My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
3919
>
4600 - Public Water System Program
>
PR0543206
>
COMPLIANCE INFO_2009-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2022 1:23:16 PM
Creation date
6/13/2022 11:25:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4600 - Public Water System Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2014
RECORD_ID
PR0543206
PE
4630
FACILITY_ID
FA0007111
FACILITY_NAME
FRENCH CAMP GOLF COURSE
STREET_NUMBER
3919
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
20103014
CURRENT_STATUS
01
SITE_LOCATION
3919 E FRENCH CAMP RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CORRECTIVE ACTIONS AFTER SOURCE INVESTIGATION : <br /> Upon correcting the identified physical deficiencies , disinfect the water in the well casing using NSF 61 approved chlorine and AVMA procedures . Apply <br /> chlorine at 50 ppm concentrations into the well . Circulate the chlorinated water within the well, up through the pump column , into the pressure tank and back down <br /> into the well by turning on the well and opening a valve/hose bib at the pressure tank. Connect a hose to a hose bib at the pressure tank that terminates with a <br /> small diameter wand able to spray a circular spray pattern to wet the sides of the well casing and pump column above the water table, when the wand is inserted <br /> into the wellhead seal access port. Circulate the chlorinated water down the sides of the well casing for 30 minutes, as noted above . Test the chlorine residual <br /> through this process to ensure 50 ppm chlorine residual . Dose well as needed to maintain 50 ppm chlorine residual. After 30 minutes, turn off the well , close the <br /> valve/hose bib at the pressure tank, disconnect the hose, and seal the wellhead at access port to be water tight. Allow 12-24 hours for the 50 ppm chlorinated <br /> water to reside in the well . A successful disinfection requires a residual of at least 10 ppm to be present after the 18-24 hours. If the chlorine residual is found to <br /> be non-detectable, then the disinfection process may not have been successful . Repeat the disinfection process. If residual is at least 10 ppm , flush the well <br /> water to waste and resample the well for non-detect chlorine residuals. Contact your laboratory to collect a wellhead sample to test for chlorine residuals and TC <br /> bacteria , using enumeration test methods. Once SOURCE is absent proceed with disinfecting DISTRIBUTION SYSTEM as noted below. Contact the EHD if you <br /> need guidance with this procedure . <br /> If Well Continues to Fails : Investigate the well casing using a camera and record the findings to determine the condition of the casing , movement of <br /> groundwater in and out of the well column , presence of oil from a turbine pump , tree roots, other contributing deficiencies that may cause the well to test positive <br /> for TC . Submit a copy of the well down-hole investigation recording to the EHD and contact the EHD for guidance at (209) 468-3420. <br /> INVESTIGATION of a TCR MCL if the SOURCE is absent and the DISTRIBUTION SYSTEM is positive for TC : Have your laboratory collect additional "Other" <br /> TC Bacteriological samples to determine if the pressure tank, storage tank, and/or treatment system is a TC source. Collect a sample down stream of these <br /> components to determine if the bacteriological problem begins at these components. If the initial " Other' result is absent for TC , then go to DISTRIBUTION <br /> SYSTEM & investigate the distribution lines down stream of these components. If the "Other" result is positive , then sample down stream of each component to <br /> further ID where the system begins to fail for TC . Perform an inspection as detailed below in the Treatment, Stora e , and Pressure Tank sections. <br /> TREATMENT USING CHLORINE FEED SYSTEM? YIN COMMENTS <br /> If N , then go to next section Plant ID Plant ID Plant ID <br /> Inspect each point where disinfectant is added and report, any leaks? YIN <br /> Is the disinfectant feed tank full with chlorine & what is the ppm concentration? <br /> Are there contaminants in the chlorine feed tank? YIN <br /> What is the disinfectant residual down stream of injection point? <br /> What is the disinfectant residual at the end points of the system or repeat sites? A drop in chlorine indicates the <br /> Repeat 1 / Repeat 2/_, Repeat 3/ End pt 1 / , End location of the problem. Find where <br /> initialthe decreasedown <br /> pt. 2/ stream ofthenjection point.. <br /> Is the disinfectant feed tank and equipment stored in a protected manner (i.e. Is tank stored out of the House equipment in an enclosure to <br /> sun , protected from rain , lid is sealed on tank 81id sealed at tubes, no openings to tank, irrigation exclude vermin and elements. <br /> water is not sprinkling over the equipment, birds/vermin are not nesting overhead)? YIN <br /> Is the tank' s water fill line protected by a back flow device or proper air gap? YIN Install a proper back flow device on <br /> fresh water fill line. <br /> TREATMENT USING MEDIA? YIN , If N , then go to next section . vessel ID Vessel Io vessel ID COMMENTS <br /> Is a Treatment Vessel positive for Bacteria? If N , then go to next section <br /> What is the MPN concentration of bacteria in each vessel? <br /> What is the media in each vessel? <br /> Is a vessel not in use, is it valved off? YIN <br /> Inspect each treatment vessel for leaks at joints, valves, connections at top and bottom of <br /> the vessels, man-was not closed. Note if a leak was found and where at each vessel . <br /> Was the media recently exchanged in a vessel or repair made to a vessel? Y/N This work may have caused TCR MCL. <br /> Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.