Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by © Manufacturer Q Industry Standard El Professional Engineer <br /> Test Type © Pressure Q Vacuum E Hydrostatic <br /> Test Equipment Used: TS-STS <br /> Sump/UDC ID 87 STP 91 STP 1-2 UDC 3-4 UDC <br /> Sump Manufacturer Unknown (FRP) Unknown (FRP) Bravo (FRP) Bravo (FRP) <br /> Sump Depth (inches) 64 66 30 30 <br /> Sump Bottom to Top of 21 22 11 11 <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 11:45 11:45 1:46 1:46 <br /> Initial Reading 3.6284 4.7675 1.8364 7.5845 <br /> Test End Time 12:01 12:01 2:01 2:01 <br /> Final Reading 3.6273 4.7668 1.8366 7.5839 <br /> Change in Reading -0.0011 -0.0007 0.0002 -0.0006 <br /> Pass Fail Criteria +/-0.002 +/-0.002 +/- 0.002 +/- 0.002 <br /> Tightness Test Results El Pass rl Fail © Pass rl Fail © Pass © Fail © Pass El Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass Fail Criteria <br /> Tightness Test Results R7 Pass 0 Fail 0 Pass El Fail 0 Pass [rj Fail I! Pass Ll Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3of5 <br />