My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 6:03:07 PM
Creation date
7/18/2022 8:43:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
UNFI GROCERS DISTRIBUTION, INC (STOCKTON)
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Test <br />Duration <br />Test Pressure <br />P/F Threshold <br />Tank Annular - Vacuum <br />1 hr, 20k or less tank <br />10" hg <br />0 loss, int dry before and after test <br />Tank Annular - Vacuum <br />2 hr, >20k tank <br />10" hg <br />0 loss, int dry before and after test <br />Line Annular - Pressure <br />1 hr <br />5 psi <br />0 loss <br />less than 1/8" over hour, settle time <br />4" above highest penetration <br />of 15 minutes minimum prior to <br />STP Sump - Hydro <br />1 hr <br />or sidewall seam <br />starting the test <br />less than 1/8" over hour, settle time <br />4" above highest penetration <br />of 15 minutes minimum prior to <br />UDC Sump - Hydro <br />1 hr <br />or sidewall seam <br />starting the test <br />no greater than 4" we vaccum decay <br />Spill Bucket - SW Vac <br />1 min <br />30" we <br />bucket must be dry <br />less than 1/8" over hour, settle time <br />within 1.5" of top of the <br />of 5 minutest minimum prior to <br />Spill Bucket - SW Hydro <br />1 hr <br />bucket <br />starting the test <br />no greater than 3" we vaccum decay <br />Spill Bucket - DW Vac <br />1 min <br />15" we <br />int must be dry <br />
The URL can be used to link to this page
Your browser does not support the video tag.