Laserfiche WebLink
I tried to call yesterday at the city and left a voicemail but I think everyone might be working from home again. Just <br /> wanted to inquire about what all of the associated fees for a Site Approval Application and Submittal would be? We <br /> have an existing self-storage facility that we are adding square footage to on site, and we've been in contact with the <br /> city to go through a Site Approval submittal. I've included a pdf of our submittal sheets if this helps. <br /> Also, I found the attached fees on your website, and located this area below for"Site Approval" applications: <br /> 20 SifeApproval <br /> a. General-with full public services(sewer,water,and storm drainage) S 3,492.00 <br /> General-with full public services (sewer.water,and storm drainago)-in addition to <br /> b. another applicabon S 1,774.00 <br /> C. General-without full public services sewer,water,and storm drainage) S 3,808.00 <br /> General-without full public services(seder.water, and storm drainage)-6n <br /> d. addition to another a plication S 1,929.04 <br /> I'd just like some clarification on which one of these applies as well as if there are any additional fees we should be <br /> aware of and ready for since there usually are some. <br /> Thanks for your help! <br /> Yasser Mohamed I Project Manager <br /> Mag2llan <br /> 10540 Talberi Ave., Suite 175 <br /> Fountain Valley, CA 92708-6027 <br /> Tel: (949) 515-9600 <br /> Mobile: (358) 668-8469 <br /> www.magellanarchitects.com <br /> `J4 Think before printing-keep the planet VERDE <br /> 5 <br />