2Y211 BACKWA
<br />W/ SIGHT GLAS
<br />4" POOL MAIN DRA
<br />POOL FRESH
<br />SUPPLY CONN
<br />TO RETUI
<br />4" POOL SKIMMI
<br />4" POOL RETUF
<br />4" SPA RETUF
<br />4" SPA SKIMMI
<br />SPA FRESH
<br />SUPPLY CONN
<br />TO RETU I
<br />4" SPA MAIN DRA:
<br />2Y2" BACKWA!
<br />W/ SIGHT GLAS!
<br />4" SPA SKIMME
<br />4" SPA MAIN DRAI
<br />2" FROM HEATER EFI
<br />2Y2" BACKWA,"
<br />W/ SIGHT GLAS:
<br />2" TO HEATER INf
<br />2" SECOI
<br />AIR LINE W/ 12'
<br />FOR SR
<br />6" SPA JET SUCTIOI
<br />4" SPA JET RETURI
<br />POOL/SPA EQUIPMENT ROOM LAYOUT
<br />„
<br />z 11-0
<br />SEE CHART
<br />FOR SPACING
<br />STAINLESS PIPE
<br />CLAMP
<br />PIPE
<br />FIBERGLASS
<br />STRUT CHANNEL
<br />(100 OR 200
<br />SERIES) -�
<br />a:
<br />%" X 5" KWIK 01 100 SERIES 1-1/8"
<br />BOLT1_5'8„ 200 SERIES 1-5/8"
<br />FRONT VIEW SIDE VIEW
<br />FIXED PIPE CLAMPS by StrutTech
<br />m
<br />MAX. SPACING
<br />MODEL NUMBER
<br />5 1-1/2"
<br />T-0"
<br />PIPING NOTES
<br />2"
<br />5'-0"
<br />NOTES
<br />2-1/2"
<br />~
<br />UFCPU250SS
<br />3"
<br />6'-6"
<br />ALL PIPING MUST PASS A PRESSURE TEST AT 25 PSI FOR 30
<br />4"
<br />HAZARD IDENTIFICATION SIGNS:
<br />_
<br />v
<br />� °®°
<br />UFCPU60OSS
<br />8"
<br />MINUTES MINIMUM.
<br />UFCPU80OSS
<br />IDENTIFICATION SIGNS A
<br />VISIBLE HAZARD IDS SPECIFIED IN NF PA
<br />Q
<br />O
<br />704 FOR THE SPECIFIC MATERIAL CONTAINED SHALL BE PLACED
<br />a
<br />FILTER
<br />PIPING DIAGRAMS ARE PROVIDED TO IDENTIFY EQUIPMENT AND
<br />ON STATIONARY CONTAINERS AND ABOVE GROUND TANKS AND
<br />HEATER
<br />ACCESSORIES, TO INDICATE RELATIVE POSITIONS ON THE
<br />AT ENTRANCES TO LOCATIONS WHERE HAZARDOUS MATERIALS
<br />CIRCULATION LOOP, AND TO SHOW PIPE SIZES AND FLOW
<br />ARE STORED, DISPENSED, USED OR HANDLED IN QUANTITIES
<br />cn
<br />DIRECTION. THE FINAL CONFIGURATION MUST BE COORDINATED
<br />REQUIRING A PERMIT AND AT SPECIFIC ENTRANCES AND
<br />PUMP '�
<br />O
<br />PLUMBING PENETRATIONS
<br />WITH SITE CONDITIONS.
<br />LOCATIONS DESIGNATED BY THE FIRE CODE OFFICIAL IN
<br />y RETURN
<br />FROM
<br />THROUGH FLOOR (TVP. )
<br />LOCATE AS SHOWN.
<br />ALL PLUMBING TO BE NSF APPROVED SCHEDULE 40 PVC UNLESS
<br />ACCORDANCE WITH 2703.5.
<br />TO POOL
<br />POOL
<br />REFER TO PLUMBING
<br />NOTED OTHERWISE.
<br />CHEMICAL STORAGE CABINETS SHALL BE IN ACCORDANCE W/
<br />PLAN FOR PIPE SIZE.
<br />SECTIONS 2703.8.7.1 AND 2703.8.7.2.
<br />ALL PIPING SHALL BE LOCATED CLEAR OF ALL FOOTINGS AND
<br />NO ELECTRICAL EQUIPMENT OR DEVICES SHALL BE LOCATED IN
<br />OBSTRUCTIONS.
<br />THE CHEMICAL CABINET.
<br />NOTE: REFER TO MANUFACTURERS SPECIFICATIONS FOR
<br />ADDITIONAL INFO AND INSTALLATION
<br />ALL EXPOSED PIPING TO BE CLEARLY MARKED TO INDICATE
<br />CABINET SHALL BE LISTED IN ACCORDANCE WITH UL 1275 AS
<br />FUNCTION AND DIRECTION. ALL VALVES MUST BE MARKED TO
<br />SUITABLE FOR THE INTENDED STORAGE
<br />PPG
<br />ACCU—TAB
<br />CHLORINATOR
<br />�-
<br />c�
<br />INDICATE USE.
<br />WARNING MARKINGS:
<br />NTS
<br />O
<br />A VALVE, ELBOW OR TEE INSTALLED IN THE SUCTION LINE SHOULD
<br />CABINETS SHALL BE CLEARLY IDENTIFIED IN AN APPROVED
<br />°
<br />_
<br />BE NO CLOSER TO THE FRONT OF THE PUMP THAN 5 TIMES THE
<br />MANNER WITH RED LETTERS ON A CONTRASTING BACKGROUND
<br />SUCTION LINE PIPE DIAMETER. (LE, 4 IN. PIPE REQUIRES A 20 IN.
<br />TO READ: HAZARDOUS - KEEP FIRE AWAY
<br />o 7„ c o
<br />STRAIGHT RUN IN FRONT OF THE SUCTION INLET OF THE PUMP.)
<br />THE CABINET INCLUDING THE DOOR SHALL BE STEEL 18 GAGE,
<br />HAIR AND LINT STRAINERS ARE REQUIRED FOR PUMPS AND SHALL
<br />DOUBLE WALLED W/ 1.5" AIRSPACE BETWEEN THE WALLS.
<br />BE PROVIDED.
<br />JOINTS SHALL BE RIVETED OR WELDED AND TIGHT FITTING.
<br />"
<br />O
<br />WHEN REQUIRED, POOL WILL DRAIN THROUGH SAME PLUMBING AS
<br />DOORS SHALL BE WELL FITTED, SELF CLOSING AND EQUIPPED
<br />WITH A SELF LATCHING DEVICE.
<br />BACKWASH TO SUMP PTT. A MULTI PORT VALVE LOCATED AT THE
<br />Q.. D
<br />FILTER IS MANUALLY OPERATED FOR EACH CT ,PLUMBING
<br />FUNCTION.
<br />THE BOTTOMS OF CABINETS FOR STORAGE U
<br />RAGE OF LIQUIDS SHALL
<br />IS INDIRECT AS IT ENTERS THE SUMP PIT.
<br />BE LIQUID TIGHT TO A HEIGHT OF 2"
<br />r
<br />WASTEWATER FROM PERIODIC DRAINING/BACKWASHING OF POOL
<br />MATERIALS THAT ARE INCOMPARABLE SHALL NOT BE STORED IN
<br />EYEWASH SHOWS
<br />O
<br />a a�
<br />OR SPA SHALL BE DISCHARGED INTO THE SANITARY SEWER,
<br />THE SAME CABINET
<br />4
<br />0
<br />(BY GENERAL
<br />CONTRACTOR)
<br />_.- ,^ r
<br />rN
<br />®
<br />a
<br />ALL PIPING ON THE EXTERIOR OF THE POOL AND SPA SHALL BE
<br />A CCU -TAB NOTES:
<br />O ES.
<br />BURIED A MIN. 24" BELOW GRADE. ALL PIPING AT EXTERIOR OF
<br />BUILDING SHALL BE BURIED BELOW FROST,
<br />* ECOLAB TO PROVIDE AND INSTALL ALL MATERIAL NEEDED FOR
<br />rn
<br />INSTALLATION OF THIER EQUIPMENT INCLUDING BUT NOT LIMITED
<br />_.
<br />O
<br />ALL PLUMBING SHALL CONFORM TO THE CALIFORNIA PLUMBING
<br />TO CHLORINATORS, CHEMICAL CONTROLLERS, VALVES, PIPE, ALL
<br />CODE AND THE CALIFORNIA BUILDING CODE.ASSOCIATED
<br />ELECTRICALBOND, ING, PUMPS, ANY AND ALL
<br />-
<br />ASSOCIATED COMPONENTS AND HARDWARE, PHONE LINES AND
<br />2"0
<br />`
<br />IF,
<br />PIPING AND TUBING SHALL BE IDENTIFIED IN ACCORDANCE WITH
<br />PHONE JACKS.
<br />O
<br />o N
<br />ASME A13.1 AND SHALL INDICATE THE MATERIAL CONVEYED.
<br />cr' r'
<br />ECOLAB MUST HAVE THEIR EQUIPMENT INSTALLED AND OPERABLE
<br />8
<br />9
<br />O
<br />PIPING CONVEYING CHEMICALS SHALL BE OF CORROSION
<br />PRIOR TO FINAL HEALTH INSPECTION
<br />e1V
<br />1 ,
<br />4' 4'-10" 1'
<br />RESISTANT TYPE.
<br />1F
<br />4 0
<br />3 10
<br />* POOL CONTRACTOR TO PROVIDE POINT OF CONNECTION (TEE
<br />TEE
<br />ELECTRICAL PANEL
<br />14'-8°
<br />PROVIDE AN INLINE THERMOMETER ON THE RETURN LINES.
<br />FITTINGS) ONLY TO POOL/SPA CIRCULATION LOOPS,
<br />2" TO HEATER INFLUENT
<br />2 5 (BY GENERAL /►
<br />CONTRACTOR) PLUMBING PENETRATION PLAN
<br />FLOW MEASUREMENT: A FLOW METER OR OTHER DEVICE WHICH
<br />GIVES
<br />POOL ELECTRICAL CONTRACTOR SHALL PROVIDE
<br />10
<br />� }
<br />A FLOW RATE IN GPM MUST BE PROVIDED. FLOW METER
<br />(2) 120V 20A CIRCUITS WITH RECEPTACLES MOUNTED ON THE WALL
<br />AT
<br />EQUIPMENT
<br />ROOM
<br />SHALL BE LOCATED ON A STRAIGHT RUN OF PIPE A MINIMUM OF 10
<br />TIMES THE
<br />IN THE ROOM DESIGNATED FOR THE ECOLAB ACCU TAB
<br />CHLORINATORS.
<br />2Y2" BACKWASH LINE
<br />-
<br />31'0 3
<br />PIPE DIAMETER FROM ANY DISTURBANCES BEFORE THE
<br />W/ SIGHT GLASS (TYP.)
<br />i/4"=1'-0"
<br />METER AND 4 TIMES THE PIPE DIAMETER AFTER THE METER.
<br />IDEALLY THESE OUTLETS SHOULD BE LOCATED WITHIN 3 FEET OF
<br />THE ACCU-TAB CHLORINE DISPENSERS.
<br />2" FROM HEATER EFFLUENT
<br />©
<br />'
<br />ALL PIPING MUST BE SUPPORTED CONTINUOUSLY OR AT
<br />(2) 120V 20A RECEPTACLES INSTALLED WITHIN 2 FEET OF EACH
<br />4" POOL MAIN DRAIN LINE
<br />_
<br />_.... _.-.. _____.__ _.�___.____.________ ._. .___ .._.
<br />SUFFICIENTLY CLOSE INTERVALS TO PREVENT SAGGING.
<br />CONTROLLER BOARD IN THE SAME ROOM.
<br />4" POOL SKIMMER LINE
<br />11 15 3"0
<br />f �
<br />ALL PIPING AND VALVES IN THE EQUIPMENT ROOM SHALL BE
<br />5 6
<br />SP401
<br />12
<br />2 _ n
<br />LABELED AS TO PURPOSE AND DIRECTION OF FLOW.
<br />REFER TO ELECTRICAL DRAWINGS EPI AND EP2
<br />2Y211 BACKWA
<br />W/ SIGHT GLAS
<br />4" POOL MAIN DRA
<br />POOL FRESH
<br />SUPPLY CONN
<br />TO RETUI
<br />4" POOL SKIMMI
<br />4" POOL RETUF
<br />4" SPA RETUF
<br />4" SPA SKIMMI
<br />SPA FRESH
<br />SUPPLY CONN
<br />TO RETU I
<br />4" SPA MAIN DRA:
<br />2Y2" BACKWA!
<br />W/ SIGHT GLAS!
<br />4" SPA SKIMME
<br />4" SPA MAIN DRAI
<br />2" FROM HEATER EFI
<br />2Y2" BACKWA,"
<br />W/ SIGHT GLAS:
<br />2" TO HEATER INf
<br />2" SECOI
<br />AIR LINE W/ 12'
<br />FOR SR
<br />6" SPA JET SUCTIOI
<br />4" SPA JET RETURI
<br />POOL/SPA EQUIPMENT ROOM LAYOUT
<br />„
<br />z 11-0
<br />SEE CHART
<br />FOR SPACING
<br />STAINLESS PIPE
<br />CLAMP
<br />PIPE
<br />FIBERGLASS
<br />STRUT CHANNEL
<br />(100 OR 200
<br />SERIES) -�
<br />a:
<br />%" X 5" KWIK 01 100 SERIES 1-1/8"
<br />BOLT1_5'8„ 200 SERIES 1-5/8"
<br />FRONT VIEW SIDE VIEW
<br />FIXED PIPE CLAMPS by StrutTech
<br />PIPE SIZE
<br />MAX. SPACING
<br />MODEL NUMBER
<br />5 1-1/2"
<br />T-0"
<br />UFCPU 150SS
<br />2"
<br />5'-0"
<br />UFCPU20OSS
<br />2-1/2"
<br />6-O"'
<br />UFCPU250SS
<br />3"
<br />6'-6"
<br />UFCPU30OSS
<br />4"
<br />7'-6"
<br />UFCPU40OSS
<br />6"
<br />8'-6"
<br />UFCPU60OSS
<br />8"
<br />9'-01"
<br />UFCPU80OSS
<br />PVC PIPE WALL HANGER DETAIL
<br />1/4" X 3" S.S.
<br />TAPCON BOLT &
<br />NTS
<br />HEATER FILTER
<br />POOL EQUIPMENT ANCHORAGE
<br />N.T.S
<br />OUTDOOR
<br />O
<br />1
<br />2
<br />3
<br />4
<br />5
<br />6
<br />7
<br />8
<br />9
<br />10
<br />11
<br />12
<br />13
<br />14
<br />15
<br />POOL EQUIPMENT
<br />ITEM
<br />FILTER (RE:2/SP401)
<br />BACKWASH VALVE
<br />CIRCULATION PUMP
<br />HEATER
<br />PRESSURE GAUGE
<br />THERMOMETER
<br />FLOW METER
<br />CHECK VALVE
<br />CHECK VALVE
<br />2 PORT VALVE (3")
<br />2 PORT VALVE (4")
<br />CHLORINATOR
<br />CHEMICAL CONTROLLER
<br />WATER LEVEL CONTROLLER
<br />VACUUM GAUGE
<br />REFER TO APPROVED TI PLANS FOR ADDITIONAL
<br />SHEET INDEX ON SP001 FOR ALL REFERENCED
<br />SCHEDULE
<br />MANUFACTURER
<br />PENTAIR
<br />PENTAIR
<br />PENTAIR
<br />RAYPAK
<br />WIKA
<br />PENTAIR
<br />BLUE WHITE
<br />JANDY
<br />JANDY
<br />SPEARS
<br />SPEARS
<br />PPG
<br />ACU-TROL
<br />MILLENIUM
<br />SUPER PRO
<br />INFORMATION.
<br />SHEETS.
<br />(IN EQUIPMENT
<br />MODEL NO.
<br />TR -140C
<br />263080
<br />WFE-6
<br />407A Lo-NOx ASME
<br />113,13 GLYCERINE FILLED
<br />SL1DW
<br />F -30400P
<br />7305
<br />7307
<br />2622-030
<br />2622-040
<br />ACCU-TAB 3070
<br />AK2100
<br />LEVELOR K1100
<br />SPG -06-1008
<br />SEE
<br />ROOM)
<br />DESCRIPTION
<br />HIGH RATE SAND, SIDE MOUNT
<br />FULLFLO XF BACKWASH VALVE
<br />15 HO; 208-230V, 9.6-8.8 AMPS
<br />399,000 BTU NATURAL GAS
<br />60 PSI INFLUENT & EFFLUENT AT SAME HEIGHT
<br />INLINE THERMOMETER
<br />4" 125-500 GPM FLOW RANGE
<br />2"-2%2" CHECK VALVE
<br />2%"-3" CHECK VALVE
<br />3", SCH. 40, BALL VALVE
<br />411, SCH. 40, BALL VALVE
<br />*PROVIDED AND INSTALLED BY ECOLAB.
<br />ACCU-TAB SYSTEM POWERBASE EROSION
<br />FEEDER. REFER TO NOTES THIS SHEET
<br />*PROVIDED AND INSTALLED BY ECOLAB
<br />ELECTRONIC WATER LEVELER
<br />2" 30# %4" BTM STEEL
<br />2
<br />2
<br />NO.
<br />REQD
<br />2
<br />2
<br />2
<br />2
<br />4
<br />1
<br />1
<br />1
<br />2
<br />1
<br />4
<br />1
<br />1
<br />1
<br />2
<br />T-1
<br />SPA EQUIPMENT SCHEDULE (IN EQUIPMENT ROOM)
<br />O ITEM MANUFACTURER MODEL NO. DESCRIPTION N0.
<br />REQD
<br />A
<br />B
<br />C
<br />D
<br />E
<br />F
<br />G
<br />H
<br />J
<br />K
<br />L
<br />Bb
<br />N
<br />FILTER (RE:2/SP401)
<br />BACKWASH VALVE
<br />CIRCULATION PUMP
<br />HEATER
<br />PRESSURE GAUGE
<br />THERMOMETER
<br />FLOW METER
<br />CHECK VALVE
<br />CHECK VALVE
<br />2 PORT VALVE (311)
<br />2 PORT VALVE (4")
<br />HYDROTHERAPY JET PUMP
<br />CHLORINATOR
<br />PENTAIR
<br />PENTAIR
<br />PENTAIR
<br />RAYPAK
<br />WIKA
<br />PENTAIR
<br />BLUE WHITE
<br />JANDY
<br />JANDY
<br />SPEARS
<br />SPEARS
<br />PENTAIR
<br />PPG
<br />TR -140C
<br />263080FULLFLO
<br />WFE-6
<br />407A Lo-NOx ASME
<br />113.13 GLYCERINE FILLED
<br />SL1DW
<br />F -30400P
<br />7305
<br />7307
<br />2622-030
<br />2622-040
<br />XFE-20
<br />0
<br />ACCU-TAB 1030
<br />HIGH RATE SAND, SIDE MOUNT
<br />XF BACKWASH VALVE
<br />1.5 HP, 208-230V, 9.6-8,8 AMPS
<br />399,000 BTU NATURAL GAS
<br />60 PSI INFLUENT & EFFLUENT AT SAME HEIGHT
<br />INLINE THERMOMETER
<br />4" 125-500 GPM FLOW RANGE
<br />2"-2%z" CHECK VALVE
<br />2%2"-3" CHECK VALVE
<br />311
<br />, SCH. 40, BALL VALVE
<br />411
<br />, SCH. 40, BALL VALVE
<br />S HP, 208-230V, 22.0/23.0 AMPS
<br />*PROVIDED AND INSTALLED BY ECOLAB.
<br />ACCU-TAB SYSTEM POWERBASE EROSION
<br />FEEDER. REFER TO NOTES THIS SHEET
<br />2
<br />2
<br />2
<br />1
<br />4
<br />1
<br />1
<br />1
<br />2
<br />4
<br />1
<br />1
<br />1
<br />P CHEMICAL CONTROLLER ACU-TROL AK2100 *PROVIDED AND INSTALLED BY ECOLAB 1
<br />Q WATER LEVEL CONTROLLER MILLENIUM LEVELOR K1100 ELECTRONIC WATER LEVELER 1
<br />R VACUUM GAUGE SUPER PRO SPG -06-1008 2" 30# %4" BTM STEEL 2
<br />4
<br />2 8 0 1 Y a U n 9 f i e I d S t,
<br />Ste. 260 Golden, GO 80401
<br />Office: 303-420-7321 Fax: 303-420-7247
<br />�
<br />P
<br />The Association of
<br />Pool & Spa Professionals
<br />PRIEST ENGINEERING// INC
<br />CHANICAL µ ENGINEERS µ ELECfW CAL
<br />GREENWOOD EXECUTIVE PARK, BUILDING 3
<br />64865 .
<br />4865. QUEBEC ST., CENTENNIAL, CO 86111
<br />PN: (303) 773-8773 Fax: (30.3)779-8333
<br />IN SHAPE
<br />IN -SHAPE HEALTH CLUBS
<br />6 SOUTH EL DORADO STREET, SUITE 700
<br />STOCKTON, CA, 95202
<br />POOL SPA
<br />CPS
<br />2801 YOUNGFIELD STREET SUITE 260
<br />GOLDEN, CO 80401
<br />PHONE: 303-420-7321
<br />ARCHITECT
<br />ARCHITECTURE PLUS INC.
<br />4335-B NORTH STAR WAY
<br />MODESTO, CA 95356
<br />PHONE: 209-577-4661
<br />TENANT
<br />IN SHAPE HEALTH CLUBS
<br />6 SOUTH EL DORADO STREET, SUITE 70
<br />STOCKTON, CA 95202
<br />Seal
<br />Project No.
<br />Drawing Title
<br />EQUIPMENT PLUMBING
<br />LAYOUT PLAN AND
<br />SCHEDULE
<br />Date
<br />February 8, 2016
<br />Sheet No.
<br />SP204
<br />
|