My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1700
>
2300 - Underground Storage Tank Program
>
PR0231454
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 11:27:54 AM
Creation date
8/5/2022 10:02:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231454
PE
2361
FACILITY_ID
FA0003796
FACILITY_NAME
Manteca Valero
STREET_NUMBER
1700
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22802002
CURRENT_STATUS
01
SITE_LOCATION
1700 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer Z Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure WI Vacuum ❑ Hydrostatic <br /> Test Equipment Used: <br /> Tank ID 87 91 <br /> Tank Manufacturer Unknown Unknown <br /> Tank Capacity 12,023 12,023 <br /> Test Start Time 11:30 Am !1:30 <br /> Initial Reading -10 PSI -10 PSI <br /> Test End Time 12:30 PM 12:30 PM <br /> Final Reading -10 PSI -10 PSI <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria 0 0 <br /> Tightness Test Results ® Pass ❑ Fail Z Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer Z Industry Standard ❑ Professional Engineer <br /> Test Type Z Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: <br /> Pipe Run ID 87 91 <br /> Pipe Manufacturer Smith Smith <br /> Test Start Time 12:30 PM 12:30 PM <br /> Initial Reading 5PS1 5PS1 <br /> Test End Time 1:30 PM 1:30 PM <br /> Final Reading 5PS1 5PS1 <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria 0 0 <br /> Tightness Test Results Pass ❑ Fail Z Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results Ll Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.