Laserfiche WebLink
Section 1.0 Introduction 18 August 2022 <br />Implementation <br />Actions and <br />Implementation <br />Responsibility for Oversight <br />Agency <br />Comments <br />Mitigation Measure <br />Timing <br />Responsibility <br />of Compliance/ Verification <br />Coordination <br />Hazards and Hazardous Materials <br />4.11-1a: Hazardous Substance <br />Action: <br />Project <br />San Joaquin County <br />Management, Handling, Storage, Disposal, <br />Prepare a <br />Applicant/Construction <br />and Emergency Response Plan. <br />Hazardous <br />Contractor <br />In order to reduce the risk of accidental <br />Emergency <br />release of hazardous materials during <br />Response Plan. <br />construction activities at the site, which release <br />Timing: <br />Initials <br />Initials <br />is not foreseeable or anticipated, the applicant <br />shall prepare and implement during all <br />Prior to <br />construction activities a hazardous substance <br />construction. <br />Date <br />Date <br />management, handling, storage, disposal, and <br />emergency response plan. A hazardous <br />materials spill kit shall be maintained on site <br />for small spills. Additionally, the applicant shall <br />monitor all contractors for compliance with <br />applicable regulations, including regulations <br />regarding hazardous materials and hazardous <br />wastes, including disposal. Hazardous <br />materials shall not be disposed of or released <br />on the ground, in the underlying groundwater, <br />or any surface water. Totally enclosed <br />containment shall be provided for all trash. All <br />construction waste, including trash and litter, <br />garbage, other solid waste, petroleum <br />products, and other potentially hazardous <br />materials, will be removed to a waste facility <br />permitted to treat, store, or dispose of such <br />materials. <br />4.11-2a: Maintain Appropriate Setbacks <br />Action: <br />Project Applicant <br />San Joaquin County <br />CaIGEM <br />from the "North Stockton Unit A" 1 Well, <br />Mitigate potential <br />Confirm the Integrity of Existing <br />impacts related to <br />Abandonment, and Monitor the Well in <br />Perpetuity <br />Section 1.0 Introduction 18 August 2022 <br />