Laserfiche WebLink
MALL WATER SYSTEM <br />OFFICIAL INSPECTION REPORT <br />SAN JOAQUIN COUNTY PUBLIC HEALTH SERVICES <br />ENVIRONMENTAL HEALTH DIVISION <br />304 EAST WEBER AVENUE, STOCKTON, CA 95202 <br />(209) 468-3420 <br />FAX (209) 468-3433 <br />F <br />Facility r 7 DateMao az • 1 <br />Address <br />q u. <br />Type of System . <br />R E H S Y' n �I L <br />(VIQ e <br />Service <br />�Ir l <br />Received by <br />,,Q�"" <br />l 65, s r e s -m t4 hi !E-� r <br />Ghs&] t4,n w <br />�V is <br />�i <br />r/ k4� q14 <br />/0' '9'P Le4 <br />areR n'4 J'a oi'e'l <br />it ir-A1, 4�� J��4 U"� <br />r <br />7 r <br />Jv�k <br />` da d4rs nA <br />_7W <br />4� 1 1 f <br />k56 a IN lAyi I, <br />I&W k I m ij�& Af <br />All testable backflow -4 ---tion devices are required to be tested by a State certified tester annually and the results submitted to the <br />Environmental Health Division (EHD). <br />Title 22 of the California Code of Regulations requires routine monitoring of your water system by a State certified laboratory. <br />Sampling must be performed by State certified laboratory personnel. All samples shall be taken at the wellhead, except for <br />bacteriological sampling. The EHD strongly recommends the use of non -threaded, dedicated sample taps for bacteriological sampling <br />in the distribution system. <br />Bacteriological: Required quarterly/monthly. Continue testing quarterly/monthly unless a sample tests positive for coliform. After a <br />positive, four repeats must be taken within 24 hours of being notified by your laboratory and five routine samples shall be taken the <br />following month. Please he aware that the bacteriological results collected for a system in a calendar month shall be reported to the <br />EHD no later than the tenth clay of the following month. <br />Nitrates: Required quarlerlylannually. <br />Nitrites: Required quarterly/once every three years. <br />Inorganic Chemicals: Required once every three years. The EHD currently waives asbestos and cyanide. <br />Volatile Organic Compounds (VOCs): Required once every three/six years. <br />Synthetic Organic Compounds (SOCs): DBCP and EDB are required once every three years. <br />Lead and Copper: Required annually/once every three years. One complete sample set is to be taken <br />between the months of June through September. <br />Secondary (Aesthetics): General Mineral and General Physical Are due every 3 years. <br />Radiological: Required every four years if compliance is met by conducting four consecutive calendar <br />quarterly samples. <br />Compliance date for all outstanding lab results: tq' I r 132 45F fiokr'--e� <br />Pagef l of <br />�Im <br />