My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 6:03:07 PM
Creation date
7/18/2022 8:43:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
UNFI GROCERS DISTRIBUTION, INC (STOCKTON)
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iapemaafu:e �. <br />{ '� I<urtawl <br />Seem <br />Figural <br />SMP a' NT INE UPPER p NYE <br />Attach tM supplied band clamp In the upper tubejug <br />Wiese the ma M a nd am ing that it is astemblad spume <br />to the tube. The clampcansee used asaglideNor mak- <br />ing a square wt If Jae Is used clamp on the valve <br />body raalrg only to avoid damage to the flour and <br />[Maes lSw Hipme W. Gelidly saw, In mug the hi <br />squarelyr at the mark made In Step T. Use a hacksaw <br />will, a new fiF tooth blade. Folding Me upper tube <br />as thea ing progresses will her nnote Ian out ah em <br />sure squares degree M. Remove the bah clamp <br />Act tube is cut <br />CAIRIdx-W PONT sees a pipe or miles coastal ad <br />tM upgrdrop4abe, this maydamage tM Wb4 <br />upbg It m be out all round tlerely pruhdlitvg <br />asaxslly ofeM onR <br />J' o Iw <br />F09UMSS <br />IMPoYTAIIT:Rerrhave all dips and shavings genes <br />atedinsteps3thm5nutoftlw enddoe;t e W <br />NOT remove chips and shavkgs by damages dim valve <br />body. <br />STEP I: idE THE UPPFRORtII NYE <br />File the upper tube square, and ramove any burrs or <br />rough edger Make sure the vet is flat and square. <br />IMYUIQANT. Ca ref uIly file a good cla mfe: on the <br />Inside edge d the Map lie to provide a 1w nforth <br />potypak seal and inlet mleimta11az1 M Step 8. <br />REuna <br />STEPS: SA1NGTNEU1aPEA1XO[dNW3E <br />Sand the Imake of the III top babe with sandpaper and/or <br />Leel wool to remove all burrs ah "Wedges After <br />sinal ng wase down the Inde d the tube wash a dean <br />rag now, Me wp to approximately a insight down to <br />remove any d doll <br />Sautlgp: Fa mWppparlyd:amfar,w aM <br />c W n that drop ti may ort she seal aM reauN in a <br />Bllun M a praise aro deny auk taw. <br />Flpun5 <br />t- <br />
The URL can be used to link to this page
Your browser does not support the video tag.