND BARGHAUSEN CONSULTING ENGINEERS(425-251-6222). <br /> OIL AND RESISTANT EXPANSION SIDE OF THE CANOPY. WgREHOUSE EDP (CONTINUOUS) b (� <br /> 9. PINK#14:SPARE NO EXCEPTIONS OPPOSITE SIDE SHALL BE FUELING POSITION FILL MLffY CONRJCT NOTE: <br /> BY OWNER I.S.DEPT. CC € <br /> 10.BROWN 14:SPARE #2 AS SHOWN. CAUTION: Y 2 <br /> # ®(1)1"C(PVC)FROM EDP TO WAREHOUSE THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE <br /> 11.#14:TO B-9(GRIND TWO WIRE CUT(-))CAi 5e CABLES PER E2-2 NOTE FUEL POSITION DECAL NUMBERS ARE ELECTRICAL ROOM#1(UNDER NEW WAREHOUSE LOCATION,DIMENSION,AND DEPTH OF ALL EXISTING UTILITIES DJE N UE° <br /> PROVIDED BY OWNER AND INSTALLED BY G.C.SCOPE,FILL BY OWNER I.S.DEPT.) WHETHER SHOWN ON THESE PLANS OR NOT BY POT HOLING THE S <br /> 12.#14:TO B-I(GRIND PRO WIRE IN(+))GATT 5e CABLES PER E2-2 START UP TECHNICIAN. UTILITIES AND BE <br /> RVEYING THE HORIZONTAL AND VERTICAL LOCATION c <br /> 13 4:TO A-9 PUMP 1W0 WIRE OUT CAT 5e CABLES PER E2-2 PRIOR TO CONSTRUCTION.THIS SHALL INCLUDE CALLING UTILITY k$§ <br /> #I ( (-)) (ALL CONDUIT AND PULL CORD BY G.C.,CONDUIT FILL AS LOCATE®1 (800)]82-5348 AND THEN POT HOLING ALL OF THE <br /> 14.#14:TO A-19(PUMP Iwo WIRE IN(+))CAT Se CABLES PER E2-2 SHEET INFORMATION NOTE NOTED.) EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO ' <br /> DISPENSER WIRING NOTE: BASE SHEET INFORMATION PROVIDED BY (NEW WAREHOUSE AND FUEL FACILITY-CONDUITS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST.LOCATIONS N ALA,_ % /Rrye-x N R <br /> JECT TO <br /> EXIT ROW OF DISPENSERS SHALL BE WIRED FOR TANK#1 AND TANK#3. <br /> EASE <br /> CONSULTING ENGINEERS,INC., WITHIN 5 FEET OF CONTROLLER ENCLOSURE PROVIDE OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON <br /> MIDDLE ROW OF DISPENSERS SHALL BE WIRED FOR TANK#2 AND TANK#3. a5 1 IT NAME?BARGHAUSEN FCONFSULTING 250PULE FEET EOR FORCONDUITS <br /> (2)190 DEGREEIRED BENDS R EVERY THE VARIATION.RIF ECONFLPUBLIC <br /> ICTS ISHORMDTION OCCURD HARE CONE RACTOR SHALL `p <br /> ENT RANCE ROW OF DISPENSERS SHALL BE WIRED FOR TANK#1,TANK#2 AND ENGINEERS ARE NOT RESPONSIBLE FOR CONSULT BARGHAUSEN CONSULTING ENGINEERS,INC.TO RESOLVE • O Mu <br /> TANK#3. (ALL CONDUITS TO BE ROUTED UNDER THE FREEZE LINE) ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. VICINITY MAP LOCATOR MAP Y <br /> THE HORIZONTAL CONTROL.SEE CIVIL AND <br />