My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
INSTALL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 9:33:30 AM
Creation date
5/31/2022 1:10:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2022
RECORD_ID
PR0518288
PE
2351
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Interstitial Liquid Sensor Installation Guide Sensor Description <br /> 7. Using wire nuts, connect the two-wire sensor cable to the field wires in the sensor junction box (Figure 2). Seal <br /> wire nuts with epoxy sealant following the instructions in Figure 3. <br /> + Red <br /> To From <br /> TLS Seal-off <br /> Console — Black Sensor <br /> • <br /> \1/2" rigid <br /> conduit <br /> isstwir.eps Epoxy sealed connections in a <br /> weatherproof junction box <br /> Figure 2. Sensor Field Wiring Diagram <br /> A ( C From probe, <br /> sensor,or <br /> transducer To console <br /> Make sure that <br /> the ends of cable <br /> sheathing are sub- <br /> / merged in sealant Tie wrap <br /> 1 Wire nuts <br /> Instructions: <br /> NOTE: When temperature is below 50°F (10°C), keep 4. Mix thoroughly to a uniform color by squeezing <br /> resin in a warm place prior to mixing (e.g., in an contents back and forth 25-30 times. <br /> inside pocket next to body). 5. Squeeze mixed, warm resin into one end of bag and <br /> 1.Open epoxy sealant package,and remove resin pak. cutoff other end. <br /> 6. Slowly insert wiring connections into sealing pack <br /> 2. Holding resin pak as shown in A,bend pak along long until they fit snugly against the opposite end as <br /> length. shown in C. <br /> 3. As shown in B, firmly squeeze the RED SIDE of the 7.Twist open end of bag and use tie wrap to close it off <br /> resin, forcing it through the center seal and into and position the tie wrapped end up until the resin <br /> BLACK SIDE. jells. <br /> CAUTION:Epoxy sealant is irritating to eyes,respiratory system, <br /> O4) O and skin.Can cause allergic skin reaction.Contains:epoxy resin <br /> and Cycloaliphatic epoxycarboxylate. <br /> Precautions:Wear suitable protective clothing,gloves,eye,and <br /> face protection.Use only in well ventilated areas.Wash <br /> thoroughly before eating,drinking,or smoking. conso1es\epxy2w.eps <br /> Figure 3. Epoxy sealing example <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.