AREA LIGHT BY OTHERS. GENERAL NOTES
<br /> POWERED AND CONTROLLED
<br /> BY THE FUELING FACILITY 1 . SEE MATERIALS LIST (T2-2) FOR DESCRIPTION ON EQUIPMENT USED IN
<br /> THIS CONSTRUCTION. (n 00
<br /> LO
<br /> 2. ROUTING SHOWN ARE SCHEMATIC FINAL LOCATIONS SHALL BE SHOWN ON W
<br /> AS-BUILT DRAWINGS. O
<br /> 3. ALL EQUIPMENT SHALL BE INSTALLED AS PER MANUFACTURER'S OR OWNERS Z
<br /> GUIDELINES WHICHEVER IS MORE STRINGENT.
<br /> LIGHT POLE SUPPLIED --X, Z J
<br /> AND DESIGNED BY4. FUNCTIONS OF THE CONTINUOUS MONITORING: Q W CO3V
<br /> OTHERS -MONITORING OF ALL ANNULAR SPACES. Z Z
<br /> -MONITORING OF ALL PRODUCT PIPING AND FILL SUMPS. Q J 0)
<br /> j -PROVIDE .1 GPH PRESSURE LINE LEAK DETECTION (PLLD) OF PRODUCT LINES. J Q W
<br /> -PROVIDE CONTINUOUS TANK LEVEL MONITORING. Z U Z_
<br /> i
<br /> -MONITORING OF ALL DISPENSER SUMPS. z W Q J
<br /> j THE CONTINUOUS MONITORING DEVICE SHALL PROVIDE POSITIVE SHUTDOWN OF TURBINES Q
<br /> CAMERA SPECIFIED AND AND DISPENSERS AUTOMATICALLY IN THE EVENT OF A LIQUID RELEASE AND MANUALLY CA
<br /> INSTALLED BY COSTCO THROUGH THE ESO SWITCH LOCATED ON THE CONTROLLER ENCLOSURE AND REMOTE ESOo o Q Q
<br /> SWITCH AS INDICATED ON SITE PLAN. Q
<br /> 5. ALL WIRES ENTERING CONTROL PANELS, MAIN PANELS, AND SUB PANELS SHALL BE CD CD
<br /> U O
<br /> 21 AREA LIGHT AND MARKED WITH PHASE TAPE > Q N
<br /> CODING AS FOLLOWS: (n
<br /> REMOTE FILL CAMERA POWER „ „ > > > 0
<br /> % 41 MONITORING A- 13 AND A-36 A PHASE = BLACK 0 0 0 0 W O
<br /> "B" PHASE = RED W V
<br /> UNLEADED FILL 45 CAMERA 0 TO AREA #12 GROUND WIRE TO JUNCTION "C" PHASE = BLUE m m
<br /> TURBINE REGULAR COMMUNICATION LIGHT
<br /> POWER 10 1 8B DP-2,4,6 ® 38 TANK & INLINE FUSES TO FIXTURES 6. ALL CONDUCTORS SHALL BE CONTINUOUS (WITH NO SPLICES) STRANDED COPPER WITH ,
<br /> M NITORIN 2 75°C THWN INSULATION, OIL AND GAS RESISTANT. o
<br /> TURBINE 10 1 8A DP-8,10,12 HAND HOLE/ COVER o o 41
<br /> POWER 15 CAMEf�
<br /> --- SEAL-OFF, 7. A SEAL OFF MUST BE INSTALLED PRIOR TO ENTERING AND LEAVING A
<br /> 3'-6" TYP. CLASSIFIED AREA. CONDUITS FIRST EMERGENCE FROM BELOW GRADE MUST BE
<br /> TANK RISER GROUNDING 8 UNLEADED FILL CONNECTED TO A SEAL-OFF.
<br /> (TYP. ALL TANKS) TURBINE POWER 10 1 7B o o REGULAR o a 37 T NK 11 VENT SUMP MONITORING CONCRETE BASE III 8. ALL CONDUITS SHALL HAVE INSULATED GROUNDING BUSHINGS INSTALLED AND TIED TOGETHER W/ #6 BARE COPPER
<br /> BY OTHERS
<br /> DP-13,15,17 M NITORIN 54 SOLENOID CONTROL WIRING a WIRE. BOND ALL INSULATED GROUNDING BUSHINGS AND GUTTER BOX BACK TO POWER CENTER GROUND. DO NOT
<br /> TURBINE DP-19,21,23 ° PENETRATE INTRINSICALLY SAFE BARRIERS.
<br /> POWER 10 1 7A 53 FLOW METER HEAVY DUTY CONCRETE FINISH GRADE 9. ALL INSTALLATIONS SHALL BE PER N.E.C., ARTICLE 514.
<br /> VENT STACK ACCESS BOX 10. ALL EQUIPMENT SHALL BE U.L. APPROVED.
<br /> G
<br /> FILL 14 SPARE � i � � �
<br /> 0 UNLEADED I 11 . ALL EQUIPMENT REQUIRING ADA HEIGHTS ARE TO BE TAKEN FROM A LEVEL FLAT SURFACE. VERIFY IN FIELD.
<br /> TURBINE 10 1 6B REGULAR T NK g0 59 COMMUNICATIONS %"0 & 10' COPPERWELD II 36" MIN.
<br /> TURBINE TANK 5 POWER ° ° DP-7,9,11 36 M NITORIN 58 POWER GROUND ROD 0 12. ALL ELECTRICAL WORK SHALL BE DESIGNED/INSTALLED 2020 CALIFORNIA
<br /> POWER 10 16 0 - DP-14,16,18 UNLEADED TANK 40 \- TURBINE 10 1 6A DP-1 ,3,5 R,
<br /> DP-20,22,24 MONITORING �- POWER 9 10 ELECTRICAL CONDUIT FOR ELECTRICAL CODE, AND 2017 NATIONAL ELECTRICAL
<br /> TURBINE 10 16 TURBINES PREMIUM DP-26,28 GROUNDING CONDUCTOR 45 21 FOR AREA LIGHT
<br /> POWER 0 RID PROCESSOR j AND CAMERA POWER
<br /> 0 DP-25,27,29 TANK o 5 TANK ALUMINUM TUBE a KEY NOTES
<br /> MONITORING EMBEDDED IN CONCRETE TO CAMERA FOR
<br /> BASE COMMUNICATION DISCONNECT AND REMOVE EXISTING 2 HP FE PETRO VARIABLE SPEED TURBINE. REPLACE
<br /> 20 0 14 8 11 VENT SUMP MONITORING ❑ _
<br /> • � 19 : ,- : � K - � VENT WITH TWO (2) NEW FE PETRO VARIABLE SPEED 2 HP TURBINES. RE USE EXISTING CONDUITS W N
<br /> I 13 m 1 I STACK OVERFILL ALARM _ AND ROUTE TO NEW CONTROLLER ENCLOSURE. PULL ALL NEW WIRING PER PLANS. J N
<br /> m m 2 mO 3 150 - 2'-0" DIA. Q O
<br /> O I & ACK SW. 2 EXISTING DVR IS INSTALLED IN THE EXISTING EDP ROOM, FIELD VERIFY LOCATION WITH CONSTRUCTION PM W 00
<br /> 1 9 12 � 47 179 1 9 12G 47 179 1D 9D 12D � 1 9 12 26 � 47 179 SEE CONDUITS ('2`� ❑ W � �
<br /> INSTALLATION Tank Pad Area Light OR MULVINNYG2 PM. J
<br /> 98 85 98 85 98 85 25 29 47 98 85 175 I - 3 REMOTE ALARMS ON THE EXTERIOR OF THE CONTROLLER ENCLOSURE SHALL BE AUDIBLE AND VISUAL. VEEDER-ROOT Q
<br /> 10 10 10 CD m CD � 10 NOTES -- ❑ TLS 350R IS MOUNTED ON THE INTERIOR. VERIFY LOCATIONS WITH CONSTRUCTION PM OR MULVANNYG2 PM.
<br /> Z w z z 179 176 I � W
<br /> RUN CONDUIT UP EXTERIO w o w >- � SEE CIVIL PLANS FOR VERIFY P.O.C., EQUIPMENT AND FEES WITH UTILITY COMPANY AND OWNER BEFORE INSTALLATIONS OF NEW _
<br /> OF COLUMN INSIDE 0 � m D < o = 0 I T ROUTING INFORMATION ELECTRICAL SERVICE. Q Q
<br /> COLUMN WRAP (TYP.) z Q J J D
<br /> Lj w z I C 5 MOUNT E.S.O ON SUPPORT BRACE SEE ARCHITECTURAL DRAWING FOR DETAIL. V �
<br /> m m CONTRACTOR TO INSTALL (2)-5 UNDERGROUND PVC CONDUIT ❑ O
<br /> • I 0 (SCHEDULE 80) OR AS REQUIRED BY POWER COMPANY. 6 MOUNT E.S.O. ON CONTROLLER ENCLOSURE EXTERIOR LOCATE PER ARCHITECTURAL DRAWING. Q
<br /> P 0
<br /> 22 I 16 _ 15 10 I� _ 4 VEEDER ROOT 3 149 - PROPOSED V
<br /> 4 7 ❑ VERIFY TRANSFORMER LOCATION, ELEVATION AND APPURTENANT WITH UTILITY COMPANY.
<br /> • m 21 ' r ! m m 9 - L 3 PAINELS TRANSFORMER LOCATION
<br /> O O -
<br /> 30 1 9 12 47 179 1 9 12 1 9 12 47D 179 1 9 126 27 (2) 3" C, (4) #4/0 THWN C.U. ALL TANK FILL AND VAPOR RETURN RISERS SHALL BE GROUNDED TO PREVENT STATIC DISCHARGE. REFER TO
<br /> 0 47 179 47 179
<br /> 98 85 175 & 1 #2/0 GROUND (PARALLEL) DETAILS B AND C ON SHEET E5.
<br /> 5 98 85 98 85 98 85 EMERGENCY JUNCTION BOXES FOR FUTURE ELECTRICAL EQUIPMENT AT EXIT SIDE COLUMNS SHALL BE EXPLOSION PROOF WITH SEAL-OFF.
<br /> 145 I 10 10 10 10 176 QCALL BOX 158 I p 400 AMP, 3-PH, 4W METER/CT, a SET J-BOXES 2'-0" ABOVE ISLAND FORMS FACING TOWARDS THE CONTROLLER ENCLOSURE. HOMERUN CONDUIT #69 FROM i
<br /> O 56 DISCONNECT, AND MANUAL TRANSFER 0
<br /> v � v >- i E3 CENTER ISLAND AND LOOP 3/4 RIGID METAL CONDUIT, ABOVE GRADE TO ADJACENT COLUMNS.
<br /> m � EMrRGENCY 145 SWITCH LL
<br /> 14 9 14 9 14 9 0 = 9 14
<br /> z o I z CD SHUT-OFF 10 ALL ELECTRICAL JUNCTION BOXES IN TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE EXPLOSION
<br /> LLJ
<br /> -- Q J (^ SWITCH I 1 152 CONTROLLER PROOF WITH SEAL-OFF ENTERING AND LEAVING. SEAL-OFFS TO BE A MINIMUM OF 6" ABOVE THE HIGHEST
<br /> 0 EZ-p ENCLOSURE
<br /> m I PENETRATION FOR TESTING PURPOSES. ALL CONDUIT RUN ENTERING OR LEAVING A TANK SUMP SHALL BE ROBROY
<br /> � � 24 N 23 18 rn 17 12 11 6 ,�
<br /> PVC COATED RIGID METAL CONDUIT NO EXCEPTIONS.
<br /> w I I r-, c� r-, 5
<br /> • m I L m L � L_J 11 ALL NONMETALLIC CONDUITS (UNDERGROUND APPLICATION AND NON-HAZARDOUS AREAS ONLY) SHALL HAVE THE LAST
<br /> _____ _______ ____ _______ ________________________________ _______ _____ _______ __ _____ ___________________________ _____ ______ ________ ___ _________- _____ 2 OF ANY HORIZONTAL UNDERGROUND RUN TO THE POINT OF EMERGENCE TO THE ABOVE GROUND RACEWAY TO BE
<br /> T � t t � t
<br /> ROBROY PVC COATED RIGID METALLIC CONDUIT (NO EXCEPTIONS). THE RIGID NONMETALLIC CONDUIT INCLUDING RIGID
<br /> NONMETALLIC CONDUIT FITTINGS ARE REQUIRED TO BE LOCATED NOT LESS THAN 2' BELOW GRADE. PULL BOX
<br /> LOCATION ARE PREFERRED IN PLANTERS.
<br /> 1 9 12 7 9039 12J 4719 12 69 28 1 9 12C 47 ; _--______-- NOT USED. As-Built
<br /> 09/01/2022
<br /> 98 85 179 98 85 179 0- 98 85 9 1750- 98 85 179 1OHE5COVEYGRO1IP,Imc 7:36:49 AM
<br /> 13 INSTALL 17"x30"X24" PLASTIC IN-GROUND PULLBOX BY G.C. FOR CAMERA FEEDS.
<br /> 10 m m 10 m •J 10 z J 176 10
<br /> Lijw I Rill ESSIOHq!
<br /> w .� w .� w m Ld Q �w a- .� 14 ROUTE ALL CONDUITS AT COLUMNS SO THAT THEY ARE ON THE SAME SIDE AS THE ACCESS PANEL. ��� Fti6,
<br /> Un LLJcn I LLJcn � z 011 cn 2 1 ! �= HAL P. GRUBB ?�
<br /> = 0 w w = m w = m � o Cn Q �= 0' w CANOPY 15 COSTCO CAMERA CONTRACTOR TO INSTALL CAMERA AT TANK PAD AREA LIGHT. COSTCO CAMERA CONTRACTOR TO -
<br /> o m w w o m L� o m m Ut o � 0 m w E4 E4 ABOVE - J 67814 70
<br /> w w w w w w _J 0 w w Lu
<br /> CONNECT CAMERA TO WAREHOUSE. CAMERA SHALL BE SOLELY DIRECTED TO THE TANK FILLS.
<br /> z Q Q z 3 Q z � Q00 zQ /
<br /> cn 0 w � V w cwi) � 0 Q U w 16 INSTALL TWO (2) 1" CONDUITS FOR SUBMERSIBLE FUEL PUMP POWER AS FOLLOWS: TWO (2) AT TURBINE SUMP #4 �, Q
<br /> 12 � � � � � (PREMIUM). ALL TURBINE POWER TO BE ROBROY PVC COATED RIGID METALLIC CONDUIT (NO EXCEPTIONS). ALL �9T c v
<br /> m Q Q m Q m w D' Q
<br /> � w � Ld w U) LL1w w x 0 w 0 SEAL-OFFS AND ELECTRICAL BOXES TO BE SET 6" MIN. ABOVE SUMP PENETRATIONS. F of CA,
<br /> z � z U) z � J 0 z U) 05/27/22
<br /> w z w z w z w m o w z
<br /> w w w w w
<br /> U)
<br /> U o U o � o cn 2 AT WAREHOUSE EDP ROOM
<br /> 0 U
<br /> J Al EXISTING COSTCO N = Z > Z
<br /> BUILDING L
<br /> SERVICE DATA X
<br /> � � C7 N �
<br /> O 0 O L N 0
<br /> m m
<br /> NOT TO SCALE SERVICE VOLTAGE: 3 PH 120/208V, 4W LOAD DATA: Y o
<br /> METHANE NOTE: 1 Electrical Site Plan T CONNECTED 93.4 KVA, ESTIMATED DEMAND 95.2 KVA LEGEND ii-3 U a
<br /> =x SERVICE CONDUCTORS 4#4/0 THWN & 1 #2/0 � � Q
<br /> ALL UNDERGROUND CONDUITS SHALL HAVE --- SCALE 1 "= 10'-0" - EDP CONDUIT INSTALLATION NOTES GND.(PARALLEL)Q C UNDERGROUND COMMUNICATION CONDUIT
<br /> SEAL-OFFS AT BOTH ENDS OF EMERGENCE. INSTALL CONDUITS AS FOLLOWS: ❑ Q)
<br /> 11 METERING: PER WHOLE P UNDERGROUND ELECTRICAL SERVICE CONDUIT CV E `�
<br /> Call Toll Free >> UTILITY TYPE: WHOLESALE 999 0
<br /> GILBARCO DISPENSER WIRE COLOR REFERENCE O1 (1 ) 2 C (PVC), (1 ) 25 PAIR OUTDOOR RATED LAKE DRIVE T UNDERGROUND TELEPHONE CONDUIT - v
<br /> 811 PHONE WIRE, (1 ) #12 GND. FOR TELEPHONE UNDERGROUND ISSAQUAH, WA •
<br /> 1 . BLACK 12: HOT TO A-2 CD MODULE & VARISTOR Two BILLING _ N
<br /> ( ) WORKING DAYS SERVICE FROM CONTROLLER ENCLOSURE TO 98027 ATTN: UNDERGROUND CONDUIT U1
<br /> BEFORE YOU INFORMATION
<br /> 2. GREEN #12: TO A-10 (GROUND) DIG WAREHOUSE EDP (CONTINUOUS). FILL BY OWNER Deanna Hughes m
<br /> I.S. DEPT. CAUTION ® INDICATES CONDUIT NUMBER •� :3 cll
<br /> O c
<br /> 3. WHITE #12: NEUTRAL TO A-13 (CD MODULE) & VARISTOR POTENTIAL UTILITY CONFLICT. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING SEE CONDUIT SCHEDULE, E2-2 U0 & N
<br /> FUEL POSITION NUMBERING 0 (1 ) 2" C (PVC), 25# PULL CORD FROM AND NEW UTILITIES PRIOR TO CONSTRUCTION. SEE UTILITY CONFLICT NOTE THE - EXPLOSION PROOF SEAL-OFF C a)
<br /> 4. VARIES #12: TO (UNLEADED #1 -RED); (UNLEADED #2-RED/WHITE) CONTROLLER ENCLOSURE TO WAREHOUSE EDP EXISTING WATER STORM AND SANITARY SEWER SERVICE SHOWN IS Ll
<br /> NOTE: FUELING POSITIONS AT THE C N
<br /> (CONTINUOUS) FILL BY OWNER I.S. DEPT. APPROXIMATE BASED ON FIELD SURVEYS AND "AS-BUILT" RECORDS. THE # INDICATES FUEL POSITION NUMBERING # EQUIPMENT NUMBER. REF. T2-2 r�
<br /> 5. BLUE #12: TO (PREMIUM) DISPENSERS ARE NUMBERED AS FOLLOWS: > O
<br /> GENERAL CONTRACTOR SHALL "POTHOLE" THE EXISTING UTILITIES TO VERIFY THE .0 Q 00 N o
<br /> 6. YELLOW #12: TO (DIESEL) FUELING POSITION #1 IS ALWAYS THE 3 (1 ) 1 C (PVC SPARE WITH PULL CORD TO DIAMETER AND LOCATION (INCL. ELEVATIONS) PRIOR TO CONSTRUCTION. ANY _- � G m , : rn N
<br /> WAREHOUSE' EDP CONTINUOUS ' j ��\ Q
<br /> OUTBOARD SIDE OF THE FIRST DISPENSER (CONTINUOUS) DISCREPANCIES IN THE LOCATION OF THE EXISTING PIPE OR INCOMPATIBILITY OF Z �� %BGG �p t � � r CD
<br /> 7. YELLOW #14: SPARE THE DESIGN SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE OWNERS e� D Vf
<br /> NOTE: ON THE ENTRANCE SIDE AND NON 4 1 1 " C PVC 1 12 STRAND 5MM K JACKET �o m r I v � G % i }' fV w
<br /> 8. PURPLE #14 SPARE ALL WIRE TO BE THWN, EXPANSION SIDE OF THE CANOPY. 0 ( ) ( )' ( ) REPRESENTATIVE, AND BARGHAUSEN CONSULTING ENGINEERS (425-251 -6222). ti�,o ��� - "� �� m 0 N N
<br /> OUTDOOR RATED FIBER OPTIC CABLE TO
<br /> OIL AND RESISTANT OPPOSITE SIDE SHALL BE FUELING POSITION WAREHOUSE EDP (CONTINUOUS) FILL UTILITY CONFLICT NOTE �° w �� `aG�GG ;\� m V 00 Y �tCD
<br /> 9. PINK 14: SPARE 0 0 ' i
<br /> # NO EXCEPTIONS #2 AS SHOWN.
<br /> BY OWNER I.S. DEPT. �� � y o
<br /> # CAUTION: a, , , - �,.
<br /> 10. BROWN 14: SPARE GRANT LINE RD c• ��� �� � • ,
<br /> NOTE FUEL POSITION DECAL NUMBERS ARE 35 (1 ) 1 C (PVC) FROM EDP TO WAREHOUSE THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE �� �' �
<br /> PROJECT LOCATION G X
<br /> PROVIDED BY OWNER AND INSTALLED BY ELECTRICAL ROOM #1 (UNDER NEW WAREHOUSE �� `� �� `°\ w
<br /> 11 . #14: TO B-9 (GRIND TWO WIRE OUT (-)) CAT 5e CABLES PER E2-2 LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES
<br /> START UP TECHNICIAN. G.C. SCOPE, FILL BY OWNER I.S. DEPT.) WHETHER SHOWN ON THESE PLANS OR NOT BY POT HOLING THE 205 W. 11TH sT T T ACY -y ;;, 0
<br /> 12. #14: TO B-19 (CRIND TWO WIRE IN (+)) CAT 5e CABLES PER E2-2 UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION ��GGdis
<br /> 13. #14: TO A-9 (PUMP TWO WIRE OUT (-)) CAT 5e CABLES PER E2-2 SHEET INFORMATION NOTE (ALL CONDUIT AND PULL CORD BY G.C., CONDUIT FILL AS PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY o �G/ "✓�� U
<br /> LOCATE @ 1 (800) 782-5348 AND THEN POT HOLING ALL OF THE J ,ice
<br /> 14. #14: TO A-19 (PUMP TWO WIRE IN (+)) CAT 5e CABLES PER E2-2 BASE SHEET INFORMATION PROVIDED BY NOTED.) EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO OQ GGG ^ i
<br /> iii 0
<br /> DISPENSER WIRING NOTE: BARGHAUSEN CONSULTING ENGINEERS, INC., (NEW WAREHOUSE AND FUEL FACILITY - CONDUITS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS N �i�� N o
<br /> DATED WITHIN 5 FEET OF CONTROLLER ENCLOSURE. PROVIDE "��
<br /> EXIT ROW OF DISPENSERS SHALL BE WIRED FOR TANK#1 AND TANK #3. FILE NAME z10050s.dwg, OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON � � �-� -- ��� � � o
<br /> MIDDLE ROW OF DISPENSERS SHALL BE WIRED FOR TANK#2 AND TANK #3. 05. 13.2021 . BARGHAUSEN CONSULTING PULL BOXES FOR CONDUITS AS REQUIRED FOR EVERY THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO 0 LO 0 0
<br /> ENGINEERS ARE NOT RESPONSIBLE FOR 250 FEET OR AFTER (2) 90 DEGREE BENDS VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL Z TCD
<br /> ENTRANCE ROW OF DISPENSERS SHALL BE WIRED FOR TANK#1 ,TANK#2 AND THE HORIZONTAL CONTROL. SEE CIVIL AND CD
<br /> CONSULT BARGHAUSEN CONSULTING ENGINEERS, INC. TO RESOLVE o O N W
<br /> TANK #3. (ALL CONDUITS TO BE ROUTED UNDER THE FREEZE LINE) ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. VICINITY MAP LOCATOR MAP
<br /> ARCHITECTURAL SHEETS. NOT TO SCALE NOT TO SCALE
<br />
|