Laserfiche WebLink
TRACY <br /> Construction Waste Management (CWM) Plan <br /> Project Name:tntenor Remodel 450 11th Street.Tracy,CA <br /> Permit#: <br /> Project Manager: Ak3L_ <br /> Waste Hauling inpa ty: bn�p AM— <br /> Contact <br /> Contact Name: ..zj 'J <br /> All Subcontractors shall comply with the project's Construction Waste Management Plan. <br /> All Subcontractor foremen shall sign the CWM Plan Acknowledgment Sheet. <br /> Subcontractors who fail to comply with the Waste Management Plan will be subject to backcharges or withholding of payment.as deemed <br /> appropriate.For instance.Subcontractors who contaminate debris boxes that have been designated for a single material type will be subject to <br /> backoharee or withheld payment.as deemed appropriate. <br /> I. The project's overall rate of waste diversion will bcq_Q)%. <br /> 3. This project shall generate the least amount of waste possible by planning and ordering carefully, following all proper storage and <br /> handling procedures to reduce broken and damaged materials and reusing materials whenever possible.The majority of the waste that <br /> is generated on this jobsite will be diverted from the landfill and recycled for other use. <br /> 3. Spreadsheet I,enclosed,identifies the waste materials that will be generated on this project.the diversion strategy for each waste type <br /> and the anticipated diversion rate. <br /> 4. Waste prevention and recycling activities will he discussed at the beginning of weekly subcontractor meetings.As each new subcon- <br /> tractor comes on-site,the WMP Coordinator will present him/her with a copy of the CWM Plan and provide a tour of the jobsite to <br /> identify materials to be salvaged and the procedures for handling jobsite debris.All Subcontractor foremen will acknowledge in writ- <br /> ing that they have read and will abide by the CWM Plan.Subcontractor Acknowledgment Sheet enclosed.The CWM Plan will be <br /> posted at the jobsite trailer. <br /> 5. Salvage:Excess materials that cannot he used in the project.nor returned to the vendor,will be offered to site workers,the owner.or <br /> 6. "nate ch 'ty if feasible. <br /> will-Drovide a omming dro b at the jobsite for most of the construction waste.These commingled <br /> drop boxes will be taken to�St t M fa 1 The average diversion rate for commingled waste will be_r7r,. <br /> As site conditions permit,addtuonal op bo will be used fodparticular phases of construction(e.g.,concrete and wood waste)to <br /> ensure the highest waste diversion rate possible. <br /> 7. In the event that the waste diversion rate achievable via the strategy described in (6)above, is projected to be lower than what is <br /> required,then a strategy of source-separated waste diversion and/or waste stream reduction will be implemented.Source <br /> separated waste refers to jobsite waste that is not commingled but is instead allocated to a debris box designated for a <br /> single material type,such as clean wood or metal. <br /> Notes: <br /> 1, Waste stream reduction refers to efforts taken by the builder to reduce the amount of waste generated by the project to below <br /> four(4)pounds per square foot of building area. <br /> ?. When using waste stream reduction measures.the gross weight of the product is subtracted from a base weight of four(4) <br /> pounds per square foot of building area.This reduction is considered additional diversion and can be used in the waste reduc- <br /> ff_ u n reenntagge�cal,.culations. <br /> H.` LV)t( .k LO ill track and calculate the quantity(in tons)of all waste leaving the project and calculate the waste diver- <br /> sion rate for the project. will provide Project Managfr with an updated monthly report on gross weight <br /> hauled and the waste diversion rate being achieved on the project. ],t- monthly report will track separateh the <br /> gross weights and diversion rates for commingled debris and for each source-separated waste stream leaving the olect.In the event <br /> that does not service any or all of the debris boxes on the project,the 1�trltr�t' -o r will work <br /> with the responsible parties to track the material type and weight(in tons)in such debris boxes in order to determine waste diversion <br /> rates for these materials. <br /> 9. In the event that Subcontractors furnish their own debris boxes as=r scope of work, such Subcontractors shall not be <br /> excluded from complying with the CWM Plan and will provide weight and waste diversion data for their <br /> debris boxes. <br /> 10. In the event that site use constraints(such as limited space)restrict the number of debris boxes that can be used for collection of des- <br /> ignated waste the project Superintendent will,as deemed appropriate,allocate specific areas onsite where individual material types <br /> are to be consolidated.These collection points are not to be contaminated with non-designated waste types. <br /> 11. Debris from jobsite office and meeting rooms will be collected by r + <br /> will.at a minimum,recycle office paper,plastic,metal and cardboard. <br /> W:IBt ldingkBudding FormslGreen Codes Forms <br />