Laserfiche WebLink
S J C O G, Inc. <br />555 East Weber Avenue • Stockton, CA 95202 • (209) 235-0600 • FAX (209) 235-0438 <br />4_0 San Joaquin Comity Multi -Species Habitat Conservation & Open Space Plan (SJMSCP) <br />SJMSCP RESPONSE TO LOCAL JURISDICTION (RTLJ) <br />ADVISORY AGENCY NOTICE TO SJCOG, Inc. <br />To: Stephanie Stowers, San Joaquin County, Community Development Department <br />From: Laurel Boyd, SJCOG, Inc. <br />Date: November 13, 2019 <br />Local Jurisdiction Project Title: PA-1900240(SA) <br />Assessor Parcel Number(s): 059-080-07, -29, -30 <br />Local Jurisdiction Project Number: PA -1900240 (SA) <br />Total Acres to be converted from Open Space Use: Unknown <br />Habitat Types to be Disturbed: Agricultural Habitat Land <br />Species Impact Findings: Findings to be determined by SJMSCP biologist. <br />Dear Ms. Stowers <br />SJCOG, Inc. has reviewed the application referral for PA -1900240 (SA). This project consists of a Site Approval <br />application to establish a medical facility in two (2) phases over ten (10) years. Phase 1 includes the construction of a <br />30,000 square foot single story women's health facility which will provide labor and delivery, emergent medicine, and <br />outpatient surgery center services. Phase 2 includes the construction of a6,000 square foot expansion to the women's <br />ealth facility, a 28,000 square foot medical office building, a 140,000 square foot hospital with 100 beds, an emergency <br />.,eliport landing area and a 4,000 square foot physical plant. The project site is on the east side of West Lane, 460 feet <br />north of Eight Mile Road, north of Stockton (APN/Address: 059-080-07, -29, -30/11105 North Ham Lane, Lodi). <br />San Joaquin County is a signatory to San Joaquin County Multi -Species Habitat Conservation and Open Space Plan <br />(SJMSCP). Participation in the SJMSCP satisfies requirements of both the state and federal endangered species acts, <br />and ensures that the impacts are mitigated below a level of significance in compliance with the California Environmental <br />Quality Act (CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br />Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the <br />SJMSCP. Although participation in the SJMSCP is voluntary, Local Jurisdiction/Lead Agencies should be aware that if <br />project applicants choose against participating in the SJMSCP, they will be required to provide alternative mitigation in an <br />amount and kind equal to that provided in the SJMSCP. <br />This project is subject to the SJMSCP and is located within the unmapped land use area. Per requirements of the <br />SJMSCP, unmapped projects are subject to case-by-case review. This can be a 90 day process and it is recommended <br />that the project applicant contact SJMSCP staff as early as possible. It is also recommended that the project applicant <br />obtain an information package. http://www.sicog.org <br />After this project is approved by the Habitat Technical Advisory Committee and the SJCOG Inc. Board, the following <br />process must occur to participate in the SJMSCP: <br />Schedule a SJMSCP Biologist to perform a pre -construction survey prior to any ground disturbance <br />SJMSCP Incidental take Minimization Measures and mitigation requirement: <br />Incidental Take Minimization Measures (ITMMs) will be issued to the project and must be signed by the project applicant prior to any <br />ground disturbance but no later than six (6) months from receipt of the ITMMs. If ITMMs are not signed within six months, the applicant <br />must reapply for SJMSCP Coverage. Upon receipt of signed ITMMs from project applicant, SJCOG, Inc. staff will sign the ITMMs. This <br />is the effective date of the ITMMs. <br />Under no circumstance shall ground disturbance occurwithout compliance and satisfaction of the ITMMs. <br />Upon issuance of fully executed ITMMs and prior to any ground disturbance, the project applicant must: <br />a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage being covered (the bond <br />should be valid for no longer than a 6 month period); or <br />b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered; or <br />C. Dedicate land in -lieu of fees, either as conservation easements or fee title; or <br />d. Purchase approved mitigation bank credits. <br />Planning Commission Staff Report 12 <br />PA -1900240 (SA), PA -2000014 (ER), PA -2000019 (DA) <br />Response Letters <br />