Laserfiche WebLink
2 <br />  <br />  <br />Fax: (209) 468‐0341  <br />Email: vwong@sjcehd.com  <br />  <br />   <br />From:   Vance Wong [EH]  <br />Sent:   Monday, September 12, 2016 10:32 AM  <br />To:    'Sam Hedge'; 'Steven Guaraglia'  <br />Cc:    Steven Shih [EH]; Domenique Martorella [EH]  <br />Subject:  20160912 French Camp Golf Course & RV Park_2016 Routine Inspection  <br />  <br />Steve & Sam,  <br />  <br />It was a pleasure to meet both of you.  Please find attached a copy of your Official Inspection Report (OIR).   I have  <br />assigned December 31, 2016 (#2 & 3) & March 31, 2017 (#1) as the Compliance Date by which all corrections are to be  <br />completed.  <br />  <br />You may choose to submit any required forms, photos of work completed, etc. as a means to document and verify that  <br />all Corrective Actions have been completed.  Please direct to the attention of Vance Wong, REHS if submitting by U.S.  <br />mail. Please send to vwong@sjcehd.com if submitting by email.  <br />  <br />*Abandoned well:  As an alternative to destruction, the well may be “put back into service” as an AG well.  <br />Do not hesitate to our office if you have any questions, or if we can be of any assistance.  <br />Vance Wong, REHS  <br />1868 E. Hazelton Ave.  <br />Stockton, CA 95202  <br />(209) 953‐7310  <br />Fax: (209) 468‐0341  <br />Email: vwong@sjcehd.com  <br />  <br />   <br />From:   Sam Hedge [mailto:samhedge@caldsl.net]  <br />Sent:   Friday, September 09, 2016 9:39 PM  <br />To:    Vance Wong [EH]  <br />Cc:    Steven Shih [EH]; Domenique Martorella [EH]; 'Steven Guaraglia'; 'Sharon Milar'  <br />Subject:  RE: 201609‐07 French Camp Golf Course & RV Park_2016 Routine Appointment_Friday Sept 9 at 1200 noon  <br />  <br />Hello Vance,  <br />  <br />Just wanted to say thank you for moving your schedule to facilitate me being on site for your inspection today at French  <br />Camp RVP. Steve and I both concur, your thoroughness and insight to some of the items you pointed out are very much  <br />appreciated. We have some work ahead of us, we are both confident that we are in a good position to complete some   <br />of these items ahead of receiving your official report and all of them certainly well within and ahead of any time frame  <br />you may allow us.  <br />  <br />Attached you will find current Sample Site Plan and Water Quality Emergency Notification Plan for your review.  <br />  <br />I was particularly interested in the very large Grey pump with the very small pipe lines you pointed out in the back of the  <br />restaurant.  <br />