Laserfiche WebLink
33 <br /> 1 <br /> y <br /> APPENDIX E CContinued horn: P age 45r <br /> [iVSTACLING fA1K5 (Seesections 5 and 7) �' TANK # 1 . TANK #2 TANK #3 vv <br /> Record tank diameter measurement # 1 ( before installation ) f/ <br /> Record final backfill bedding depth undertank—inches or centimeters `r <br /> Record final tank spacing between tanks—inches or centimeters36 <br /> W Record final tank spacing from tank endcap to excavation walls- si , r ` r <br /> inches or centimeters ,36 <br /> If applicable , deadmen used -factory-supplied or other ivl� � <br /> If applicable, anchoring hardware-factory-supplied or other <br /> Record diameter measurement #2 ( after straps are installed ) lei <br /> Subtract diameter measurement #2 from # 1 and record <br /> Deflection measurement meets Table 1 - 6 requirements-yes or no Yk ,E <br /> Voids under tank between ribs and under domes filled with backfill <br /> and tamped -yes or no J <br /> Backfill placement and compaction meet requirements-yes or no i '40 S ,� <br /> Piping connections meet requirements-yes or no <br /> Fittings and other metal components are coated for corrosion <br /> protection - yes or no <br /> Record diameter measurement #3 ( after backfilling to top of tank is <br /> complete) <br /> Subtract diameter measurement #3 from # 1 and record <br /> Deflection measurement meets Table 1 -6 requirements-yes or no <br /> Tank was ballasted prior to bringing backfill to top of tank-yes or no 'Alo <br /> After backfilling is brought to top of tank (See sections 5, 6 and 8) <br /> Tank was ballasted after bringing backfill to top of tank-yes or noV jr <br /> � <br /> Postinstallation tests were conducted for pressure-testable tanks- <br /> yes or no / � Y � .� <br /> If applicable, optional hydrostatic test was performed-yes or no Jy/ <br /> If applicable, containment sump test was successful -yes or no fle 25 <br /> Record final depth of backfill over tank-give in inches or centimeters 66 <br /> Record diameter measurement #4 ( after backfilling is brought to // W6 <br /> subgrade ) <br /> Subract diameter measurement #4 from # 1 and record Ly <br /> Final deflection measurement meets requirements of Table 1-6 <br /> yes or no �/ y <br /> If applicable, type of surface pad used-concrete or asphalt e aelfl <br /> If applicable, thickness of surface pad used -give in inches or <br /> centimeters and note which type <br /> If applicable, record monitoring fluid level when backfilling & top slab , f ® e ✓/ <br /> installation are complete <br /> r � < <br />