My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2002-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23201
>
4400 - Solid Waste Program
>
PR0504223
>
CORRESPONDENCE_2002-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2024 12:08:14 PM
Creation date
8/24/2022 10:08:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2002-2010
RECORD_ID
PR0504223
PE
4430
FACILITY_ID
FA0006129
FACILITY_NAME
BILL LANE DUMP
STREET_NUMBER
23201
Direction
S
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
ESCALON
Zip
95320
APN
249-060-14
CURRENT_STATUS
01
SITE_LOCATION
23201 S SANTA FE RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Account Statement <br /> Pacific Gas and <br /> Electric Company <br /> MLX Contact: PO Box 488 <br /> MLX Oakdale CA 95361 <br /> 77 BEALE, ROOM 580-135D <br /> P.O.BOX 770000 1-(209)726-6322 <br /> SAN FRANCISCO, CA 94177 <br /> MAIN LINE EXTENSION <br /> Prb ect 23021 SANTA FE RD, RIVERBANK, STANISLAUS ,MLS'Acccsttnt` <br /> Street 23021 SANTA FE RD 0150474 <br /> C' ESCALON <br /> C�stotner PETER PALOMINO <br /> ........................................................... <br /> ........................................................ <br /> 1 ::Stafement Date 11/13/2006 <br /> 2 !Gofttmodf Electric <br /> 1.1..:Date Eiead :for.SeNice 01/14/2004 <br /> ...............................: .......:............... <br /> ........................................................ <br /> R Def.....R . B.....tt' <br /> 5` bitofof oWhigrsht .Date : 02/14/2005 <br /> :Contract Ex ltatttt>Dete' 01/14/2014 <br /> Ori tnal Comtract..Ainounts; MLX Account.Status <br /> 7.Customer Advance 0.00 10. Customer Refundable Balance 79.49 <br /> 8.Total Allowances 86.62 11. Unpaid Deficiency Bills 0.00 <br /> 9.Credit for Applicant Performed Work 0.00 12.Accumulated Cost of Ownership 6.93 <br /> 1. Statement Date-Date statement was prepared for mail delivery. <br /> 2. Commodity-The type of utility service provided Gas/Electric. <br /> 3. Date Ready for Service(DRS)-The electric disbribution system is first energized or the gas distribution system is first pressurized, <br /> 4. Deficiency Billing Date-The date the allowance,originally given on your contract,must be justified. This is 6 months <br /> from the DRS(see#3 above)for Residential contracts and annually from DRS,for 3 years for Non-Residential contracts. <br /> 5. Cost Of Ownership Date-PG&E begins calculating and accumulating monthly Cost of Ownership charges on the remaining <br /> unrefunded advance after 12 months,from the Date Ready for Service,for Electric and 36 months,from Date Ready for Service, <br /> for Gas.Cost of Ownership does not apply to individual residential applicants or an extension of less than 5 residential meters. <br /> (Electric Rule 15,Section J and Gas Rule 15 Section 1). <br /> 6. Contract Expiration Date-The date the contract is scheduled to terminate. <br /> 7. Customer Advance-The Customer Advance is subject to refund if the 10-yr Refundable Option was chosen on your contract. <br /> (See page 2 of the Declarations). Your Customer Advance can be located on page 2 of your Electric and or Gas Cost Summary <br /> sheets,included in your contract. Depending which option was chosen on your contract,the line item will read as follows: <br /> Net: 10 Year Refundable Adavance Option Payment,or <br /> Net: Non Refundable Discount Option Payment <br /> 8. Total Allowances-Credit granted on your residential contract is based on information provided on your Application for Service. <br /> On a non-residential contract the allowance is based on the estimated distribution revenue that will be generated by the <br /> extension.Allowance can be located on page 2 of your Electric and or Gas Cost Summary sheets included in your contract. <br /> 9. Credit for Applicant Performed Work-Credit provided to the customer for Applicant Design or Applicant Performed Work. <br /> Credits for Applicant Performed Work can be located on page 2 of your Electric and or Gas Cost Summary sheets,included in <br /> your contract,under the headings of 10 Year Refundable Advance Option or Non-Refundable Discount Option. <br /> 0. Customer Refundable Balance-The remainh.g bal^nce subject to future refunds. Refunds only apply if the 10 Year Refundable <br /> Advance Option was chosen on your contract and specified conditions are met per the contract. <br /> 11. Unpaid Deficiency Bills-Bill issued when Allowances given were not justified.(See#4 above.) Bill issued but unpaid. <br /> 1.2. Accumulated Cost of Ownership-Monthly Cost of Ownership charge is based on the Remaining Refundable Balance plus <br /> Deficiency Balance(excluding Tax)multiplied by the current Cost of Ownership percentage. <br /> Page 2 of 3 <br /> 62-0977(04-06) s•o:.,,.,,............___.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.