Laserfiche WebLink
" CGRS <br /> 4.2 Requirements: <br /> It is required that the following items be completed to be considered fit for service: <br /> 1. Install normal &emergency venting <br /> 4.3 Fit for Service: <br /> Based on the external inspection completed on August 18th, 2022, the tank is considered to be fit for service to <br /> contain the intended product currently stored once the above mentioned requirements are addressed. <br /> 4.4 Inspection Interval: <br /> According to STI SP-001 and AST inspection guidance external inspections may be in 5 years. <br /> Niko Retes STI Inspector AST-6844 <br /> Printed Name of SP-001 Inspector <br /> 09/19/2022 <br /> Signature of SP-001 Inspector Date Certified nretes(aD_cgrs.com <br /> Rudolph Bowman, Jr P.E. , STI Inspector STI AST 40310/API-653 60073 <br /> Printed Name of SP-001/API 653 Quality Review <br /> a{ 09/19/2022 <br /> Signature of SP-001/API Inspector Date Certified bbowman(ab_cgrs.com <br /> 6 <br />