Laserfiche WebLink
Technologies, Inc., in 2004 and submitted with the Tentative Maps: <br /> a. Neighborhood 1 Phase /Environmental Site Assessment Report and Partial Response <br /> to Mountain House Master Plan Chapter Six, Mountain House, San Joaquin County, <br /> California;Limited Phase 11 Environmental Site Assessment Report, Proposed <br /> Neighborhood 1 Site; <br /> b. Neighborhood J Phase I Environmental Site Assessment Report and Partial Response <br /> to Mountain House Master Plan Chapter Six, Mountain House, San Joaquin County, <br /> California;Limited Phase 11 Environmental Site Assessment Report, Proposed <br /> Neighborhood J Site. <br /> Timing: Inclusion of a note on Improvement Plans approved by CDD and MHCSD prior to <br /> approval of Final Maps. <br /> 30. Pre-Construction Safeguards. Prior to any construction, appropriate plans, operating <br /> procedures and safeguards shall be undertaken to insure safety in the area of fuel lines <br /> and pipelines, consistent with the MHCSD Emergency Preparedness Plan (see <br /> Emergency Pipelines Safety Plan). [SPIT Implementation Measure 6.8.1 (1)] <br /> 31. Weber-Herdlyn Line Relocation. The 60 kV Weber-Herdlyn line shall either be <br /> abandoned, or relocated to an alignment that runs between the Byron Road and Union <br /> Pacific Railroad line rights-of-way. The line may be relocated in phases. <br /> Timing: The line shall be relocated when proposed residential development encroaches <br /> within 50 feet. [SPII, Implementation Measure 6.9 (5)] <br /> 32. Pipeline Relocation. Relocation of the PG&E gas distribution pipeline which runs from <br /> Arnaudo Boulevard north through Neighborhoods H, I and J shall be relocated. <br /> Timing: Relocation shall be conducted in accordance with the PG&E/MHCSD Pipeline <br /> Relocation Plan and in accordance with the provisions of the MHCSD/PG&E <br /> Encroachment Permit. [SP II Implementation Measure 8.3 (5)] <br /> 8 <br />