MOUNTAIN HOUSE MASTERPLAN AND SPECIFIC PLAN I <br /> SAN JOAQUIN COUNTY MITIGATION MONITORING PROGRAM <br /> �FRW7 <br /> BEIM I <br /> Many of thfhitigafion measures from the Final Environmental Impact Report have been incorporated Into the Master Plan,Master Plan Appendices,Specific Plan 1,and Public Financing Plan. <br /> Some mitigation measures have been included as Amendments to the San Joaquin County General Plan and/or the Mountain House Development Title. Compliance with these mitigation <br /> measures will occur as a function of the implementation of these various plans. <br /> WATER SUPPLY <br /> M4.4.1-1 a)If potential or proposed restrictions on diversion would cause the confirmed water Review of SJCDPW SID <br /> Inadequate raw water storage facilities may supply to be insufficient to serve the project as proposed In the Master Plan,then Subsequent <br /> result in Interruption of water service, the specific plans shall Identify additional water conservation/reuse measures to be Specific Plans. <br /> especially if restrictions on water diversion Incorporated Into the project to ensure that the demand would not exceed the <br /> were imposed by State or Federal agencies.. confirmed supply. <br /> M4.4.1-5 a)Industrial reuse of water treatment sludge shall be practiced to the maximum Plan review. MHCSD,SJCDPW DP for water <br /> Water treatment sludge disposal could extent possible.The Community Service District shall consider other disposal treatment plant <br /> adversely impact local water quality or options only If Industrial reuse were Infeasible. <br /> unnecessarily occupy scarce landfill space. <br /> M4.4.1-6 a)Chemical Selection and Facilities.Prior to the plants,chemicals associated with Review MHCSD,SJCDPW DPs for water and <br /> An uncontrolled release of hazardous water and wastewater treatment operations shall be carefully selected to minimize Plan/Engineers waste-water <br /> materials associated with water treatment the hazard.Chemical handling and storage facilities shall be designed to minimize Report treatment plants <br /> practices could potentially occur and Impact and effectively mitigate the potential for accidental releases,Including such features <br /> water resources and public health. as secondary containment,alarms,remote sensing Instruments,and other safety <br /> features. I I <br /> WASTEWATER <br /> M4.4.2-1 a)Additional wastewater treatment processes shall be provided if unrestricted use Plan review. SJCDPW SP <br /> Inadequately treated reclaimed wastewater reclamation,including Irrigation on-site,industrial/commercial reuse,or surface <br /> could impact local surface and groundwaters water discharge were implemented. <br /> and public health. Insufficient reclamation <br /> sites could result In illegal and inappropriate <br /> discharge of treated wastewater. <br /> b)The permit application for the wastewater treatment plant shall include a Review SJCDPW DP for treatment <br /> schedule for design,construction,and permitting for the plant to ensure that the Development plant <br /> wastewater treatment and reclamation facilities would be operational prior to the Permit application. <br /> approval of the first final subdivision map. <br /> c)Each Development Permit for the wastewater treatment plant shall describe the Review SJCDPW DID for treatment <br /> mechanism by which the construction of additional facilities for Incremental Development plant <br /> expansion in treatment capacity shall be completed before the existing capacity is Pen-nit application. <br /> lexceeded. <br /> PAGE 1 <br />