My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
INSTALL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 9:33:30 AM
Creation date
5/31/2022 1:10:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2022
RECORD_ID
PR0518288
PE
2351
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROPOW <br /> NOTE: If you are installing an OPW®inlet tube, skip the following step. Follow steps 3 to 16 of the <br /> intrusions in the OPW®document 71SO Installation and Maintenance Instructions in VR-102-S <br /> for cutting the upper drop tube and installing the OPW® inlet tube. (Do not use the FFS drop tube <br /> gasket. Make sure you use the gasket included with the OPW®inlet tube.) Proceed to step 4 when <br /> the installation is complete. <br /> 3. Install the drop tube gasket on the upper drop tube (dual point installation as shown below). <br /> Drop tube gasket <br /> (note orientation) <br /> 4. Make sure the 0-rings are installed on the upper drop tube adapter. <br /> 5. Insert the upper drop tube adapter into the cut end of the upper drop tube. <br /> 6. Position the roller tool over the mark, and then tighten the roller tool until it makes contact <br /> with the upper drop tube. <br /> 7. Rotate the roller tool one full turn in one direction, and then rotate it one full turn in the <br /> opposite direction. <br /> 8. Tighten the roller tool approximately one tenth of a turn, and then repeat the previous step <br /> until the groove is complete. The tube is indented enough when the shoulder of the roller <br /> tool contacts the tube and creates a witness line or mark. <br /> Groove <br /> 4-• <br /> Witness lines or marks <br /> 9. Repeat the previous three steps to create a groove over the second mark. <br /> L% 10 <br /> - r- <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.