My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015055
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BLOSSOM
>
12887
>
2600 - Land Use Program
>
PA-2200136
>
SU0015055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 10:12:52 AM
Creation date
7/22/2022 9:25:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015055
PE
2632
FACILITY_NAME
PA-2200136
STREET_NUMBER
12887
Direction
E
STREET_NAME
BLOSSOM
STREET_TYPE
CT
City
LOCKEFORD
Zip
95237-
APN
05131049, -50
ENTERED_DATE
7/21/2022 12:00:00 AM
SITE_LOCATION
12887 E BLOSSOM CT
RECEIVED_DATE
11/3/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MItiP-ation Monitovin8 Repprtil Na -PA-2200136 ISAJ November Y,2073 <br /> Agency for Monitoring and Reporting <br /> Impact M-i atian MeasurelCondition Type of Review Compliance Action Indicating Compliance or Review Verification of Compliance orArraual ReviawofCvnditipns <br /> Monitoring Rego lall Date Remarks <br /> III.Air Ctuallty Construction and N San Joaquin Valley Air Pollution Control District For eachproject phase,wlthln 3D-days of Issuance of the <br /> Operation-NA mpt from first certificate of occupancy,if applicabll submit to the <br /> Off-site Fee District a summary report of the construction start,and <br /> end dates,and the date of issuance ofthe first certificate <br /> of occupancy.Otherwise,submit to the District a summary report of the <br /> Construction start and end dates within 30-days of the end of each phase of <br /> c6nstruCtlon. <br /> ill.Air Quality Cor-strucrinn and X San Joaquin Valley Air Pollution Control District For each project phase,all racords shall be maintained <br /> Operatic,-11--dk—laing on site during construction and for a period of tenyears <br /> followingeithar the and of con,structian ortha issuance <br /> of the Prstcertificace of occupancy,whichever is later. <br /> Records shall ba made <br /> available for District <br /> Inspeetinn upon request. <br /> III-Air quallty Construction and x San Joaquin Valley Air Pollution Control District For each project phase,maintain records of(1)the <br /> Operational Dates construction start and end dates and(2)the date of <br /> issuance ofthe first certificate of occupancy,if applicable <br /> II.Air Quality Improve Destination Accessibility % San Joaquin Valley Air Pollution Control District 6.7 mlles(dlstance to downtown orjob center <br /> III_Air Quality Improve Pedestrain Network X San Joaquin Valley Air Pollution Control District Project site within a Ruial sntti ng <br /> III.Air Quality Implement Er lyee Parkdng"Cash % 5an.Joaquin Valley Air Pollution Control District 1%Employees to receive"cash-out" <br /> taut" <br /> IV.0loloi lResources Participation in the SIMI X San Joaquin Council of Governments The developer shall apply to the San Joaquin Council of Governments <br /> (SJCPGj for coverage under the San Joaquin County Multi-Species Open <br /> Space and Habitat Conservation Plan ISIMSCP).The mject site shag hp <br /> inspected by the SJMSCP biologist,who will recommend which Incidental <br /> Take Minimization Measures set-forth inthe SJMSCP should he applied to <br /> the project and implemented The project applicant shall pay the re:qulrpd <br /> SJMSCP fee, if any, and be respcnslbe for the implementation of the <br /> specified Incidental Take Minimisation Measures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.