My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
3919
>
4600 - Public Water System Program
>
PR0543206
>
COMPLIANCE INFO_2009-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2022 1:23:16 PM
Creation date
6/13/2022 11:25:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4600 - Public Water System Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2014
RECORD_ID
PR0543206
PE
4630
FACILITY_ID
FA0007111
FACILITY_NAME
FRENCH CAMP GOLF COURSE
STREET_NUMBER
3919
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
20103014
CURRENT_STATUS
01
SITE_LOCATION
3919 E FRENCH CAMP RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DISTRIBUTION SYSTEM INVESTIGATION CORRECTIVE ACTIONS: <br />Wake required corrections to the system to eliminate the entrance of bacteria into the system. Flush system and all dead end lines with clean wail water. Disinfect <br />the system with NSF 61 approved chlorine at 100 ppm for a contact period of at least 3, but not more than 24 hours at 10 ppm, per A"A standards. Ensure <br />every hose bib, faucet, toilet, shower, and any dead and line is flushed with a 100 pprn residual, by testing each site using a field test kit or for a chlorine odor <br />where testing is not practical. Test for a 100 ppm chlorine residual, after two hours through oul the system. If the residual tests below 100 ppm, increase ttte <br />concentration to back. 100 ppm. A successful disinfection requires a residual of 100 opm to be present after the 3 hours, or at least 10 parr► after 24 hour contact <br />period. If the residual is found to be non-detectable (ND) at a location, with 50-10 ppm at other locations, or with NO residuals through out the system, then the <br />disinfection process may not have been successful. This may bg an indication of where bacterig arq entering into the system. Repeat the investigation, flushing, <br />and disinfection processes. After the disinfection process, flush the system until it tests non -detect for chlorine residuals. Resample by directing your iabor-atoay <br />to collect "Other" samples and test for chtoriru� residuals and TC bacteria, using enameratign 11gi mefttods from locations that were effected. NOTE: The nwntfi <br />following a TCR IMCL, you are to direct your laboratory to collect 5 ROUTINE samples and have them test for 01orine re- ttals and TC bacterue, usin <br />enumeration test method. tithe QE5TRIBUTION SYSTEM Continues to Fails, contact the EHD for guidance of (209) 466-3420. <br />,_3.� .' ,Y;s_ ..' <br />iIA • b1z I:!i o i i� <br />•k <br /><'31�'-K _ .�y«,;'. <br />rttR�A� 7a <br />Uaf',1 lt: <br />.`�.;m ,::..o•'Yw �:�?;,'.''<.i:. -�' 3 <br />1 f , key rc. <br />i.'L`y`T°'-�v—„ 'Rlbta.v(?'u rr„' x <br />1 Qa Ti <br />ui WfWAVALM <br />• <br />..MIR= <br />w <br />T-10 <br />MQQAZZ"A <br />auornrr mis compiewo mrm w ine 011, oy Tax at (MJ) 468-8341, or Mail to SJGEHD, SPINS Program, 600 East gain Street, Sb -- Ca, 95202, within 30 days of the system <br />failing the TGR, along with additional TC results that indicate the system is now incomplianos with the TCR. Failure to submit form will result Jn a Procedural Vloladon he of $230. <br />
The URL can be used to link to this page
Your browser does not support the video tag.