Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: MARK'S FOOD&FUEL 880 E VICTOR RD LODI,CA <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> *PIPING* . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Drawing ofpiping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> exit of sump and . . . . . . . . . . . X . . . X . . . . . . . . . . . . . . . . . . . . . . <br /> underground <br /> drawing is DSL, <br /> . . <br /> accurate,we <br /> cannot speculate <br /> 1bl^rue"ints. 4. . . . . . . . . . . . . . . . . T X <br /> X X <br /> 1. 3 . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _ <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _ <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 91 87 <br /> O O <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . O F <br /> OO . . . . . . . . . . . V/R <br /> . . . . . . . . . . O O . . . . . . . . . . . <br /> . . . . . . . . . T X <br /> . . . . . . . . . T X . . . . . . . . . . . <br /> KEY . . . . . . . . . . . . . . . <br /> A=ANNULAR Sensor . . . . . . . . . . . . . . <br /> F=FILLS . . . . . . . . . . . . . . <br /> V=VAPOR <br /> P=PROBE _9egE rran�rrrefargrrnax2r3rtx ars red SriSi'a ra riu cer1y(iareg reclaere+ax cre n <br /> L=Turbine/Leak Detector {.rgfe:siorzrloprfrmeor ¢rzfwe sde ,l6orrr�6oinurwral prrrpns�.Ehrrr <br /> X=SUMP SENSOR nar ra sccde <br /> B=Brine Sensor <br /> S=Smart Sensor <br /> C=Floats&Chains <br /> E=E Stop Date map was drawn:9/29/20 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br /> Page 6 of 6 <br />