Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared:9/13/21 <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UST Monitoring Site Plan <br /> Site Address: DELTA ARCO 440 W.CHARTER WAY STOCKTON CA 95210 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Charter Way <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 1 x 2 6. 5. . . .. . . . . . . . 10 x 9. . . . . . . .. <br /> . . . . . . .. . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> STORE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . 3. x . . . . . .8 x7. .11 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> TL5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> n <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> C <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 1 <br /> n . . xL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . ( <br /> S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> t . . . . . . . . . . . . . . . 87 . . . . . . . . . . . . . . . . . . . . . . . <br /> O . . . . . . . . . . . KEY <br /> xL A=ANNULAR <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F=FILLS <br /> . . . . . . . . . . . O . . . . . . . . . . . . T=TURBINE <br /> *PIPING* . . . . . . . . . . . 91 . . . . . . . . . . . P=PROBE <br /> Drawing ofpiping . . - . . . . . . . . . . . . V=VAPOR <br /> exit of sump and . . . . . . . . . ONA <br /> . . . . . . . . . . . X=SUMP SENSOR <br /> UDC's.No . . . . . . . . . . . . . . . . . . . . . . . L=Leak Detector <br /> underground . . . . . . . . . . . M=Manway <br /> drawing is . , . , , , . . , . . A , , , , . , , . . . , . B=Brine Sensor <br /> accurate,we , , . , , , . . , . , I— <br /> Smart Sensor <br /> cannot speculate S=STP <br /> blue prints. C=Floats&Chains <br /> CAR WASH E=E stop <br /> _3 rr�rfave rrrrlrgrmwdffue aia rete�isr6le ro rle carr��iireg rerlaeieiax cra a <br /> �.rgfassrmrrl npirarnr arrrrrf<rs scda�rfar ir�nrrrnlxrmlprrrpc�_Drmring <br /> rrvf fa scde <br /> 8/25/20 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br /> Page 6 of 6 <br />