Laserfiche WebLink
unv!hi^a :es .Inq i:og <br />.` -, _stat •....:..... <br />.r.- ... y.r.<. , .moo :.s .r.•.e:tere w h tr.r r <br />.«.jncA by <br />rhr .. ...• ). 1 <br />. .e . •• ir:A .7.. ..'9•.: u: l.nfl. f es!l uCli. ,.J .. .1. - <br />«... Any vu.. oI: !nom —11.1 f <br />- Ar <br />thA! .utt.i ,e,... .,.. t f>c •.r.::...1 r•;,••7 ,, J a.. : t}' prr lw ,., c. <br />f, <br />ns <br />ne`si site be preparedCandoperared by tedinA ccordancewithentitle�c�Geoteclndat �cal <br />4.uresentev in the retx)rt p <br />nvesticatTon and Haste tia.'agement Studies", Pro sou 15datedcJuly17, 1972, <br />Dinposa'< <br />site, Stockton, Cali:ornla, for Forward, Inc., <br />^.clued; proposed berms for floor? protection; <br />.nc u -nc: . shall be. flood hoofed to protect the building `_rpm Inter- <br />.�: iatc 2egaorral Flood, now estimated to be sli flooding less thi.^. feet <br />:cep on the average: <br />A Ileve'_opment Plan indicating the on-site: roadways and parking areas, <br />locati,)n of all buildings and structures involved in monitoring the <br />oacrati r., depth and Neigh of land:ill, protective berms, tencee an;:: <br />Iands�aping proposed to reduze noise, approved by the Planning Director; station and <br />%-� Public a:-.--* vehicular traffic shall be route in the re°overy <br />-not d:ectly to t^' disposal site; <br />Surface run off u� sto`m waters from the disposal site shall be drained <br />to South L:' le John C=eek; <br />�crm4 shall be maintained at he.il)hts that will prevent refuse .`ro�1 being <br />carried ,downstrea.i during :nigh water: <br />lo. Subject to all rpq;iremconiitionsts of cagop r Ord cal l.nancesB77cand nRules�end c <br />appiic;tionand <br />Regulations for operation of a Sanitary Lan fill; <br />11. Confcr^•ance to all criteria, discharge spec.fications, monitoring and <br />rur;oa°ing provisicns• and r°-quirements for d`_scontinuance o: the <br />trol s,ard, Central valley RC910n; <br />Califc n:a Regional :�Jter Quality `neral public, unless decided otherwise <br />The'site shall not be o en to g o the public sham r,e <br />by the. Board of S11ae_v1sors. Any fees c ge <br />subject to approval by the Board of Supervisors; <br />1.3; ,post. a bond in an aunt determined by the Public works <br />Applicant shall <br />Department U be sufficient t restore the site in the event the applicant <br />terminates the project and fails to comply war;: all conditions ofd approval, <br />subject to approval by the Board of SupervisO`5 <br />tan may be revised, subje'tt to approval of <br />to Feb. 15, 1974. Such re-use p <br />I4. A re-use plan o£ the site to be approved by the Board of supervisors pr_o <br />the Board of supervisors, to s.•rve changing needs;. <br />15. Cannery wastes shall n:'t be dis osed of u on the site. <br />