Laserfiche WebLink
What time would you like to schedule the appointments? <br /> Thank you, <br /> Ge*v,eyi y Ma4efi*� I Sr. Office Assistant <br /> San Joaquin County Environmental Health Department <br /> 1868 E. Hazelton Ave. Stockton, CA 95205 <br /> n (209)468-02171g (209) 468-34331 El gmartinez@sigov.org <br /> EHD Website: https://www.sigov.org/department/envhealth/ <br /> From:Joseph Malcolm <imalcolm@ionescovey.com> <br /> Sent:Tuesday, August 16, 2022 6:40 PM <br /> To: EH-UST<ust@sigov.org> <br /> Cc:Austen Downey<adowney@ionescovey.com>;Jessica Brandi <jbrandi@ionescovey.com>;Tracy Mabe <br /> <tmabe@ionescovey.com>;Jason Hermosillo<iason@ionescovey.com> <br /> Subject: Costco Tracy- Inspection Request <br /> CAUTION:This email is originated from outside of the organization. Do not click links or open attachments unless you recognize the <br /> sender and know the content is safe. <br /> 3250 W Grant Line Rd <br /> Tracy, CA 95377 <br /> Please schedule an inspector on 8-30 and 8-31 for the following: <br /> • Verification of leak monitoring communication for all installed vacuum, pressure, or hydrostatic (VPH) <br /> components including piping, sumps, under dispenser containment sumps (UDCs), and all chase <br /> lines. Communication at end points of each vacuum zone and each vacuum monitored sump must be <br /> verified independently in operating condition. <br /> • Verification of the dispenser footprints contained by the UDCs. Any potential leaks from piping and fuel <br /> filters must drain directly into UDCs. <br /> • Verification of VPH components installation (shroud boots and band clamps for spill containers, <br /> appropriate rubber-type gasket or clamps on lids on all fill, vent and STP sumps, etc.). <br /> • Verification of overfill prevention: Measurement of drop tubes to verify 95% tank volume shut off and/or <br /> verification that external audible/visual alarm activates when tank is 90%full. <br /> • Spill bucket test: Verify minimum 5-gallon capacity and pass a one hour hydrostatic test(or equivalent). <br /> Proper drainage method must be verified. <br /> • Monitoring system functionality: Functionality of the monitoring system must be verified to ensure it <br /> meets the requirements of California Code of Regulations (CCR)Title 23 and California Health & Safety <br /> Code (HSC) Chapter 6.7. <br /> ELD will be completed (tentatively) on 8-25 and will be submitted for review as soon as reasonably possible. <br /> Dates may be merged depending on testing company. <br /> Respectfully, <br /> 'Aga a" <br /> Project Superintendent <br /> 909-276-0789 <br /> 2 <br />