My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MORADA
>
4219
>
2300 - Underground Storage Tank Program
>
PR0524617
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2022 12:58:41 PM
Creation date
7/1/2022 10:53:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0524617
PE
2351
FACILITY_ID
FA0016523
FACILITY_NAME
AISLE 1 #2356
STREET_NUMBER
4219
Direction
E
STREET_NAME
MORADA
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12429017
CURRENT_STATUS
01
SITE_LOCATION
4219 E MORADA LN
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: 4219 Morada Ln., Stockton <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> .Car Wash. . . . . . . . . . . . . . . . . . . . . . . . . . . DSL STP . . . . . . . . . . . . <br /> . . . . . . . . . 208 . . . . . . . . . . . . . <br /> . . . . . . . TLS . . . . . . . . . . . . . . 304 . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . 849.4 . . . . . . . . . . . . . . <br /> . . . . . . . Store . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . DSL Fill . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20$ . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 304 O . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 303. . . . . . . . . . . . . . . <br /> . 208 208. . . . . . . . <br /> 4 .& . 3. . . 2. . . &. 1. . . . . . . . . . . . . . . . .VENT <br /> . .91 STP. . . . . . . 208 <br /> . 304 . . . 304. . . . . . . . . 20� . . . . . . . <br /> 304 & <br /> . . . . . . . . . . . . . . . . . . . . . . . . . 8484 . . . . . . . 304 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . .91 Fill . . . . . . . . . . . . <br /> 8 . . . 7 . . 6. . . 208 . . 5. . . . . . . . . 208 . . . . . . . . . . . <br /> .&. &. . 304. . O . <br /> . . . . . . 3. . O . <br /> . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . 303 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . .87 Fill . . . . . . . . . . . . . <br /> 208 <br /> 1.2 .::2& 11 10 . 2&. . 9 . . . . . . . . . 304. . . . . . . . . . . . . . . . <br /> 304 304. . . . . . . . . O <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . ..87.SKP . . . . . . . . . . . . . . <br /> Piping is Estimated Only. • • • • • • • • • • • • • • . . . . . ?08&. . . . . . . . . . . . <br /> 304 <br /> . 8484 . <br /> Date map was drawn: 07/13/2022 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your <br /> Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify <br /> locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular <br /> spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak <br /> detectors; and in-tank liquid level probes(if used for leak detection). In the space provided,note the date this Site Plan <br /> was prepared. Page 1 of 1 05/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.