Laserfiche WebLink
IaiSTRIBUTION SYSTEM INVESTIGATION CORRECTIVE ACTIONS: <br /> Wake required corrections to the system to eliminate the entrance of bacteria into the system. Flush system and all dead end lines with clean wail water. Disinfect <br /> the system with NSF 61 approved chlorine at 100 ppm for a contact period of at least 3, but not more than 24 hours at 10 ppm, per A"A standards. Ensure <br /> every hose bib, faucet, toilet, shower, and any dead and line is flushed with a 100 pprn residual,by testing each site using a field test kit or for a chlorine odor <br /> where testing is not practical. Test for a 100 ppm chlorine residual, after two hours through oul the system. If the residual tests below 100 ppm, increase ttte <br /> concentration to back. 100 ppm, A successful disinfection requires a residual of 100 opm to be present after the 3 hours, or at least 10 parr► after 24 hour contact <br /> period. If the residual is found to be non-detectable (ND)at a location,with 50-10 ppm at other locations, or with NO residuals through out the system,then the <br /> disinfection process may not have been successful. This may bg an indication of where bacterig arq entering into the system. Repeat the investigation, flushing, <br /> and disinfection processes. After the disinfection process,flush the system until 9 tests non-detect for chlorite residuals. Resample by directing your iabor-atoay <br /> to collect"Other"samples and test for chtoriru�residuals and TC bacteria,using enameratign 11gi mefttods from locations that were effected. NOTE: The nwntfi <br /> following a TCR NCL, you are to direct your laboratory to collect 5 ROUTINE samples and have them test for 01ort to residuals and TC bacterue,usin <br /> enumeration test method. tt_the QE5TRIBUTIC3N SYSTEM Continues to Fails, contact the EHD for guidance at(209)466-3420. <br /> ,d+,ria a ripkrt Of ffte i <br /> INVESTtGATiON FINDINGS: <br /> -11 CA6ndT 1L C c.,l eel CoQ 5 <br /> OQ 1P <br /> REPAIRS MADE, OR TO BE MADE, TO EXLUDE THE ENTRANCE OF BACTERIA AND DATE OF THE CORRECTION. <br /> t <br /> DISINFECTION PROCESS: 4-05 �4 IC-e�✓1 <br /> V n,,A I vi A-U z0 car-A oserA w o40 <br /> 57t a <br /> e,1L -t ln-L C_ w e 'uS <br /> �sQ cn je,� o fnV= Z4 H 0 <br /> -r O S E W\260- tV\L C-L2 I<-Q C t w Oi S <br /> 5 t u l'v , <br /> Submit this completed form to the EHO,by fax at(209)468-0341,or Mail to SJC-EHD, SPWS Program.600 l=ast gain Street,Stockton Ca,95202,within 30 days of the system <br /> failing the TGR,along with additional TC results that indicate the system is now tacomplianoe with the TCR. Failure to submit form will result Jn a Procedural Vloladon he of$230. <br />