Laserfiche WebLink
Underground Storage Tank <br />Overfill Prevention Equipment Inspection Report <br />B. OVERFILL PREVENTION EQUIPMENT DETAILS <br />Tank ID (one OPE per column) <br />Diesel <br />F1 Yes <br />® Yes <br />® Yes <br />M Yes <br />Are both vent and tank riser piping <br />secondarily contained? <br />® No <br />r] No <br />Ej No <br />® No <br />OPE Model C)-P'a <br />71SO <br />What is the OPE response when <br />El Shut off <br />Shut off <br />M Shut off <br />E] Shut off <br />activated? <br />Flow <br />Flow <br />Flow <br />Flow <br />(Check all that apply.) <br />® Restricts <br />MRestricts <br />® Restricts <br />[j Restricts <br />Flow <br />Flow <br />Flow <br />Flow <br />® Audible <br />El Audible <br />Fn Audible <br />M Audible <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />Visual <br />® Visual <br />® Visual <br />® Visual <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />Are flow restrictors installed on vent piping <br />Yes* <br />® Yes* <br />Yes* <br />® Yes* <br />that may interfere with the OPE operation? <br />F1 No <br />® No <br />® No <br />® No <br />At what level in the tank is the OPE set to <br />100.75 <br />activate? Inches from bottom of tank <br />What is the percent capacity of the tank at <br />93.5% <br />which the OPE activates? <br />Is the OPE in proper operating condition to <br />E] Yes <br />117 Yes* <br />® Yes* <br />® Yes* <br />respond when the stored substance <br />F No <br />rl No <br />rl No <br />® No <br />reaches the designated regulatory level? <br />7. SUMMARY OF TESTING RESULTS <br />Pass <br />El Pass ® Pass <br />® <br />Pass <br />OPE Inspection Results <br />Fail <br />Fail Fail <br />® <br />Fail <br />8. COMMENTS <br />Describe all answers marked "No" or "Fail" and proposed remedy. <br />List all monitoring equipment either replaced or repaired. <br />Inspection completed SR0085482 <br />* Mark here if: <br />® Flow restrictors interfere with overfill prevention and equipment repairs required. <br />Additional copies of this page may be attached. <br />Attach tank chart(s), measurements, calculations, and In -Tank Setup report(s) <br />Page 2 of 2 <br />