Laserfiche WebLink
c <br /> CGRS <br /> SOLUTIONS DELIVERED <br /> GENERAL CONTRACTOR STATEMENT <br /> Effective 05/26/15,the State Water Resources Control Board requires that the signed general <br /> contractor's statement be received from all general contractors prior to formal notification of final <br /> ELD testing (NO EXCEPTIONS). <br /> By signing below,the general contractor acknowledges that: <br /> "No further ground penetrating work,including beautification requirements,atop or immediately <br /> adjacent to,the UST system are needed or will be performed after ELD testing is performed." <br /> General Contractor Information <br /> Company Name/CA Contractor License#: Wilkeys Construction <br /> Contact: Dale Adams <br /> Address: 4557 Sky Way Drive, Olivehurst, CA 95961 <br /> Telephone/Email: 530-210-4111/dale@wilkeysconstruction.com <br /> Site Information <br /> Site Name: 7-11#41531 <br /> Address: 3379 N.Tracy Blvd., Tracy, CA 95376 <br /> Telephone: unknown <br /> County: San Joaquin <br /> CUPA Contact: San Joaquin County Environmental Health <br /> CUPA Email: ust@sjgov.org <br /> Testing Company Information <br /> Name: CGRS, Inc. <br /> Technician Assigned/License#: Sergio L. Nunez/#06-1727 <br /> Signature <br /> General Contractor's Signature: <br /> Name(print): Mark D. Wilkey <br /> Title: President Date of Signature: 11512023 <br /> 5444 Dry Creek Rd. Sacramento,CA 95838 T 916-991-1100 F 916-991-1177 www,cgrs.com <br />