Laserfiche WebLink
The following is the Overfill Prevention Device: <br /> SECONDARY'POSMVE' <br /> SHUTOFF LEVEt <br /> PER INSTRUCTIONS(95%) <br /> FLOW RATE AFTER <br /> 127 mm POSITIVE SHVTOFF <br /> (5 in) <4 LPM <br /> 143 mm n <br /> (5.6 in) !' <br /> -PRIMARY SHUTOFF <br /> ,WI, LEVEL for GAS <br /> PRIMARY SHUTOFF <br /> LEVEL for DIESEL <br /> FLOW RATE AFTER <br /> PRIMARY SHUTOFF <br /> <30 LPM <br /> Vanabfes Mat win Variables that will <br /> DECREASE Me Istel of IxrRFAS f ltie Icy&sd <br /> PRIMARY SHUTOFF dan PRIMARY SHUTOFF d an <br /> _2 <br /> 6_1 OPV: —h-imW OPV: <br /> -LOWER FLOWRATE -HIGHER FLOWRATE <br /> -HIGHER SPECIFIC GRAVITY -LOWER SPECIFIC GRAVITY <br /> SMALLER DIAMETER TANK -LARGER DIAMETER TAw <br /> INSTALLATION <br /> INSTALLING THE OPV <br /> A WARNING: If you are working with drop tubes that have been exposed to fuel or other <br /> flammable substances, allow these substances and any vapors to dissipate in a well-ventilated <br /> area for an hour before you perform any procedures. <br /> Required equipment: <br /> • Tape measure <br /> • Half round file <br /> • Permanent marker <br /> • FFS pipe cutter* or metal saw <br /> • Groove roller tool* <br /> • OPV assembly <br /> • 4" upper drop tube gasket <br /> • Hose clamp <br /> • Warning plate <br /> * Refer to the FFS catalog for ordering information. <br /> S <br />