My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2285
>
2300 - Underground Storage Tank Program
>
PR0231111
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2023 10:43:15 AM
Creation date
7/19/2022 8:58:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231111
PE
2361
FACILITY_ID
FA0001659
FACILITY_NAME
QUIK STOP MARKET #039
STREET_NUMBER
2285
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
141-214-03
CURRENT_STATUS
01
SITE_LOCATION
2285 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by © Manufacturer Q Industry Standard El Professional Engineer <br /> Test Type © Pressure Q Vacuum E Hydrostatic <br /> Test Equipment Used: TS-STS <br /> Sump/UDC ID 87 STP 91 STP 1-2 UDC 3-4 UDC <br /> Sump Manufacturer Unknown (FRP) Unknown (FRP) Bravo (FRP) Bravo (FRP) <br /> Sump Depth (inches) 64 66 30 30 <br /> Sump Bottom to Top of 21 22 11 11 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 11:45 11:45 1:46 1:46 <br /> Initial Reading 3.6284 4.7675 1.8364 7.5845 <br /> Test End Time 12:01 12:01 2:01 2:01 <br /> Final Reading 3.6273 4.7668 1.8366 7.5839 <br /> Change in Reading -0.0011 -0.0007 0.0002 -0.0006 <br /> Pass Fail Criteria +/-0.002 +/-0.002 +/- 0.002 +/- 0.002 <br /> Tightness Test Results El Pass rl Fail © Pass rl Fail © Pass © Fail © Pass El Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass Fail Criteria <br /> Tightness Test Results R7 Pass 0 Fail 0 Pass El Fail 0 Pass [rj Fail I! Pass Ll Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.