Laserfiche WebLink
U. vvlll the Drolec-, result in increased noise Cr vibration IeVeic? <br /> ❑YeC y No <br /> Other s'Gurces used.- <br /> 6- Energy/Natural Resources: <br /> a. Will the project use substantial amounts of fuel or energy, require a <br /> substantial increase in demand upon existing sources, or require the <br /> develapment of new sources of energy? <br /> .[Yes .[� No <br /> b. Will the project affect the potential use, extraction, conservation, <br /> or depletion of a natural resource bother than agricultural land)? <br /> Dyes .� No <br /> Other sources used: <br /> ---------- <br /> 7. 1"*g-ara#s: <br /> a. Will the.project create a risk of explosion; release, generate or store <br /> Any hazardous substances; or cause other dangers to public health and <br /> safety? <br /> -❑Yes .� Nob. Are there any known hazardous substances located within 500 feet of <br /> the boundaries of this project, if in an existing or proposed residential <br /> area(this could include.possible groundwater contamination)? <br /> 0ye5 -L� No <br /> c. Will the project result in interference with, or need, for emergency plans? D <br /> ❑"es Z leo <br /> Other sources used: <br /> 2. Utilities and pub is Service: <br /> e. **VVill the project require alteration of, addition to, or the need for new <br /> utility systems (water, sewer, drainage, solid waste), including a <br /> sphere of influence or district boundary change? <br /> 7X Yes ❑ No <br /> b. *'VVill the project result in the need for or the expansion of the following <br /> services: fire and police protection, schools, parks and recreation, <br /> libraries. roads, flood control., solid waste or other_public works <br /> facilities, .public transit, Df governmental services? <br /> Yes 17 No <br /> c. Will the project adversely impact existing recreational/pari; <br /> opportunities or require new.park/recreation opportunities? <br /> ❑Yes ❑ No <br /> Note: I "Yes" answers to these two questions and 9 (b) below will require <br /> additional discussion; but do not necessarily indicate a potentially significant impact. <br /> Other sources used: <br /> 9. -Fran u3or=•ation/�ircuation: <br /> a. Will the proiect generate significant traffic volumes and/or make a <br /> significant contribution to an existing circulation problem (consider <br /> existing LOS on nearby arterials and highways road design access.. <br /> parking, accident potential)? <br /> ;fes >?I No <br /> 48 <br />