My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 6:03:07 PM
Creation date
7/18/2022 8:43:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
UNFI GROCERS DISTRIBUTION, INC (STOCKTON)
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tanknology Testing and Inspection Certificate <br />Tanknology Inc. <br />11000 North MoPac Expressway, Suite 500, Austin, TX 78759 <br />800-800-4633 www.tanknology.com Page 1 of 1 <br />Test Date 11/8/2021 Tanknology WO# NW1-2353287 <br />Test Purpose COMPLIANCE Customer PO# <br />Customer Location <br />UNFI Stockton (32411) <br />11840 VALLEY VIEW ROAD 1990 Piccoli Road <br />EDEN PRAIRIE, MN 55344 Stockton, CA 95215 <br />Attn: KATHLEEN ENGELKE Attn: <br />(952) 828-4773 Q <br />Date <br />Test/ Inspection Description <br />Item Tested <br />Result <br />Tested <br />Precision Line Tightness (.1 GPH) <br />Tank T1 dsl Line 1 Diesel <br />11/8/2021 <br />Pass <br />Precision Line Tightness (.1 GPH) <br />Tank T1 dsl Line 2 Diesel <br />11/8/2021 <br />Pass <br />Line Leak Detector (3 GPH) <br />Tank T1 dsl Line 1 Diesel <br />11/8/2021 <br />Pass <br />Line Leak Detector (3 GPH) <br />Tank T1 dsl Line 2 Diesel <br />11/8/2021 <br />Pass <br />Impact Valve Inspection <br />See test report for details <br />11/8/2021 <br />Pass <br />CA ATG FORM <br />See test report for details <br />11/8/2021 <br />Pass <br />CA Spill Bucket <br />See test report for details <br />11/8/2021 <br />Pass <br />Spill Containment/ Bucket <br />Dsl SB 1 - Fill - Direct <br />11/8/2021 <br />Pass <br />CA Overfill Prevention Equipment Inspection Report <br />Dsl 2 Diesel <br />11/8/2021 <br />Pass <br />Overfill Insp OPW Flapper Valve <br />Dsl Diesel <br />11/8/2021 <br />Pass <br />Sump Inspection <br />See test report for details <br />11/8/2021 <br />Pass <br />Tanknology Representative: Rosa Ortiz Technician: Brent Bowen <br />Telephone: Technician Certification: (See forms) <br />
The URL can be used to link to this page
Your browser does not support the video tag.