My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
INSTALL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 9:33:30 AM
Creation date
5/31/2022 1:10:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2022
RECORD_ID
PR0518288
PE
2351
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sly Q <br /> m m <br /> Wo 00 <br /> 0 0 SHEET INDEX W z `n <br /> GRANT LINE RD Z <br /> TANK SHEETS O Q Z <br /> PROJECT LOCATION T1-0 UNDERGROUND TANK AND PIPING SITE PLAN FOR EQUIPMENT DEMOLITION Q <br /> 205 T1-1 UNDERGROUND TANK AND PIPING SITE PLAN FOR SITE EXPANSION J <br /> W. 11TH ST T T ACY <br /> � " O <br /> T2-1 TANK AND PIPING MATERIAL LIST <br /> ` z 0 J <br /> T2-2 TANK AND PIPING MATERIAL LIST 0 <br /> T3-1 UNDERGROUND TANK DETAILS - FIBERGLASS TANK INSTALLATION DETAILS > WU <br /> o N N T3-2 TANK ANCHORING DETAILS W c Q <br /> J00T4-1 TANK TURBINE SUMPS AND INSTALLATION DETAILS ZLO <br /> U I / I T4-2 TANK TURBINE SUMPS + SIPHON DETAILS AND PIPING INSTALLATION DETAILS 0 J <br /> _ T5-1 EXISTING TANK FILL SUMPS AND PIPING INSTALLATION DETAILS Z W <br /> Q / T5-2 NEW TANK FILL SUMPS AND PIPING INSTALLATION DETAILS Q Q <br /> Of T T T5 -3 REMOTE FILL SUMPS AND PIPING INSTALLATION DETAILS Z z U Z <br /> U ^ OR T6-1 VENT AND MISC. INSTALLATION DETAILS W J <br /> U <br /> T6-2 ARID PERMEATOR INSTALLATION INSTALLATION DETAILS AND NOTES zo v <br /> NOT TO SCALE NOT TO SCALE T7-1 DISPENSER AND SUMP INSTALLATION DETAILS N z 0 <br /> i? 0 <br /> ELECTRICAL SHEETS o o ~ Z < Q <br /> VICINITY MAP LOCATOR MAP � Of 0 0 O <br /> EO-1 TITLE 24 COMPLIANCE FORMS EXTERIOR CANOPY LIGHTING z W <br /> EO-2 TITLE 24 COMPLIANCE FORMS CANOPY SIGN LIGHTING <br /> E1-0 ELECTRICAL SITE PLAN AND NOTES D 0 0 <br /> E1-1 HAZARDOUS AREA SITE PLAN AND NOTES <br /> E2-0 CONTROLLER ENCLOSURE FLOOR PLAN > a O N <br /> E2-1 CONTROLLER ENCLOSURE INTERIOR ELEVATIONS /R W CO <br /> \ E2-2 TURBINE, DISPENSER AND MONITORING SYSTEM ELECTRICAL DIAGRAM o 0 o Y 0 0 <br /> E2-3 HVAC UNIT FLOOR PLAN LAYOUT U <br /> \ E3 PANEL SCHEDULES AND SINGLE LINE DIAGRAM W U <br /> E4 CANOPY LIGHTING AND CAMERA PLAN m m m m 0 <br /> \ E5 VEEDER-ROOT CONSOLES AND DETAILS <br /> E6 POWERBOX DETAILS Z <br /> REMOVE TANK ANNULAR LID AND 3 C4 o c__4 <br /> o <br /> E7 SQUARE D IPaCS POWERBOX DETAILS ,) � � - <br /> E8 POWERBOX AND PLLD DETAILS <br /> SENSOR (TYP. OF TANKS 1-3) E9 UPS WIRING DETAILS o o �... <br /> E10 ADDITIVE WIRING DETAILS <br /> REMOVE ALL EXISTING FILL/SPILL LID ASSEMBLY 2 8 REMOVE EXISTING 4"OVER 3" DOUBLE E11 VEEDER ROOTS VACUUM SENSOR INSTALLATION DETAILS (1 of 2) <br /> AND EQUIPMENT WITHIN SUMP. EXISTING FILL SUMP \ WALL FIBERGLASS VENT PIPING E12 VEEDER ROOTS VACUUM SENSOR INSTALLATION DETAILS (2 of 2) <br /> TO REMAIN. (TYP. OF TANKS 1-3) � � <br /> \ \ 14 M VE EXISTING ELECTRICAL TRANSFORMER AND <br /> EXISTING DOUBLE WALL FIBERGLASS 1 \ A CIATED EQUIPMENT <br /> GASOLINE( TANK TO REMAIN \ \ GENERAL NOTES <br /> TYP. OF TANKS 1-3 \ \ 5 TRIM BACK AND REMOVE EXISTING SECTION OF <br /> \ FIBERGLASS ADDITIVE PRODUCT PIPING FROM <br /> REMOVE EXISTING SINGLE WALL TURBINE 4 \ POINT OF INTERCEPTION BACK TO EXISTING TANK PIPING LEGEND <br /> CONTAINMENT SUMP, SUMP COLLAR, \ \ FILL PS. CONTRACTOR TO FIELD VERIFY EXACT <br /> MANWAY PLATE, ACCESS LID AND ALL <br /> 0 \ OCA N OF INTERCEPTION POINT. EXISTING 3" OVER 2" DOUBLE WALL FIBERGLASS ADDITIVE PRODUCT PIPING <br /> \ <br /> EXISTING EQUIPMENT WITHIN THE SUMP EXISTING 3" OVER 2" DOUBLE WALL FIBERGLASS ADDITIVE VENT PIPING <br /> DOUBLE WALL FIBERGLASS ADDITIVE <br /> (TYP. OF TANKS 1-3) \ EXISTING SECTION OF OVER 2" - - EXISTING 2" FLEXIBLE DOUBLE WALL PRODUCT PIPING IN 4" GEODUCT TO BE REMOVED <br /> \ \ <br /> \ \ PRODUCT PIPING TO REMAIN EXISTING 2" INSIDE 3" F.G. DOUBLE WALL PRODUCT PIPING TO BE REMOVED <br /> 0 \ EXISTING 4" OVER 3" DOUBLE WALL FIBERGLASS VENT PIPING TO BE REMOVED <br /> EXISTING ° ° \ <br /> ° \ \ 1 EXISTING 1 ,500 GALLON EXISTING 4" OVER 3" OR 3" OVER 2" DOUBLE WALL FIBERGLASS VAPOR RECOVERY PIPING TO BE REMOVED <br /> TANK #3 \ FUEL-ADDITIVE <br /> (92 OCTANE) \ \ O UNDERGROUND STORAGE EXISTING 3" OVER 2" DOUBLE WALL FIBERGLASS VAPOR RETURN PIPING TO BE REMOVED <br /> 20,000 \ TANK TO REMAIN O INDICATES DISPENSER NUMBERING AND POSITION W <br /> GALLON \ \ # J <br /> cq1 <br /> EXISTING \ \ < W 0 <br /> TANK #2 °° \ \ EXISTING SECTION OF 3" OVER 2" > OD <br /> (87 OCTANE) \ \ - DOUBLE WALL FIBERGLASS VENT TANK AND PIPING DEMOLITION NOTES W Fr (3) <br /> 20,000 • PIPING TO REMAIN J D Q <br /> \ <br /> GALLON CDCD EXISTING THREE (3) 20,000 GALLON "CONTAINMENT SOLUTIONS" DOUBLE WALL FIBERGLASS TANKS WITH HYDROSTATIC ANNULAR SPACE MONITORED BY "VEEDER ROOT" TLS-350R 0 <br /> \ 5 BACK AND REMOVE EXISTING SECTION OF TANK AND PIPING MONITORING AND ALARM SYSTEM TO REMAIN, = W <br /> \ �\ ' • FIB GLASS ADDITIVE VENT PIPING FROM FROM <br /> OINT OF INTERCEPTION BACK TO EXISTING TANK EXISTING ONE (1) 1,500 GALLON"CONTAINMENT SOLUTIONS" DOUBLE WALL FIBERGLASS SPLIT TANK WITH HYDROSTATIC ANNULAR SPACE MONITORED BY "VEEDER ROOT" TLS-350R Q I <br /> REMOVE EXISTING 2" 7 \ FILL SUMPS. CONTRACTOR TO FIELD VERIFY EXACT TANK AND PIPING MONITORING AND ALARM SYSTEM TO REMAIN, CONTRACTOR TO REMOVE EXISTING FLOW METER FROM ADDITIVE SUMP. AC dill O J Q <br /> FLEXIBLE DOUBLE • LOCATION OF INTERCEPTION POINT. <br /> WALL ACTIVE SIPHON \ O CONTRACTOR TO EXCAVATE TO EXPOSE AND REMOVE ALL EXISTING GASOLINE TANK FILL/SPILL LID ASSEMBLY AND EQUIPMENT WITHIN SUMP. EXISTING GASOLINE TANK FILL SUMP TO U 0 0 <br /> INSIDE 4" GEODUCT 11 REMOVE E STING ADDITIVE TANK VENT REMAIN. REMOVED FILL SUMP EQUIPMENT TO BE TRANSPORTED AND DISPOSED OF AS PER LOCAL, STATE AND FEDERAL REQUIREMENTS. (TYP. OF ALL EXISTING 20,000 GALLON � Q <br /> \ • RISER NT SUMP, SUPPORT RACK, AND GASOLINE TANKS) <br /> REMOVE EXISTING 2" FLEXIBLE 7 A CIA CONCRETE BOLLARDS 0 CO <br /> DOUBLE WALL PRODUCT \ U • O3 CONTRACTOR TO EXCAVATE TO EXPOSE AND REMOVE EXISTING TANK ANNULAR ACCESS LID AND SINGLE FLOAT HYDROSTATIC SENSOR. REMOVED ANNULAR EQUIPMENT TO BE TRANSPORTED <br /> MANIFOLD INSIDE 4" GEODUCT 0 O REMOVE EXISTING GASOLINE TANK AND DISPOSED OF AS PER LOCAL, STATE AND FEDERAL REQUIREMENTS. (TYP. OF ALL EXISTING 20,000 GALLON GASOLINE TANKS) V <br /> EXISTING \ VENT RISER, SUPPORT RACK, AND U ® CONTRACTOR TO EXCAVATE TO EXPOSE AND REMOVE EXISTING SINGLE WALL TURBINE CONTAINMENT SUMP, SUMP COLLAR, MANWAY PLATE, ACCESS LID AND ALL EXISTING EQUIPMENT WITHIN <br /> TANK #1 \ • ASSOCIATED CONCRETE BOLLARDS THE SUMP. REMOVED SUMP EQUIPMENT TO BE TRANSPORTED AND DISPOSED OF AS PER LOCAL, STATE AND FEDERAL REQUIREMENTS. (TYP. OF ALL EXISTING 20,000 GALLON GASOLINE TANKS) <br /> (87 OCTANE) <br /> 20,000 • 12 REMO EXIS G CONTRACTOR TO EXCAVATE TO EXPOSE TO TRIM BACK AND REMOVE EXISTING SECTION OF FIBERGLASS ADDITIVE PRODUCT AND VENT PIPING FROM POINT OF INTERCEPTION BACK <br /> GALLON \ TRO ENCLOSURE TO EXISTING TANK 1-3 FILL SUMPS AND ADDITIVE VENT SUMP. CONTRACTOR TO FIELD VERIFY EXACT LOCATION OF INTERCEPTION POINT. REMOVED PIPING TO BE TRANSPORTED <br /> \ AND DISPOSED OF AS PER LOCAL, STATE AND FEDERAL REQUIREMENTS. PERFORM SOIL SAMPLING UNDER ALL REMOVED PIPING AS PER LOCAL AGENCY REQUIREMENTS. O <br /> REMOVE EXISTING 2" FLEXIBLE 15 • <br /> DOUBLE WALL PRODUCT © CONTRACTOR TO EXCAVATE TO EXPOSE AND REMOVE ALL EXISTING 3" INSIDE 4" AND 2" INSIDE 3" STAGE II VAPOR RECOVERY PIPING. REMOVED PIPING TO BE TRANSPORTED AND ILL <br /> PIPING IN 4" GEODUCT \ • DISPOSED OF AS PER LOCAL, STATE AND FEDERAL REQUIREMENTS. PERFORM SOIL SAMPLING UNDER ALL REMOVED PIPING AS PER LOCAL AGENCY REQUIREMENTS. <br /> • <br /> REMOVE EXISTING 2" FLEXIBLE 7 70 CONTRACTOR TO EXCAVATE TO EXPOSE AND REMOVE ALL EXISTING 2" COAXIAL PIPING AND ASSOCIATED 4" GEODUCT. REMOVED PIPING AND DUCTING TO BE TRANSPORTED AND DISPOSED <br /> DOUBLE WALL PRODUCT \ • • 9 OV ISTING HEALY AIR OF AS PER LOCAL, STATE AND FEDERAL REQUIREMENTS. PERFORM SOIL SAMPLING UNDER ALL REMOVED PIPING AS PER LOCAL AGENCY REQUIREMENTS. <br /> PIPING IN 4 GEODUCT • SE ATOR, ASSOCIATED PIPING, <br /> \ • ONCRETE SLAB AND BOLLARDS ® CONTRACTOR TO EXCAVATE TO EXPOSE AND REMOVE ALL EXISTING 4" OVER 3" DOUBLE WALL FIBERGLASS GASOLINE TANK VENT PIPING FOR TANKS 1-3. REMOVED PIPING TO BE <br /> \ TRANSPORTED AND DISPOSED OF AS PER LOCAL, STATE AND FEDERAL REQUIREMENTS. PERFORM SOIL SAMPLING UNDER ALL REMOVED PIPING AS PER LOCAL AGENCY REQUIREMENTS. <br /> REMOVE EXISTING 3" DOUBLE WALL 6 <br /> FIBERGLASS VAPOR RECOVERY PIPING \ CONTRACTOR TO EXCAVATE TO EXPOSE AND REMOVE EXISTING SECTION OF 3" OVER 2" DOUBLE WALL FIBERGLASS ADDITIVE TANK VENT PIPING FOR TANK 4. REMOVED PIPING TO BE <br /> REMOVE EXISTING 2" FLEXIBLE 7 <br /> TRANSPORTED AND DISPOSED OF AS PER LOCAL, STATE AND FEDERAL REQUIREMENTS. PERFORM SOIL SAMPLING UNDER ALL REMOVED PIPING AS PER LOCAL AGENCY REQUIREMENTS. <br /> \ <br /> DOUBLE WALL PRODUCT 0 CONTRACTOR TO EXCAVATE TO EXPOSE AND REMOVE EXISTING HEALY AIR SEPARATOR, ASSOCIATED PIPING, CONCRETE SLAB AND CONCRETE BOLLARDS. HEALY AIR SEPARATOR AND <br /> PIPING IN 4" GEODUCT / \ ASSOCIATED EQIPMENT TO BE TRANSPORTED AND DISPOSED OF AS PER LOCAL, STATE AND FEDERAL REQUIREMENTS. PERFORM SOIL SAMPLING UNDER ALL REMOVED PIPING AS PER <br /> / LOCAL AGENCY REQUIREMENTS. A As-Built <br /> \ 10 REMOVE EXISTING GASOLINE & ADDITIVE TANK VENT RISERS' SUPPORT RACK, AND ASSOCIATED ABOVE GROUND PIPING. CONTRACTOR TO EXCAVATE TO EXPOSE AND REMOVE CD 09/01/2022 <br /> EXISTING 3'> <br /> lOHE5[OYE7 GROUP,IFLEX AND BOOT AT BASE OF EXISTING GASOLINE TANK VENT RISER. REMOVED PIPING AND EQUIPMENT TO BE TRANSPORTED AND DISPOSED OF AS PER LOCAL, STATE H[, 7:35:23 AM <br /> REMOVE EXISTING 2" DOUBLE WALL 6 2 \ AND FEDERAL REQUIREMENTS. PERFORM SOIL SAMPLING UNDER ALL REMOVED PIPING AS PER LOCAL AGENCY REQUIREMENTS. <br /> FIBERGLASS VAPOR RECOVERY PIPING � \ RpfESSIpH <br /> 11 CONTRACTOR TO REMOVE EXISTING DISPENSER AND HANGING HARDWARE. PROTECT AND SAVE FOR REINSTALLATION. (TYP. OF ALL EXISTING DISPENSERS) <br /> REMOVE EXISTING 2" FLEXIBLE 7 <br /> DOUBLE WALL PRODUCT O CONTRACTOR TO EXCAVATE TO EXPOSE AND REMOVE EXISTING UNDER DISPENSER SUMP. REMOVED SUMPS TO BE TRANSPORTED AND DISPOSED OF AS PER LOCAL, STATE AND FEDERAL �= HAL P. GRUBB <br /> PIPING IN 4" GEODUCT \ REQUIREMENTS. PERFORM SOIL SAMPLING UNDER ALL REMOVED PIPING AS PER LOCAL AGENCY REQUIREMENTS. <br /> 67814 70 <br /> CONTRACTOR TO TRIM AND REMOVE EXISTING PARTIAL ISLAND FORM. REMOVED ISLAND FORM SECTION TO BE TRANSPORTED AND DISPOSED OF AS PER LOCAL, STATE AND FEDERAL <br /> / O 36 <br /> 5 \ REQUIREMENTS. THE PARTIAL ISLAND FORM AROUND THE CANOPY COLUMN TO REMAIN. (TYP. OF ALL EXISTING ISLANDS)4 T <br /> 12 CONTRACTOR TO REMOVE EXISTING CONTROLLER ENCLOSURE AND ASSOCIATED EQUIPMENT. REMOVED CONTROLLER ENCLOSURE EQUIPMENT AND BUILDING MATERIALS TO BE <br /> TRANSPORTED AND DISPOSED OF AS PER LOCAL, STATE AND FEDERAL REQUIREMENTS. 9TE` I V I �FO� <br /> / 13 CONTRACTOR TO REMOVE EXISTING EMERGENCY PUMP SHUTOFF SWITCH. SAVE FOR REINSTALLATION. <br /> OP CAL 05/27/22 <br /> O \ 14 CONTRACTOR TO REMOVE EXISTING ELECTRICAL TRANSFORMER AND ASSOCIATED EQUIPMENT. REMOVED TRANSFORMER AND ASSOCIATED EQUIPMENT TO BE TRANSPORTED AND DISPOSED OF <br /> � lor- / AS PER LOCAL, STATE AND FEDERAL REQUIREMENTS. <br /> Q <br /> c 0 Q <br /> / \ _ _ _ 15 CONTRACTOR TO REMOVE EXISTING CONCRETE TANK SLAB AS REQUIRED. REMOVED CONCRETE TO BE TRANSPORTED AND DISPOSED OF AS PER LOCAL, STATE AND FEDERAL v> z z <br /> 9 $ OO / REQUIREMENTS. <br /> 10 X <br /> > > N N <br /> EXISTING CANOPY OVERHEAD TO REMAIN /� <br /> o m o 7 o <br /> m <br /> O o0 <br /> 0 <br /> 3 a <br /> aNi t a o <br /> EXISTING CANOPY COLUMN AND a co <br /> co <br /> SURROUNDING ISLAND FORM TO O 11 / o <br /> REMAIN. (TYP. OF 6) 12 / <br /> 12 REMOVE EXISTING DISPENSER AND HANGING V C <br /> HARDWARE, UNDER DISPENSER SUMP AND C V <br /> ISLAND FORM. PROTECT AND SAVE FOR EXISTING - C <br /> REMOVE EXISTING 13 DISPENSERS AND HANGING HARDWARE FOR <br /> EMERGENCY PUMP SHUTOFF REINSTALLATION. (TYP. OF ALL EXISTING / i U) o <br /> SWITCH. PROTECT AND DISPNSERS) / 3 N <br /> SAVE FOR REINSTALLATION. \ // / / m o <br /> 0 I <br /> LU E <br /> J .� a � N <br /> N � c r- cL <br /> V 0 <br /> m t <br /> r o <br /> 0 <br /> c <br /> 0 <br /> c <br /> 0 <br /> a <br /> UNDERGROUND TANK AND PIPING SITE PLAN w <br /> 4 <br /> C) <br /> FOR EQUIPMENT DEMOLITION <br /> U <br /> N <br /> E <br /> Call Toll Free Ln <br /> 1 (800) 642-2444CD CD <br /> 0 10 20 40TWO L0 <br /> 0 co <br /> WORKING DAYS z 0 CD <br /> o <br /> BEFORE YOU O N <br /> 1� = 10' DIG � T <br />
The URL can be used to link to this page
Your browser does not support the video tag.