Laserfiche WebLink
Section 1.0 Introduction 21 August 2022 <br />Implementation <br />Actions and <br />Implementation <br />Responsibility for Oversight <br />Agency <br />Comments <br />Mitigation Measure <br />Timing <br />Responsibility <br />of Compliance/ Verification <br />Coordination <br />standards or identifying corrective actions if <br />any exceedances are identified. <br />Transportation <br />4.19-1a: Provide Curb, Gutter and <br />Action: <br />Project Applicant <br />San Joaquin County <br />Sidewalk Between the Project Site and <br />Construct a curb, <br />Eight Mile Road <br />gutter, and <br />The applicant shall construct curb, gutter and <br />sidewalk. <br />Initials <br />Initials <br />sidewalk along the east side of West Lane <br />Timing: <br />between the southern edge of the project site <br />and Eight Mile Road. County of San Joaquin <br />During the <br />staff has determined that County -owned right- <br />construction period. <br />Date <br />Date <br />of -way is approximately 110 feet wide along <br />this portion of West Lane. A preliminary <br />assessment indicates this right-of-way width is <br />adequate to construct curb, gutter and <br />sidewalk. <br />4.19-1b: Provide On- and Offsite Bicycle <br />Action: <br />Project Applicant <br />San Joaquin County <br />Facilities <br />Provide on -and <br />The applicant shall implement the following to <br />offsite bicycle <br />ensure adequate provision of bicycle facilities. <br />facilities. <br />On -Site Bicycle Facilities. The applicant shall <br />Timing: <br />Initials <br />Initials <br />provide on-site facilities supporting the use of <br />During the <br />bicycles. These facilities shall include secure <br />construction period. <br />bicycle parking in close proximity to proposed <br />structures, and onsite bicycle paths or bicycle <br />Date <br />Date <br />lanes connecting to the proposed bicycle <br />facilities on West Lane. <br />West Lane Driveway Connection. The <br />connection of the Project site driveway to West <br />Lane shall be designed to facilitate and protect <br />Section 1.0 Introduction 21 August 2022 <br />