AREA LIGHT BY OTHERS. GENERAL NOTES <br /> POWERED AND CONTROLLED <br /> BY THE FUELING FACILITY 1 . SEE MATERIALS LIST (T2-2) FOR DESCRIPTION ON EQUIPMENT USED IN <br /> THIS CONSTRUCTION. (n 00 <br /> LO <br /> 2. ROUTING SHOWN ARE SCHEMATIC FINAL LOCATIONS SHALL BE SHOWN ON W <br /> AS-BUILT DRAWINGS. O <br /> 3. ALL EQUIPMENT SHALL BE INSTALLED AS PER MANUFACTURER'S OR OWNERS Z <br /> GUIDELINES WHICHEVER IS MORE STRINGENT. <br /> LIGHT POLE SUPPLIED --X, Z J <br /> AND DESIGNED BY4. FUNCTIONS OF THE CONTINUOUS MONITORING: Q W CO3V <br /> OTHERS -MONITORING OF ALL ANNULAR SPACES. Z Z <br /> -MONITORING OF ALL PRODUCT PIPING AND FILL SUMPS. Q J 0) <br /> j -PROVIDE .1 GPH PRESSURE LINE LEAK DETECTION (PLLD) OF PRODUCT LINES. J Q W <br /> -PROVIDE CONTINUOUS TANK LEVEL MONITORING. Z U Z_ <br /> i <br /> -MONITORING OF ALL DISPENSER SUMPS. z W Q J <br /> j THE CONTINUOUS MONITORING DEVICE SHALL PROVIDE POSITIVE SHUTDOWN OF TURBINES Q <br /> CAMERA SPECIFIED AND AND DISPENSERS AUTOMATICALLY IN THE EVENT OF A LIQUID RELEASE AND MANUALLY CA <br /> INSTALLED BY COSTCO THROUGH THE ESO SWITCH LOCATED ON THE CONTROLLER ENCLOSURE AND REMOTE ESOo o Q Q <br /> SWITCH AS INDICATED ON SITE PLAN. Q <br /> 5. ALL WIRES ENTERING CONTROL PANELS, MAIN PANELS, AND SUB PANELS SHALL BE CD CD <br /> U O <br /> 21 AREA LIGHT AND MARKED WITH PHASE TAPE > Q N <br /> CODING AS FOLLOWS: (n <br /> REMOTE FILL CAMERA POWER „ „ > > > 0 <br /> % 41 MONITORING A- 13 AND A-36 A PHASE = BLACK 0 0 0 0 W O <br /> "B" PHASE = RED W V <br /> UNLEADED FILL 45 CAMERA 0 TO AREA #12 GROUND WIRE TO JUNCTION "C" PHASE = BLUE m m <br /> TURBINE REGULAR COMMUNICATION LIGHT <br /> POWER 10 1 8B DP-2,4,6 ® 38 TANK & INLINE FUSES TO FIXTURES 6. ALL CONDUCTORS SHALL BE CONTINUOUS (WITH NO SPLICES) STRANDED COPPER WITH , <br /> M NITORIN 2 75°C THWN INSULATION, OIL AND GAS RESISTANT. o <br /> TURBINE 10 1 8A DP-8,10,12 HAND HOLE/ COVER o o 41 <br /> POWER 15 CAMEf� <br /> --- SEAL-OFF, 7. A SEAL OFF MUST BE INSTALLED PRIOR TO ENTERING AND LEAVING A <br /> 3'-6" TYP. CLASSIFIED AREA. CONDUITS FIRST EMERGENCE FROM BELOW GRADE MUST BE <br /> TANK RISER GROUNDING 8 UNLEADED FILL CONNECTED TO A SEAL-OFF. <br /> (TYP. ALL TANKS) TURBINE POWER 10 1 7B o o REGULAR o a 37 T NK 11 VENT SUMP MONITORING CONCRETE BASE III 8. ALL CONDUITS SHALL HAVE INSULATED GROUNDING BUSHINGS INSTALLED AND TIED TOGETHER W/ #6 BARE COPPER <br /> BY OTHERS <br /> DP-13,15,17 M NITORIN 54 SOLENOID CONTROL WIRING a WIRE. BOND ALL INSULATED GROUNDING BUSHINGS AND GUTTER BOX BACK TO POWER CENTER GROUND. DO NOT <br /> TURBINE DP-19,21,23 ° PENETRATE INTRINSICALLY SAFE BARRIERS. <br /> POWER 10 1 7A 53 FLOW METER HEAVY DUTY CONCRETE FINISH GRADE 9. ALL INSTALLATIONS SHALL BE PER N.E.C., ARTICLE 514. <br /> VENT STACK ACCESS BOX 10. ALL EQUIPMENT SHALL BE U.L. APPROVED. <br /> G <br /> FILL 14 SPARE � i � � � <br /> 0 UNLEADED I 11 . ALL EQUIPMENT REQUIRING ADA HEIGHTS ARE TO BE TAKEN FROM A LEVEL FLAT SURFACE. VERIFY IN FIELD. <br /> TURBINE 10 1 6B REGULAR T NK g0 59 COMMUNICATIONS %"0 & 10' COPPERWELD II 36" MIN. <br /> TURBINE TANK 5 POWER ° ° DP-7,9,11 36 M NITORIN 58 POWER GROUND ROD 0 12. ALL ELECTRICAL WORK SHALL BE DESIGNED/INSTALLED 2020 CALIFORNIA <br /> POWER 10 16 0 - DP-14,16,18 UNLEADED TANK 40 \- TURBINE 10 1 6A DP-1 ,3,5 R, <br /> DP-20,22,24 MONITORING �- POWER 9 10 ELECTRICAL CONDUIT FOR ELECTRICAL CODE, AND 2017 NATIONAL ELECTRICAL <br /> TURBINE 10 16 TURBINES PREMIUM DP-26,28 GROUNDING CONDUCTOR 45 21 FOR AREA LIGHT <br /> POWER 0 RID PROCESSOR j AND CAMERA POWER <br /> 0 DP-25,27,29 TANK o 5 TANK ALUMINUM TUBE a KEY NOTES <br /> MONITORING EMBEDDED IN CONCRETE TO CAMERA FOR <br /> BASE COMMUNICATION DISCONNECT AND REMOVE EXISTING 2 HP FE PETRO VARIABLE SPEED TURBINE. REPLACE <br /> 20 0 14 8 11 VENT SUMP MONITORING ❑ _ <br /> • � 19 : ,- : � K - � VENT WITH TWO (2) NEW FE PETRO VARIABLE SPEED 2 HP TURBINES. RE USE EXISTING CONDUITS W N <br /> I 13 m 1 I STACK OVERFILL ALARM _ AND ROUTE TO NEW CONTROLLER ENCLOSURE. PULL ALL NEW WIRING PER PLANS. J N <br /> m m 2 mO 3 150 - 2'-0" DIA. Q O <br /> O I & ACK SW. 2 EXISTING DVR IS INSTALLED IN THE EXISTING EDP ROOM, FIELD VERIFY LOCATION WITH CONSTRUCTION PM W 00 <br /> 1 9 12 � 47 179 1 9 12G 47 179 1D 9D 12D � 1 9 12 26 � 47 179 SEE CONDUITS ('2`� ❑ W � � <br /> INSTALLATION Tank Pad Area Light OR MULVINNYG2 PM. J <br /> 98 85 98 85 98 85 25 29 47 98 85 175 I - 3 REMOTE ALARMS ON THE EXTERIOR OF THE CONTROLLER ENCLOSURE SHALL BE AUDIBLE AND VISUAL. VEEDER-ROOT Q <br /> 10 10 10 CD m CD � 10 NOTES -- ❑ TLS 350R IS MOUNTED ON THE INTERIOR. VERIFY LOCATIONS WITH CONSTRUCTION PM OR MULVANNYG2 PM. <br /> Z w z z 179 176 I � W <br /> RUN CONDUIT UP EXTERIO w o w >- � SEE CIVIL PLANS FOR VERIFY P.O.C., EQUIPMENT AND FEES WITH UTILITY COMPANY AND OWNER BEFORE INSTALLATIONS OF NEW _ <br /> OF COLUMN INSIDE 0 � m D < o = 0 I T ROUTING INFORMATION ELECTRICAL SERVICE. Q Q <br /> COLUMN WRAP (TYP.) z Q J J D <br /> Lj w z I C 5 MOUNT E.S.O ON SUPPORT BRACE SEE ARCHITECTURAL DRAWING FOR DETAIL. V � <br /> m m CONTRACTOR TO INSTALL (2)-5 UNDERGROUND PVC CONDUIT ❑ O <br /> • I 0 (SCHEDULE 80) OR AS REQUIRED BY POWER COMPANY. 6 MOUNT E.S.O. ON CONTROLLER ENCLOSURE EXTERIOR LOCATE PER ARCHITECTURAL DRAWING. Q <br /> P 0 <br /> 22 I 16 _ 15 10 I� _ 4 VEEDER ROOT 3 149 - PROPOSED V <br /> 4 7 ❑ VERIFY TRANSFORMER LOCATION, ELEVATION AND APPURTENANT WITH UTILITY COMPANY. <br /> • m 21 ' r ! m m 9 - L 3 PAINELS TRANSFORMER LOCATION <br /> O O - <br /> 30 1 9 12 47 179 1 9 12 1 9 12 47D 179 1 9 126 27 (2) 3" C, (4) #4/0 THWN C.U. ALL TANK FILL AND VAPOR RETURN RISERS SHALL BE GROUNDED TO PREVENT STATIC DISCHARGE. REFER TO <br /> 0 47 179 47 179 <br /> 98 85 175 & 1 #2/0 GROUND (PARALLEL) DETAILS B AND C ON SHEET E5. <br /> 5 98 85 98 85 98 85 EMERGENCY JUNCTION BOXES FOR FUTURE ELECTRICAL EQUIPMENT AT EXIT SIDE COLUMNS SHALL BE EXPLOSION PROOF WITH SEAL-OFF. <br /> 145 I 10 10 10 10 176 QCALL BOX 158 I p 400 AMP, 3-PH, 4W METER/CT, a SET J-BOXES 2'-0" ABOVE ISLAND FORMS FACING TOWARDS THE CONTROLLER ENCLOSURE. HOMERUN CONDUIT #69 FROM i <br /> O 56 DISCONNECT, AND MANUAL TRANSFER 0 <br /> v � v >- i E3 CENTER ISLAND AND LOOP 3/4 RIGID METAL CONDUIT, ABOVE GRADE TO ADJACENT COLUMNS. <br /> m � EMrRGENCY 145 SWITCH LL <br /> 14 9 14 9 14 9 0 = 9 14 <br /> z o I z CD SHUT-OFF 10 ALL ELECTRICAL JUNCTION BOXES IN TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE EXPLOSION <br /> LLJ <br /> -- Q J (^ SWITCH I 1 152 CONTROLLER PROOF WITH SEAL-OFF ENTERING AND LEAVING. SEAL-OFFS TO BE A MINIMUM OF 6" ABOVE THE HIGHEST <br /> 0 EZ-p ENCLOSURE <br /> m I PENETRATION FOR TESTING PURPOSES. ALL CONDUIT RUN ENTERING OR LEAVING A TANK SUMP SHALL BE ROBROY <br /> � � 24 N 23 18 rn 17 12 11 6 ,� <br /> PVC COATED RIGID METAL CONDUIT NO EXCEPTIONS. <br /> w I I r-, c� r-, 5 <br /> • m I L m L � L_J 11 ALL NONMETALLIC CONDUITS (UNDERGROUND APPLICATION AND NON-HAZARDOUS AREAS ONLY) SHALL HAVE THE LAST <br /> _____ _______ ____ _______ ________________________________ _______ _____ _______ __ _____ ___________________________ _____ ______ ________ ___ _________- _____ 2 OF ANY HORIZONTAL UNDERGROUND RUN TO THE POINT OF EMERGENCE TO THE ABOVE GROUND RACEWAY TO BE <br /> T � t t � t <br /> ROBROY PVC COATED RIGID METALLIC CONDUIT (NO EXCEPTIONS). THE RIGID NONMETALLIC CONDUIT INCLUDING RIGID <br /> NONMETALLIC CONDUIT FITTINGS ARE REQUIRED TO BE LOCATED NOT LESS THAN 2' BELOW GRADE. PULL BOX <br /> LOCATION ARE PREFERRED IN PLANTERS. <br /> 1 9 12 7 9039 12J 4719 12 69 28 1 9 12C 47 ; _--______-- NOT USED. As-Built <br /> 09/01/2022 <br /> 98 85 179 98 85 179 0- 98 85 9 1750- 98 85 179 1OHE5COVEYGRO1IP,Imc 7:36:49 AM <br /> 13 INSTALL 17"x30"X24" PLASTIC IN-GROUND PULLBOX BY G.C. FOR CAMERA FEEDS. <br /> 10 m m 10 m •J 10 z J 176 10 <br /> Lijw I Rill ESSIOHq! <br /> w .� w .� w m Ld Q �w a- .� 14 ROUTE ALL CONDUITS AT COLUMNS SO THAT THEY ARE ON THE SAME SIDE AS THE ACCESS PANEL. ��� Fti6, <br /> Un LLJcn I LLJcn � z 011 cn 2 1 ! �= HAL P. GRUBB ?� <br /> = 0 w w = m w = m � o Cn Q �= 0' w CANOPY 15 COSTCO CAMERA CONTRACTOR TO INSTALL CAMERA AT TANK PAD AREA LIGHT. COSTCO CAMERA CONTRACTOR TO - <br /> o m w w o m L� o m m Ut o � 0 m w E4 E4 ABOVE - J 67814 70 <br /> w w w w w w _J 0 w w Lu <br /> CONNECT CAMERA TO WAREHOUSE. CAMERA SHALL BE SOLELY DIRECTED TO THE TANK FILLS. <br /> z Q Q z 3 Q z � Q00 zQ / <br /> cn 0 w � V w cwi) � 0 Q U w 16 INSTALL TWO (2) 1" CONDUITS FOR SUBMERSIBLE FUEL PUMP POWER AS FOLLOWS: TWO (2) AT TURBINE SUMP #4 �, Q <br /> 12 � � � � � (PREMIUM). ALL TURBINE POWER TO BE ROBROY PVC COATED RIGID METALLIC CONDUIT (NO EXCEPTIONS). ALL �9T c v <br /> m Q Q m Q m w D' Q <br /> � w � Ld w U) LL1w w x 0 w 0 SEAL-OFFS AND ELECTRICAL BOXES TO BE SET 6" MIN. ABOVE SUMP PENETRATIONS. F of CA, <br /> z � z U) z � J 0 z U) 05/27/22 <br /> w z w z w z w m o w z <br /> w w w w w <br /> U) <br /> U o U o � o cn 2 AT WAREHOUSE EDP ROOM <br /> 0 U <br /> J Al EXISTING COSTCO N = Z > Z <br /> BUILDING L <br /> SERVICE DATA X <br /> � � C7 N � <br /> O 0 O L N 0 <br /> m m <br /> NOT TO SCALE SERVICE VOLTAGE: 3 PH 120/208V, 4W LOAD DATA: Y o <br /> METHANE NOTE: 1 Electrical Site Plan T CONNECTED 93.4 KVA, ESTIMATED DEMAND 95.2 KVA LEGEND ii-3 U a <br /> =x SERVICE CONDUCTORS 4#4/0 THWN & 1 #2/0 � � Q <br /> ALL UNDERGROUND CONDUITS SHALL HAVE --- SCALE 1 "= 10'-0" - EDP CONDUIT INSTALLATION NOTES GND.(PARALLEL)Q C UNDERGROUND COMMUNICATION CONDUIT <br /> SEAL-OFFS AT BOTH ENDS OF EMERGENCE. INSTALL CONDUITS AS FOLLOWS: ❑ Q) <br /> 11 METERING: PER WHOLE P UNDERGROUND ELECTRICAL SERVICE CONDUIT CV E `� <br /> Call Toll Free >> UTILITY TYPE: WHOLESALE 999 0 <br /> GILBARCO DISPENSER WIRE COLOR REFERENCE O1 (1 ) 2 C (PVC), (1 ) 25 PAIR OUTDOOR RATED LAKE DRIVE T UNDERGROUND TELEPHONE CONDUIT - v <br /> 811 PHONE WIRE, (1 ) #12 GND. FOR TELEPHONE UNDERGROUND ISSAQUAH, WA • <br /> 1 . BLACK 12: HOT TO A-2 CD MODULE & VARISTOR Two BILLING _ N <br /> ( ) WORKING DAYS SERVICE FROM CONTROLLER ENCLOSURE TO 98027 ATTN: UNDERGROUND CONDUIT U1 <br /> BEFORE YOU INFORMATION <br /> 2. GREEN #12: TO A-10 (GROUND) DIG WAREHOUSE EDP (CONTINUOUS). FILL BY OWNER Deanna Hughes m <br /> I.S. DEPT. CAUTION ® INDICATES CONDUIT NUMBER •� :3 cll <br /> O c <br /> 3. WHITE #12: NEUTRAL TO A-13 (CD MODULE) & VARISTOR POTENTIAL UTILITY CONFLICT. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING SEE CONDUIT SCHEDULE, E2-2 U0 & N <br /> FUEL POSITION NUMBERING 0 (1 ) 2" C (PVC), 25# PULL CORD FROM AND NEW UTILITIES PRIOR TO CONSTRUCTION. SEE UTILITY CONFLICT NOTE THE - EXPLOSION PROOF SEAL-OFF C a) <br /> 4. VARIES #12: TO (UNLEADED #1 -RED); (UNLEADED #2-RED/WHITE) CONTROLLER ENCLOSURE TO WAREHOUSE EDP EXISTING WATER STORM AND SANITARY SEWER SERVICE SHOWN IS Ll <br /> NOTE: FUELING POSITIONS AT THE C N <br /> (CONTINUOUS) FILL BY OWNER I.S. DEPT. APPROXIMATE BASED ON FIELD SURVEYS AND "AS-BUILT" RECORDS. THE # INDICATES FUEL POSITION NUMBERING # EQUIPMENT NUMBER. REF. T2-2 r� <br /> 5. BLUE #12: TO (PREMIUM) DISPENSERS ARE NUMBERED AS FOLLOWS: > O <br /> GENERAL CONTRACTOR SHALL "POTHOLE" THE EXISTING UTILITIES TO VERIFY THE .0 Q 00 N o <br /> 6. YELLOW #12: TO (DIESEL) FUELING POSITION #1 IS ALWAYS THE 3 (1 ) 1 C (PVC SPARE WITH PULL CORD TO DIAMETER AND LOCATION (INCL. ELEVATIONS) PRIOR TO CONSTRUCTION. ANY _- � G m , : rn N <br /> WAREHOUSE' EDP CONTINUOUS ' j ��\ Q <br /> OUTBOARD SIDE OF THE FIRST DISPENSER (CONTINUOUS) DISCREPANCIES IN THE LOCATION OF THE EXISTING PIPE OR INCOMPATIBILITY OF Z �� %BGG �p t � � r CD <br /> 7. YELLOW #14: SPARE THE DESIGN SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE OWNERS e� D Vf <br /> NOTE: ON THE ENTRANCE SIDE AND NON 4 1 1 " C PVC 1 12 STRAND 5MM K JACKET �o m r I v � G % i }' fV w <br /> 8. PURPLE #14 SPARE ALL WIRE TO BE THWN, EXPANSION SIDE OF THE CANOPY. 0 ( ) ( )' ( ) REPRESENTATIVE, AND BARGHAUSEN CONSULTING ENGINEERS (425-251 -6222). ti�,o ��� - "� �� m 0 N N <br /> OUTDOOR RATED FIBER OPTIC CABLE TO <br /> OIL AND RESISTANT OPPOSITE SIDE SHALL BE FUELING POSITION WAREHOUSE EDP (CONTINUOUS) FILL UTILITY CONFLICT NOTE �° w �� `aG�GG ;\� m V 00 Y �tCD <br /> 9. PINK 14: SPARE 0 0 ' i <br /> # NO EXCEPTIONS #2 AS SHOWN. <br /> BY OWNER I.S. DEPT. �� � y o <br /> # CAUTION: a, , , - �,. <br /> 10. BROWN 14: SPARE GRANT LINE RD c• ��� �� � • , <br /> NOTE FUEL POSITION DECAL NUMBERS ARE 35 (1 ) 1 C (PVC) FROM EDP TO WAREHOUSE THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE �� �' � <br /> PROJECT LOCATION G X <br /> PROVIDED BY OWNER AND INSTALLED BY ELECTRICAL ROOM #1 (UNDER NEW WAREHOUSE �� `� �� `°\ w <br /> 11 . #14: TO B-9 (GRIND TWO WIRE OUT (-)) CAT 5e CABLES PER E2-2 LOCATION, DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES <br /> START UP TECHNICIAN. G.C. SCOPE, FILL BY OWNER I.S. DEPT.) WHETHER SHOWN ON THESE PLANS OR NOT BY POT HOLING THE 205 W. 11TH sT T T ACY -y ;;, 0 <br /> 12. #14: TO B-19 (CRIND TWO WIRE IN (+)) CAT 5e CABLES PER E2-2 UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION ��GGdis <br /> 13. #14: TO A-9 (PUMP TWO WIRE OUT (-)) CAT 5e CABLES PER E2-2 SHEET INFORMATION NOTE (ALL CONDUIT AND PULL CORD BY G.C., CONDUIT FILL AS PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY o �G/ "✓�� U <br /> LOCATE @ 1 (800) 782-5348 AND THEN POT HOLING ALL OF THE J ,ice <br /> 14. #14: TO A-19 (PUMP TWO WIRE IN (+)) CAT 5e CABLES PER E2-2 BASE SHEET INFORMATION PROVIDED BY NOTED.) EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO OQ GGG ^ i <br /> iii 0 <br /> DISPENSER WIRING NOTE: BARGHAUSEN CONSULTING ENGINEERS, INC., (NEW WAREHOUSE AND FUEL FACILITY - CONDUITS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS N �i�� N o <br /> DATED WITHIN 5 FEET OF CONTROLLER ENCLOSURE. PROVIDE "�� <br /> EXIT ROW OF DISPENSERS SHALL BE WIRED FOR TANK#1 AND TANK #3. FILE NAME z10050s.dwg, OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON � � �-� -- ��� � � o <br /> MIDDLE ROW OF DISPENSERS SHALL BE WIRED FOR TANK#2 AND TANK #3. 05. 13.2021 . BARGHAUSEN CONSULTING PULL BOXES FOR CONDUITS AS REQUIRED FOR EVERY THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO 0 LO 0 0 <br /> ENGINEERS ARE NOT RESPONSIBLE FOR 250 FEET OR AFTER (2) 90 DEGREE BENDS VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL Z TCD <br /> ENTRANCE ROW OF DISPENSERS SHALL BE WIRED FOR TANK#1 ,TANK#2 AND THE HORIZONTAL CONTROL. SEE CIVIL AND CD <br /> CONSULT BARGHAUSEN CONSULTING ENGINEERS, INC. TO RESOLVE o O N W <br /> TANK #3. (ALL CONDUITS TO BE ROUTED UNDER THE FREEZE LINE) ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. VICINITY MAP LOCATOR MAP <br /> ARCHITECTURAL SHEETS. NOT TO SCALE NOT TO SCALE <br />