Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: 07/14/2022 <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> Monitoring Plan Site Marg <br /> 0V <br /> L)E042{1001 <br /> Piping 25,K UST 111b,Le <br /> Sumpwf Diesel <br /> Sansi 80-20) Middle Sump uW Sensor{13}7 39 <br /> S4-2[) S <br /> —ril l Sump wf Sensor(1-2) Drawing NOT <br /> ,•- - IJ94394-209.ATG lfe t and#]a]r Tank to Scale <br /> r <br /> A nular Sensor Return Uses <br /> I ?' } (L1)7S"90-420 <br /> 0verflll _ , x C2 Ai,n:dA� <br /> Alarm - -------- <br /> Conti nm ent Vent Sump wJ Senser(LS)70 0-200 <br /> Pan Sensor Roof Fnounber! <br /> (L-P)794380-20$ Y nt engine <br /> 3 Encl"ure <br /> TT <br /> 350 lulus Riseraien�ent JE; UE Ea200 g I B Ely Tank <br /> Supply Smse 14 ent AreaTransftlon Level W <br /> Sum W1 r=04214006 710 3� AZOSensor(I-' ) L9 Hi La+r0E00 gal Belly Tank Le <br /> 9a39a azn 5, <br /> 794389-208 T94390-420 o from L12 Gen Floor 2 <br /> n■rst Roo! 74380-248 <br /> L1 i Gen Floor 1 <br /> �• �$ T T building <br /> 79 Ar 1l Floor Roof <br /> 794390-3480-34� <br /> 02svmgnt Fuel L1:3 Sec Pipe Roof <br /> Imes 11,8 Trans Sox X3$0 208 <br /> 79438 -2�$ <br /> Page 6 of 6 <br />