My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004666
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINNE
>
8482
>
2600 - Land Use Program
>
PA-0400587
>
SU0004666
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 4:22:32 PM
Creation date
7/1/2022 4:29:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004666
PE
2631
FACILITY_NAME
PA-0400587
STREET_NUMBER
8482
Direction
W
STREET_NAME
LINNE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
25321025
ENTERED_DATE
10/21/2004 12:00:00 AM
SITE_LOCATION
8482 W LINNE RD
RECEIVED_DATE
10/18/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Septic Installation Instructions for . <br /> Infiltrator° Pressure Distribution Systems. SYSTEMS INC <br /> Before You Begin... <br /> Mat�riaJ a pr u <br /> x'34 dF"' .P'.+•5r ,i� <br /> El <br /> r qv ..... pressure. <br /> n <br /> "Uriirmm of compacted <br /> lfb <br /> ait z x � i * ' " �� r�tirsq 4f <br /> 16,Q00 <br /> pji �r ..> ✓2"�.�'' i :rpt- ,jr" j71f4�"f�1f� y�L'�t�����.�' d�r 91Y'.'"�i;. �`..�' Sz�`?:n 'rY�hia 3> <br /> r Y <br /> S)K•a a+ µJd°_,,`r 5F r5a <br /> A LasCTf '' �5• r : � 1 <br /> .� ^rfat kd ,� �l�i,N . . �k�r , r r.• ����i <br /> This document is designed to provide septic installation dome for improved distribution. However, the pipe may also <br /> information for Infiltrator chambers In pressure distribu- rest on the trench bottom for easy installation. Call 1-800-221- <br /> tion applications. These systems may only be Installed 4436 for installation information or technical support. <br /> according to state and local regulations. If unsure of the Like conventional systems, the soil and site conditions must <br /> installation requirements for a particular site, contact be approved for installation. Be sure that a thorough site eval- <br /> your state and local regulators. uation has been conducted to determine the proper sizing <br /> In these instructions, the pipe is placed close to the chamber and siting of the system before proceeding with the installation. <br /> Requirements for Excavating and Preparing the Site. <br /> NOTE:As is the case with conventional systems, do not <br /> -istall the system in wet conditions or if the soil is too moist Rake the bottom and sides if smearing has occurred <br /> .✓hich will cause machinery to smear the soil. while excavating. Remove any large stones and other <br /> debris. Do not use the teeth of the bucket to rake the trench <br /> 0 Stake out the location of all trenches. Set the eleva- bottom. <br /> tions of the tank, piping, and trench bottom. <br /> NOTE: Raking to eliminate smearing is not necessary in <br /> © Install sedimentation and erosion control measures. sandy soils. In fine textured soils (silts and clays), avoid <br /> Temporary drainage swales/berms may be installed to walking in the trench to prevent compacting and loss of <br /> protect the site during rainfall events. soil structure. <br /> © Excavate and level the trenches with the proper sepa- © Verify that the trenches are level. <br /> ration. Remove any debris from the trench walls. <br /> Requirements for Installing the System. <br /> �sr 4 facing upward. If specified, drill one downward hole, at the <br /> end of the pipe, so the pipe will drain after each dosing <br /> cycle. <br /> © Run the distribution pipe through the end plate. Verify <br /> that the holes are facing in the correct direction. <br /> '+ Place the first Infiltrator chamber over the pipe. <br /> © Secure the end plate to the chamber by inserting the <br /> tabs on the end plate into the slots on the flange of the <br /> Run the distribution pipe through the end plate and down the chamber. Hold the plate in place and firmly tap it until it <br /> length of the trench. snaps into the locked position. <br /> 8 Insert 2" screws on either side of the inlet opening on <br /> Drill the appropriately-sized hole through the end plate the chamber flange to secure the connection. <br /> ..sing a hole saw or router bit. Closed end plates are used <br /> 0 <br /> at both ends Of the trench. Secure the pressure distribution pipe to the top of the <br /> end of the chamber with a plastic pipe hanger or nylon <br /> © Determine the orifice diameter and spacing from the strap. This is done by sliding the strap up through one of the <br /> designed plan. Drill holes in the pressure distribution pipe holes in the top of the inlet flange, down through the other <br /> hole, and cinching the two ends around the pipe. <br />
The URL can be used to link to this page
Your browser does not support the video tag.