Laserfiche WebLink
4 <br />Executive Officer. In addition, the discharger shall provide the <br />results of any sludge analyses as specified by the RWQCB's <br />Executive Officer. <br />b. The discharger shall provide safeguards to electric power failure as <br />follows; <br />(1) The discharger, within ninety (90) days of the effective date <br />Of this Order, shall submit to the appropriate RWQCB for <br />approval a description of the existing safeguards provided to <br />assure that; should there be reduction, loss, -or failure of <br />electric power, the discharger shall comply with the terms <br />and conditions of its Order. - Such safeguards may include <br />alternate power sources, standby generators,'retention <br />capacity, operating .procedures, or other means. A <br />description of the -safeguards provided shall include an <br />analysis, of the frequency, duration, and impact of power <br />failures experienced over the past five years or from time of <br />startup, whichever is shorter, on effluent quality and" on the <br />capability of the discharger to comply with the terms and <br />conditions of the Order. The appropriate RWQCB shall <br />determine whether the safeguards are adequate. <br />(2) Should the RWQCB not approve the existing safeguards, <br />the discharger, within ninety (90) days of having been <br />advised by the appropriate RWQCB that the existing <br />safEguards are inadequate, shall provide to'the RWQCB a <br />schedule of compliance for providing safeguards such that in <br />the event of reduction, loss, or failure of electric power,•the <br />permittee will comply with the terms and conditions of this - <br />Order. The <br />his•Order..The schedule of compliance, upon approval of the <br />appropriate RWQCB's Executive Officer, shall mbecome a <br />condition of this Order as it applies to the specific . <br />discharger. <br />(3) If the discharger already has an approved plan(s), the plan <br />shall be revised and. updated as specified in the plan or <br />whenever there has been a material change in design or <br />operation. A revised plan shall be submitted to,the, <br />appropriate RWQCB within ninety (90) days of the material <br />change. <br />4. For Subsurface Disposal Systems, the Following Additional <br />Provisions Apply, <br />