Laserfiche WebLink
S r C O G, Inc. <br /> 555 East Weber Avenue ■ Stockton,CA 95242 + (249)23546500 • FAX[209)2335-0438 <br /> San joagtviii County Multi-Species Habitat Conservation &Open Sprue Plan (SJMSCP) <br /> SJMSCP RESPONSE TO LOCAL JURISDICTION(RTLJ) <br /> ADVISORY AGENCY NOTICE TO SJCOG,Inc. <br /> To: Giuseppe Sanfilippo,San Joaquin County,Community Development Department <br /> From: Laurel Boyd, SJCOG, Inc. Phone: (209)235-0574 Email. boyd@sjcog.org <br /> Dale: November 7,2023 <br /> Local Jurisdiction Project Title: PA-2200136(A) <br /> Assessor Parcel Number(s): 051-310-49,-50 <br /> Local Jurisdiction Project Number: PA-2200136(A) <br /> Total Acres to be converted from Open Space Use: Unknown <br /> Habitat Types to be Disturbed: Natural Habitat Land <br /> Species Impact Findings: Findings to be determined by SJMSCP biologist. <br /> Dear Mr. Sanfilippo: <br /> SJCOG, Inc. has reviewed the project referral for PA-2200136 (AA). This project consists of an Administrative Use Permit <br /> application to expand an existing 89,600 square foot personal storage facility in 2 phases over 5 years. Phase 1, with <br /> permits issued within 35 months, includes the construction of a 24,300 square foot storage building. The construction of <br /> the Phase 1 building includes utilization of Development Title Section 9-445.0760 (a)(2) for the 100% linear expansion of a <br /> building with a non-conforming setback. Phase 2, with permits issued within 5 years, includes the construction of 2 <br /> buildings totaling 33,404 square feet. The expansion will include the development of 3 new storage buildings totaling <br /> 57,700 square feet. The parcel is served by Lockeford CSD for water and sewer, and CSA 52 for storm drainage. The <br /> project site is on the north side of E. Blossom Court, west of N. State Route 88, Lockeford (APWAddress: 051-310- <br /> 50112887 E. Blossom Court, Lockeford). <br /> San Joaquin County is a signatory to San Joaquin County Multi-Species Habitat Conservation and Open Space Plan <br /> (SJMSCP). Participation in the SJMSCP satisfies requirements of both the state and federal endangered species acts, <br /> and ensures that the impacts are mitigated below a level of significance In compliance with the California Environmental <br /> Quality Act (CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br /> Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the <br /> SJMSCP. Although participation in the SJMSCP is voluntary, Local Jurisdiction/Lead Agencies should be aware that if <br /> project applicants choose against participating in the SJMSCP, they will be required to provide alternative mitigation in an <br /> amount and kind equal to that provided in the SJMSCP. <br /> This Project is subject to the SJMSCP. This can be up to a 30 day process and it is recommended that the project <br /> applicant contact SJMSCP staff as early as possible. It is also recommended that the project applicant obtain an <br /> information package. htto:l/wwwstcoaorci <br /> Please contact SJMSCP staff regarding completing the following steps to satisfy SJMSCP requirements: <br /> ■ Schedule a SJMSCP Biologist to perform a pre-construction survey prior to any ground disturbance <br /> • SJMSCP Incidental take Minimization Measures and mitigation requirement: <br /> I. lncidcntal Take Minimization Measures(171A Ms)will be issued to the project and roust be signed by the project applicant prior to ar7_v <br /> ground disturbance but no later than six(6)months from receipt of the ITMMs. If 1TNilvls are not signed ivtthln six months,the applicant <br /> mrst reapply far SJMSCP Coverage Upon receipt of signed ITMMs from project applicant,51COG,Inc.staff will sign the ITMMs. This <br /> is the effecti ve date of the[TM Ms. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the IT1v1Ms. <br /> 3. Upon issuance of filly executed ITMMs and prior to any ground doturh€mce,tLe project applicant must: <br /> a, Post a bond for payment of the applicable SJMSCP fee covering the entirety of the proint acreage being covered(the band <br /> siwuld be valid for no longer than a 6 menth perindl,or <br /> b. Pay(lie apprapriate SIMSCP tee for the entirety of the project acreage being covered.or <br /> C Dedicate land in-lieu offees,eitheras❑anservation eaMnentsor fee title,or <br />