Laserfiche WebLink
-2- <br /> PA-2200134 (SA) <br /> 4) The Regional Transportation Impact Fee shall be required for any incremental traffic <br /> resulting from this application. The fee is due and payable at the time of building permit <br /> application. The fee will be based on the current schedule at the time of payment. <br /> (Resolution R-06-38) <br /> 5) The Water Supply Facilities Impact Mitigation Fee shall be required for this development. <br /> The fee is due and payable prior to issuance of the building permit. The fee will be based <br /> on the current schedule at the time of payment. (Development Title Section 9-818.4 and <br /> Resolutions R-91-327, R-94-185 and R-97-5) <br /> 6) A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 7) The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six (6) foot high chain link <br /> fence or equal when the maximum design depth is 18 inches or more. Required retention <br /> basin capacity shall be calculated and submitted along with a drainage plan for review and <br /> approval, prior to release of building permit. (Development Title Section 9-1135) <br /> 8) This project is subject to the NPDES Region-Wide Permit requirements and shall comply <br /> with the following conditions. Prior to release of the building permit, plans and calculations <br /> shall be submitted and approved by the Public Works Department—Water Resources <br /> Division (209-468-3605): <br /> a) Treatment: A registered professional engineer shall design the site to treat the 85th <br /> percentile storm as defined in the County's 2021 Storm Water Quality Control <br /> Criteria Plan (SWQCCP). <br /> b) Hydromodification: A registered professional engineer shall design the site to comply <br /> with the volume reduction requirement outlined in the County's 2021 SWQCCP. <br /> c) Trash: A registered professional engineer shall design the site to comply with the <br /> trash control requirement outlined in the County's 2021 SWQCCP. <br /> 9) Prior to release of the building permit, the owner shall enter into an agreement with San <br /> Joaquin County for post-construction maintenance of stormwater quality facilities. <br /> 10) Prior to release of the building permit the applicant shall submit the Storm Water Pollution <br /> Prevention Plan (SWPPP) to Public Works. A copy of the approved SWPPP and all <br /> required records, updates, test results and inspection reports shall be maintained on the <br /> construction site and be available for review upon request. <br /> 11) Applicant shall file a Notice of Intent(NOI) with the State Water Resources Control Board <br /> (SWRCB) and comply with the State "General Permit for Storm Water Discharges <br /> Associated with Construction Activity". The Waste Discharge Identification Number <br /> (WDID), issued by SWRCB, shall be submitted to Public Works prior to release of the <br /> building permit. Contact the SWRCB at (916) 341-5537 for further information. <br /> CH:DS <br />