My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 2:59:31 PM
Creation date
6/29/2022 2:37:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231604
PE
2361
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by [ Manufacturer `7 Industry Standard C Professional Engineer <br /> Test Type C Pressure [ Vacuum Hydrostatic <br /> Test Equipment Used: Caldwell system <br /> i Sump/UDC ID 87 stp sump 91 stp sump UDC 7-8 UDC 5-6 <br /> i Sump Manufacturer unknown unknown S Bravo S Bravo <br /> Sump Depth (inches) 54" 54" 28" 28" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) 20" 19" 8" 8" <br /> I Test Start Time 10:15 am 11:50am 12:00 p.m 12:00 p.m <br /> r <br /> Initial Reading 24" 23" 12" 12" <br /> Test End Time 11:15 am 12:20 pm 12:30 p.m 12:30 p.m <br /> LFinal Reading 2411 23" 12" 12" <br /> Change in Reading 0 0 p 0 <br /> Pass/Fail Criteria 2 1 .2 2 2 <br /> Tightness Test Results I^[Wic— Pass rr Fail ' FR�j Pass E- Fail I F Pass [ Fail 1�rj7 Pass C Fail <br /> Sump/UDC ID UDC 3-4 UDC 1-2 UDC15-16 UDC 13-14 <br /> Sump Manufacturer S Bravo S Bravo ' S Bravo <br /> S Bravo � <br /> Sump Depth (inches) 2811 28" 28" 28" i <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) 8" 8" 8" 8" <br /> Test Start Time <br /> 12:45 pm 12:45 pm 12:45 pm 1:30 pm <br /> Initial Reading 12" 12" 12" 12" <br /> Test End Time 1:15 pm 1:15 pm 1:15 pm 2:00 pm <br /> I Final Reading 12" 12" 12" 12" <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria 2 2 2 2 <br /> Tightness Test Results C Pass Fail ! Pass C Fail ;� Pass C Fail N Pass li""i Fail j <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.