Laserfiche WebLink
Presto, Carol [EHD] <br /> From: les btssc.com <les@btssc.com> <br /> Sent: Thursday, April 21, 2022 4:37 PM <br /> To: Presto, Carol [EHD] <br /> Subject: Fwd: Safeway#0055 Mountain House <br /> CAUTION:This email is originated from outside of the organization. Do not click links or open attachments unless you recognize the <br /> sender and know the content is safe. <br /> Carol see response from S.Bravo Systems below. <br /> I also have requested inspection Tuesday 2/26 <br /> Thank you <br /> Sent from"the" Whone <br /> Begin forwarded message: <br /> From: Don Mukai<dmukai@sbravo.com> <br /> Date: April 21, 2022 at 4:26:32 PM PDT <br /> To: "les btssc.com" <les@btssc.com> <br /> Cc: Keith Pearson<KPearson@sbravo.com>, "construction btssc.com" <br /> <construction@bts sc.com> <br /> Subject: RE: Safeway#0055 Mountain House <br /> Hi Les, <br /> Per our discussion Certified installers may choose continuously test sumps after back filling, <br /> concreting, while leave the UDC's under vacuum or pressure. This practice is a higher level of <br /> test and helps you verify any damage that may occur to the UDC's during the back fill and <br /> concreting process. <br /> Bravo allows for Hydrostatic filling at any time after performing pressure test. Should San <br /> Joaquin may call me to discuss any questions they may have. <br /> Thank You, <br /> Don Mukai P.E. <br /> Vice President, Senior Engineer <br /> S. Bravo Systems, Inc. <br /> 2929 Vail Avenue <br /> Commerce, CA 90040 <br /> T: (323) 888.4133 <br /> F: (323) 888-4123 <br /> Dmukai@sbravo.com <br /> www.sbravo.com <br /> 1 <br />