Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM Pae 5 of 6) <br />XII. LINE LEAK DETECTOR TESTING <br />Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) <br />Y <br />N <br />NA <br />section must be completed if LLDs are installed. <br />Was a leak simulated to verify LLD performance? E] <br />E] 0.1 GPH ❑ 0.2 GPH <br />(Check all that apply.) Simulated leak rete verified: H3GPH <br />X <br />❑ <br />❑ <br />Was the testing apparatus property calibrated? <br />For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? <br />❑ <br />[9 <br />❑ <br />❑ <br />For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? <br />� <br />For electronic LLDs, does the turbine automatically shut off when a leak is detected? <br />is disabled or disconnected? <br />❑ <br />❑ <br />9 <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />❑ <br />❑ <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />❑ <br />❑ <br />For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? <br />❑ <br />❑ <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />❑ <br />❑ <br />Were all LLDs confirmed operational within regulatory requirements? <br />For any answer of "H" above, describe in Section Xlll how and when these issues were or will be corrected. <br />XIII. COMMENTS <br />XIV. VACUUM I PRESSURE I HYDROSTATIC MONITORING EQUIPMENT TESTING <br />Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br />This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br />System Type (Mark all that apply.) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br />Sensor Functionality Interstitial Communication <br />Ensor ID Component(S) Monitored By This Sensor Test <br />Test <br />❑ Pass ❑ Fail ❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail ❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />E] Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑Fail <br />❑ Pass <br />❑ Fail <br />How was interstitial communication verified? ❑ Simulated Leak at Far Ends of the Interstitial Space ❑ Visual Inspection <br />Other Describe the method in section XV below. Gauge <br />Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑ Yes ❑ No (Describe the reason in <br />section XV below.) <br />For any answer of "Fail" above, describe in Section XV how and when these issues were or will be corrected. <br />XV. COMMENTS <br />GPH =talons Per Hour. Y = Yes, N = No, NA= Not Pppk2bie,VPH=Vawu pyesstneHydrostatic, ID = Identification <br />