Laserfiche WebLink
R' <br /> Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-01-84 <br /> 5. The Traffic Impact Mitigation Fee may be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $184.54 per <br /> additional daily trip-end generated in theTracy area. The fee shall be automatically adjusted <br /> July 1 of each year by the Engineering Construction Cost Index as published by the <br /> Engineering News Record. A credit may be allowed if it can be verified that the existing <br /> development on this site was in operation on or after April 23, 1990.) <br /> (Resolutions 00-433) <br /> 7. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> GK:BN: <br />